Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/23/2022 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 06/04/2014 |
ENGR Engineering Final
|
jgreen |
Prior to Final Inspectn |
Entered by JGREEN2 - If the basin location is used as the construction entrance as per the SWPPP then a post percolation test will be required to ensure maximum drain down times due to the trucks and equipment compacting the area. |