Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/14/2013
Applicant:
Description:
GRADING , DRAINAGE, AND SWPPP ONLY

Permit Reviews

Permit Number - DP13-0228
Permit Status: Complete
Permit Description: GRADING , DRAINAGE, AND SWPPP ONLY
Start Date Submittal Complete Date Status  
01/30/2014 RESUB - SITE and/or GRADING 02/18/2014 COMPLETED Review Details
02/02/2015 REVISION - - 1ST 02/13/2015 ACTIVE Review Details
04/15/2014 RESUB - SITE and/or GRADING 04/28/2014 COMPLETED Review Details
04/28/2014 RESUB - SITE and/or GRADING 05/01/2014 COMPLETED Review Details
11/14/2013 DEV PKG - OK TO SUBMIT (GRADING ONLY) 11/14/2013 COMPLETED Review Details
11/22/2013 GRADING 01/22/2014 COMPLETED Review Details

Conditions

Permit Number - DP13-0228
Permit Status: Complete
Permit Description: GRADING , DRAINAGE, AND SWPPP ONLY
Date Description Comments
04/24/2014 The following 20 conditions apply to DP13-0228:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at Planning & Development Services Department (PDSD), or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://cms3.tucsonaz.gov/pdsd/inspections2)Some grading or other construction activities will require separate special inspections by EOR or consultants. During these inspections it is recommended that PDSD Inspectors are present. Discuss during Pre-con or contact PDSD Engineering Inspector to confirm which inspections may be needed. 3)Special TDOT improvements shall be completed as a part of the improvements prior to release of CofO. See PIA plans.4)No trees shall be located within the SVT's. Field adjustment of new trees may needed in SVT locations. EOR shall assist contractor to assure placement of proposed trees and any other proposed plants are outside of SVT's. As-built certification is required by EOR prior to final grading approval.5)Any existing trees within SVT's shall be checked and trimmed to assure that they are clear of leaves and branches to a height of at least six feet above grade. Location of trees within existing and future sight visibility triangles may be restricted or modified as determined by EOR or City of Tucson Inspectors in order to preserve visibility.6)Project shall conform to recommendations and requirements found on approved plans for Block 14 Master Grading & Private Drainageway Plans and associated approved documents including geotechnical engineering reports by Pattison-Evanoff Engineering Project Nos. 13-170, 13-134, 13-179 for this project and any subsequent approved addenda.7)Contractor is responsible to protect in place any existing utilities; all work within these easements must be coordinated with the proper utilities prior to any site construction. All recordation dkt/pg or sequence numbers shall be listed on subsequent plans for revisions or as-builts.8)A copy of stamped approved grading plan(s), permit(s), NOI, AzPDES general permit, geotechnical report/addenda, and other reports shall be kept at site at all times, until final grading approval.9)Disturbance Limits shall be maintained and no disturbance outside of approved project limits will be allowed. Stop Work Order may be issued if disturbance occurs outside of approved limits as shown on approved plans. There shall be no disturbance, construction vehicle traffic or parking, or stockpiling in Block 13 (north of Block 14).10)Interim control measures shall be placed within approved project limits. After interim controls are removed, permanent erosion control are required on all disturbed areas, in form of vegetative cover, gravel, a sized decorative rock, and/or other controls. Prior to final approval all temporary controls shall be removed and permanent controls shall be functioning in place.11)Stabilized entrances shall be maintained at all active access entrances. Use of water trucks or other dust controls shall be utilized, and construction entrances shall be maintained to minimize sedimentation, dust issues, and tracking. 12)During construction activities, traffic control plans may be required if there is a safety hazard potential from construction activities conflicting with public traffic. Contractor to work with EOR and coordinate with Inspectors on any adjustments to traffic controls to assure safe construction traffic.13)Any revisions to Grading Plan sheets must be reviewed by PDSD Engineering Engineer and may include discussion, details, or a revised grading plan. Call PDSD Engineering Division at 791-5550 to discuss any revisions. 14)If grading construction is expected to last longer than expiration date of permit, contact PDSD to renew/extend permit. If final grading inspection has not been completed before permit expires, and permit has not been renewed, additional fees and reviews may be required. Requests for permit extensions may be submitted to Planning & Development Services Department (attn: Claudia Buford), prior to permit expiration date, for consideration of grading plan extension approval.15)For inspection purposes, post City of Tucson's "AZPDES - Posting Requirements" green sheet, or the NOI at construction entrance of site, at beginning of construction activities, and maintain this posted document throughout project construction.16)Operator shall report to ADEQ any noncompliance (including spills) which may endanger human health or the environment. Operator shall orally notify office listed below within 24 hours: Arizona Department of Environmental Quality, 1110 W. Washington, 5th floor (5515B-1), Phoenix, AZ 85007 Office: 602-771-4466; Fax 602-771-450517)Receiving waters are 18th Street Wash18)Any remaining signatures from Operators must be on site copy of SWPPP (exhibit or report) at or before commencement of construction. All Operators shall be identified and have separate certification statements. Assure these certifications are available on-site.19)Permitee shall notify PDSD when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all erosion control measures have been completed in accordance with approved grading plan and grading permit, and all conditions of permit are completed. 20)As-builts are required to be submitted. The as-built / "Final Revised Grading Plan" and substantial completion letter(s) may be submitted under activity number DP13-0228 to PDSD permit clerks. The documents will be reviewed and then if acceptable, a copy of the as-builts will be provided to PDSD Engineering Inspector for final grading inspections. For grading permit project closure documentation, submit: one copy of original grading plans, 2 copies of sheets that show as-built information, letters of completion (one for drainage improvements, and another letter for substantial completion of overall project). As-builts shall include: seal on sheets that show as-built data, elevations of constructed weir, inverts drainage systems, access entrance areas, and general grades as determined by RLS to show substantial completion for onsite improvements of project.

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0228
Permit Description: GRADING , DRAINAGE, AND SWPPP ONLY
Total Completed Inspections - 7
Date Description Inspector Results Comments
05/08/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/08/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE.}
05/14/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 05/14/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/08/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET INSTALL OF CONTROLS.}
01/26/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/26/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/26/2015 SITE - Stormwater Follow-up Passed {Activity date: 01/26/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/26/2015 SITE - Stormwater Final Inspection Passed {Activity date: 01/26/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
02/11/2015 ENGR Engineering Final Passed {Activity date: 02/11/2015; Status: Approved; Inspector: eleibol1; Comment: Entered by ELEIBOL1 - Acceptable per final inspections with Inspector 3FEB15. Further ponding issues at the site will be subject to requiring re-engineering of spillway outlet to meet 24-hr drain down time. Owner shall be responsible to maintain NW slope at end of ret wall (they may need o added eros protection), and owner is responsible to maintain restricted vehicular access for area north of Culvers.}
02/11/2015 ENGR Grading Final Passed {Activity date: 02/11/2015; Status: Approved; Inspector: eleibol1; Comment: Entered by ELEIBOL1 - }

Documents

File Name Document Type  
001_G-1.TIF GRADING PLANS VIEW
002_G-2.TIF GRADING PLANS VIEW
003_G-3.TIF GRADING PLANS VIEW
004_G-4.TIF GRADING PLANS VIEW
005_G-5.TIF GRADING PLANS VIEW
006_SWMP-1.TIF GRADING PLANS VIEW
007_SWMP-2.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW
REVISION #1, FEB. 2015.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW