Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
1005 E FORT LOWELL RD
Apply Date:
10/28/2013
Applicant:
Description:
DP- KODAC

Permit Reviews

Permit Number - DP13-0217
Permit Status: Complete
Permit Description: DP- KODAC
Start Date Submittal Complete Date Status  
03/24/2014 DEV PKG - RESUBMITTAL 04/30/2014 COMPLETED Review Details
05/27/2014 DEV PKG - RESUBMITTAL 07/02/2014 COMPLETED Review Details
07/02/2014 DEV PKG - RESUBMITTAL 07/08/2014 COMPLETED Review Details
10/28/2013 DEV PKG - OK TO SUBMIT 10/28/2013 COMPLETED Review Details
10/28/2013 DEV PKG 12/06/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0217
Permit Description: DP- KODAC
Total Completed Inspections - 7
Date Description Inspector Results Comments
08/06/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/06/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS < 1 AC THEREFORE A SWPPP AND STORM WATER PERMIT IS NOT REQUIRED. HOWEVER SOIL MUST BE KEPT ON SITE DURING CONSTRUCTION, TO INCLUDE TRACK OUT. ADD A STABILIZED ENTRANCE/EXIT ALONG FT LOWELL
2) CALL FOR INSPECTION FOR REBAR LAYOUT OF FOOTINGS FOR WALL AND TRASH ENCLOSURE.
3) WILL VERIFY NPPO STATUS W/ LANDSCAPE REVIEWER
4) CALL FOR ANY SITE/GRADING CHANGES AND/OR CONCERNS.
5) WILL RE-INSPECT FOR CONSTRUCTION PROGRESS}
12/31/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 12/31/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/06/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE SOUTH SW SIDE OF SITE}
01/08/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/08/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 12/31/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/08/2015 SITE - Stormwater Follow-up Passed {Activity date: 01/08/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/06/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/17/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 12/15/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/19/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 11/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORMWATER CONCERNS AT THIS TIME} ; {Activity date: 10/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR COCNERNS AT THIS TIME} ; {Activity date: 09/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME.
2) INSPECTED RE-BAR LAY OUT FOR PERIMETER WALL FOOTINGS/INSTALLED PER PLAN #5 @ 32" OC PICTURES TAKEN.
}
01/08/2015 SITE - Stormwater Final Inspection Passed {Activity date: 01/08/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOU SUBMIT A NOTICE OF TERMINATION TO ADEQ} ; {Activity date: 12/31/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/27/2015 ENGR Engineering Final Passed {Activity date: 01/27/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/21/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING FINAL} ; {Activity date: 01/08/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE ALL SITE/GRADING
2) PROVIDE A CERT STATEMENT FORM THE ENG OF RECORD
3) SUBMIT AN AS-BUILT TO THE COT}
02/02/2015 ENGR Grading Final Passed {Activity date: 02/02/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_1 OF 14.TIF DEVELOPMENT PACKAGE VIEW
002_BOUNDARY PLAN / REZONING CONDITIONS_2 OF 14.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 14.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / UTILITIES / NOTES_4 OF 14.TIF DEVELOPMENT PACKAGE VIEW
005_DETAILS_5 OF 14.TIF DEVELOPMENT PACKAGE VIEW
006_LANDSCAPE COVER SHEET_6 OF 14.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE_7 OF 14.TIF DEVELOPMENT PACKAGE VIEW
008_IRRIGATION_8 OF 14.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE CONSTRUCTION DETAILS_9 OF 14.TIF DEVELOPMENT PACKAGE VIEW
010_IRRIGATION CONSTRUCTION DETAILS_10 OF 14.TIF DEVELOPMENT PACKAGE VIEW
011_IRRIGATION CONSTRUCTION DETAILS_11 OF 14.TIF DEVELOPMENT PACKAGE VIEW
012_RAINWATER HARVESTING_12 OF 14.TIF DEVELOPMENT PACKAGE VIEW
013_DEMOLITION PLAN_13 OF 14.TIF DEVELOPMENT PACKAGE VIEW
014_PHOTOMETRICS_14 OF 14.TIF DEVELOPMENT PACKAGE VIEW
015_ELECTRICAL PLAN_E0.1.TIF DEVELOPMENT PACKAGE VIEW
SWG LETTER.PDF DOCUMENTS VIEW
SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY.PDF DOCUMENTS VIEW
DP13-0217 TUCSON WATER.PDF DOCUMENTS VIEW
SWG DP13-0217.PDF DOCUMENTS VIEW
SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW