Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/23/2022 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 07/13/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by MRUSSO1 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP AND PER INSPECTOR RECOMMENDATIONS
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT
3) INSTALL A CONCRETE WASH OUT
4) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
5) ENSURE YOU PERFORM STORMWATER SELF INSPECTIONS PER YOUR SWPPP
6) FOLLOW YOUR LANDSCAPE PLAN AND ENSURE THE NPPO IS ADHERED TO
7) SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT PUBLIC PROPERTIES |