Permit: DP14-0029
Permit Details
Status:
Complete
Type:
Development Package
Address:
837 W IRVINGTON RD
Address NEW:
837 W IRVINGTON RD
Apply Date:
02/20/2014
Applicant:
Lisa Bowers
Description:
SITE/GRADING: NEW CAR WASH
Permit Reviews
Permit Number - DP14-0029
Permit Status: Complete
Permit Description: SITE/GRADING: NEW CAR WASH
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2014 | DEV PKG - OK TO SUBMIT | 02/20/2014 | COMPLETED |
| 02/20/2014 | SITE and/or GRADING | 05/01/2014 | COMPLETED |
| 05/01/2014 | RESUB - SITE/GRADING ALL | 05/23/2014 | COMPLETED |
| 06/02/2014 | RESUB - SITE/GRADING ALL | 07/02/2014 | COMPLETED |
| 06/12/2015 | REVISION - SITE | 06/19/2015 | ACTIVE |
| 07/02/2014 | RESUB - SITE and/or GRADING | 09/03/2014 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0029
Permit Description: SITE/GRADING: NEW CAR WASH
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/21/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by ARUIZ1 - } ; {Activity date: 10/24/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT TRACK OUT AND TO PROVIDE CONCETE WASH OUT.} | |
| 04/21/2015 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/21/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by ARUIZ1 - } | |
| 04/21/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 04/21/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by ARUIZ1 - } ; {Activity date: 09/23/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR FOR THE SITE AND ADVISED THAT THE SITE WILL NEED TO BE MAINTAINED SO THAT MATERIAL IS NOT CARRIED OUT INTO THE STREET. RON WILL COMPLETE THIS INSPECTION WHEN HE RETURNS NEXT WEEK AND WILL PASS OUT THE PRE-CON PACKET.} | |
| 06/04/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/04/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/04/2015 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/04/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 10/18/2022 | ENGR Engineering Final | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/04/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE AP AS-BUILTS AND CERT LETTER FROM THE ENGINEER OF RECORD.} ; {Activity date: 05/14/2015; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED OVER THE SITE AND HAVE ASKED THE CONTRACTOR TO PROVIDE THE AS-BUILT DRAWINGS AND A CERTIFICATION LETTER FOR THIS SITE. ALSO THE GATES ON THE TRASH ENCLOSURE HAS NOT BE INSTALLED AT THIS TIME AND SHOULD BE IN BY NEXT WEEK. GENERAL CLEAN UP OG THE SITE IS NEEDED PRIOR TO SCHEDULING FOR THE FINAL INSPECTION.} ; {Activity date: 04/21/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by ARUIZ1 - } | |
| 10/18/2022 | ENGR Grading Final | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/21/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by ARUIZ1 - } ; {Activity date: 09/23/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MINOR CONFLICTS WITH THE SWG PIPE LINE MAY NEED TO BE DISCUSSED WITH THE ENGINEER OF RECORD FOR THIS SITE. CURRENTLY THE CONTRACTOR IS WORKING ON THE GASLINE ON THE SOUTHSIDE OF THE SITE AT THIS TIME.} |