Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/08/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 01/06/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR PAVED SITE,
2) LANDSCAPE MOSTLY COMPLETE
3) COMPLETE STRIPING AND INSTALL HC PARKING |
| 12/17/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - CONTRACTOR PREPING FOR PAVING, HOWEVER RAIN IS FORCAST FOR THE NEXT DAY. |
| 12/15/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - PAVING NEXT WEEK, SUBGRADE SET |
| 11/19/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO SITE/GRADING CONCERNS AT THIS TIME |
| 11/13/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) PAVING SOON CALL FOR INSPECTION AT SUBGRADE
2) BUBBLERS WILL BE INSTALLED AT TWO ROOF DRAINS
3) NO SWPPP, HOWEVER ENSURE TRACKING ON PUBLIC ROADWAY IS SWEEPED UP |
| 10/29/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) WALKED SITE
2) SOME CHANGES TO SIDEWALK SCUPPERS
3) ANY SIGNIFCANT CHANGES TO THE APPROVED SITE/GRADING PLAN MUST BE REVISED AND APPROVED.
4) PROVIDE A CERT STATEMENTAND AS-BUILT FROM THE EOR PRIOR TO FINAL. |
| 10/09/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR COCNERNS AT THIS TIME |
| 10/06/2014 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - MET WITH THE CONTRACTOR ONSITE AND LOOKED OVER THE HANDICAP ACCESS RAMP THAT IS LOCATED ON THE NORTH SIDE OF THE BUILDING. THIS RAMP EXCEEDS THE 5% SLOPE GRADE FOR THE RAMP AND RISES MORE THAN SIX INCHES SO IT WILL REQUIRE A CONTINOUS HANDRAIL ON BOTH SIDES OF THE RAMP. MET WITH RON BROWN AND VERIFIED THE HANDRAIL WHEN I RETURNED DOWNTOWN, ADVISED THE CONTR4ACTOR OF THE SAME. |
| 09/04/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME.
2) INSPECTED RE-BAR LAY OUT FOR PERIMETER WALL FOOTINGS/INSTALLED PER PLAN #5 @ 32" OC PICTURES TAKEN.
|
| 01/08/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 11/13/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - RE-BAR LAY OUT FOR TRASH ENCLOSURE FOOTING AT NE CORNER OF SITE. NO INSPECTION CALLED IN |
| 09/04/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - INSPECTED RE-BAR LAY OUT FOR PERIMETER WALL FOOTINGS/INSTALLED PER PLAN #5 @ 32" OC PICTURES TAKEN. |
| 09/03/2014 |
ENGR Grading Final |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - RI canceled |
| 02/02/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 02/02/2015 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |