Permit: DP13-0248

Parcel: 141113850


Addresses:

9105 E CAMINO ABRIL

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
12/04/2015 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
10/22/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO CHANGES AT THIS TIME
10/16/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO ACTIVITY, NO CHANGES AND/OR CONCERNS AT THIS TIME
10/07/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME
10/02/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/ OR CONCERNS AT THIS TIME
09/15/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME
08/12/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
06/18/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME- NO ACTIVITY
06/05/2015 SITE - Stormwater Follow-up MRUSSO1 Continued Entered by DROBERT5 - NO CONSTRUCTION ACTIVITY AT THIS TIME
05/08/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO CONSTRUCTION ACTIVITY AT THIS TIME NO STORM WATER CONCERNS
03/24/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by ARUIZ1 - 1. CONTRACTOR INSTALLING GABIONS ALONG CROSSING AT SE CORNER OF SITE 2. TOOK PICTURES OF ROCK RIP RAP WORK ALONG ALL DRAINAGES 3. STORM WTR PIPE INSTALLED HEAD WALL CONSTRUCTED
03/06/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
03/04/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
03/03/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/10/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO STORM WATER/SITE CONCERNS AT THIS TIME
02/02/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
01/22/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE EAST SIDE OF THE PROJECT PER THE APPROVED SWPPP AND THE PRE-CON INSPECTION RECOMMENDATIONS. 2) NOI IS POSTED AT THE ENTRANCE TO THE SITE 3) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED 4) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS 5) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 6) MAY NEED TO ADD SEDIMENT CONTROLS ALONG THE DRAINAGE ON THE NORTH SIDE OF THE SITE