Permit: DP13-0248
Permit Details
Status:
Complete
Type:
Development Package
Address:
9105 E CAMINO ABRIL
Address NEW:
9105 E CAMINO ABRIL
Apply Date:
12/13/2013
Applicant:
Description:
SITE/GRADING- RITA RANCH
Permit Reviews
Permit Number - DP13-0248
Permit Status: Complete
Permit Description: SITE/GRADING- RITA RANCH
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/10/2014 | RESUB - SITE and/or GRADING | 10/09/2014 | COMPLETED |
| 09/28/2015 | REVISION - - 1ST | 09/30/2015 | COMPLETED |
| 10/09/2014 | RESUB - SITE and/or GRADING | 09/28/2015 | COMPLETED |
| 12/13/2013 | DEV PKG - OK TO SUBMIT | 12/13/2013 | COMPLETED |
| 12/18/2013 | SITE and/or GRADING | 01/21/2014 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0248
Permit Description: SITE/GRADING- RITA RANCH
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 12/08/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN ONE ACRE, NO SWPPP REQUIRED. 2) MUST KEEP SOIL ON SITE. 3) SEDIEMNT CONTROLS INSTALLED. 4) CALL FOR INSPECION FOR ANY CHANGES} |
|
| 12/08/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/08/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN ONE ACRE, NO SWPPP REQUIRED. 2) MUST KEEP SOIL ON SITE. 3) SEDIEMNT CONTROLS INSTALLED. 4) CALL FOR INSPECION FOR ANY CHANGES} ; {Activity date: 12/05/2014; Status: Cancelled; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RAINING} |
|
| 12/04/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/04/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/07/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SOUTH SECTION OF SITE HAS BEEN STABILIZED WITH HYDROSEED 2) SEDIMENT CONTROLS IN PLACE AND MUST BE MAINTAINED} |
|
| 12/04/2015 | ENGR Engineering Final | Passed | {Activity date: 12/04/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEE NOTE #27 AN PAGE #1 ON APPROVED PLANS} | |
| 12/04/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 12/04/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/22/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AT THIS TIME} ; {Activity date: 10/16/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 10/07/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 10/02/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/ OR CONCERNS AT THIS TIME} ; {Activity date: 09/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/12/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME- NO ACTIVITY} ; {Activity date: 06/05/2015; Status: Continued; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - NO CONSTRUCTION ACTIVITY AT THIS TIME} ; {Activity date: 05/08/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONSTRUCTION ACTIVITY AT THIS TIME NO STORM WATER CONCERNS} ; {Activity date: 03/24/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by ARUIZ1 - 1. CONTRACTOR INSTALLING GABIONS ALONG CROSSING AT SE CORNER OF SITE 2. TOOK PICTURES OF ROCK RIP RAP WORK ALONG ALL DRAINAGES 3. STORM WTR PIPE INSTALLED HEAD WALL CONSTRUCTED} ; {Activity date: 03/06/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/04/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/03/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/10/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER/SITE CONCERNS AT THIS TIME} ; {Activity date: 02/02/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/22/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE EAST SIDE OF THE PROJECT PER THE APPROVED SWPPP AND THE PRE-CON INSPECTION RECOMMENDATIONS. 2) NOI IS POSTED AT THE ENTRANCE TO THE SITE 3) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED 4) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS 5) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 6) MAY NEED TO ADD SEDIMENT CONTROLS ALONG THE DRAINAGE ON THE NORTH SIDE OF THE SITE} |
|
| 12/04/2015 | ENGR Grading Final | Passed | {Activity date: 12/04/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 12/04/2015 | SITE - Stormwater Final Inspection | Passed | {Activity date: 12/04/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |