Permit: DP13-0231
Permit Details
Status:
Complete
Type:
Development Package
Address:
8103 E ESCALANTE RD
Address NEW:
8103 E ESCALANTE RD
Apply Date:
11/21/2013
Applicant:
Description:
DP- SITE AND GRADING
Permit Reviews
Permit Number - DP13-0231
Permit Status: Complete
Permit Description: DP- SITE AND GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/23/2014 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 08/19/2014 | COMPLETED |
| 11/07/2014 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 06/30/2016 | COMPLETED |
| 11/21/2013 | DEV PKG - OK TO SUBMIT | 11/25/2013 | COMPLETED |
| 11/25/2013 | TENTATIVE PLAT REVIEW | 05/23/2014 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0231
Permit Description: DP- SITE AND GRADING
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2022 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 09/23/2022 | ENGR Engineering Final | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/04/2014; Status: Prior to Final Inspectn; Inspector: jgreen; Comment: Entered by JGREEN2 - If the basin location is used as the construction entrance as per the SWPPP then a post percolation test will be required to ensure maximum drain down times due to the trucks and equipment compacting the area.} | |
| 09/23/2022 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 09/23/2022 | ENGR Grading Final | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 09/23/2022 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 09/23/2022 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/28/2017; Status: Violation; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO INSPECTIONS CALLED IN. 2) SITE IN NON-COMPLIANCE WITH THE STORM WATER PERMIT. 3) NO CONTACT WITH CONTRACTOR} |
|
| 09/23/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/13/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP AND PER INSPECTOR RECOMMENDATIONS 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT 3) INSTALL A CONCRETE WASH OUT 4) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE 5) ENSURE YOU PERFORM STORMWATER SELF INSPECTIONS PER YOUR SWPPP 6) FOLLOW YOUR LANDSCAPE PLAN AND ENSURE THE NPPO IS ADHERED TO 7) SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT PUBLIC PROPERTIES} |