Permit: DP13-0212
Permit Details
Status:
Complete
Type:
Development Package
Address:
6125 E SPEEDWAY BL
Address NEW:
6125 E SPEEDWAY BL
Apply Date:
10/22/2013
Applicant:
Description:
SITE/GRADING
Permit Reviews
Permit Number - DP13-0212
Permit Status: Complete
Permit Description: SITE/GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/21/2014 | RESUB - SITE/GRADING ALL | 02/18/2014 | COMPLETED |
| 02/19/2014 | RESUB - SITE and/or GRADING | 02/19/2014 | COMPLETED |
| 10/22/2013 | SITE and/or GRADING | 10/22/2013 | COMPLETED |
| 10/22/2013 | SITE and/or GRADING | 11/22/2013 | COMPLETED |
Conditions
Permit Number - DP13-0212
Permit Status: Complete
Permit Description: SITE/GRADING
| Date | Description | Comments |
|---|---|---|
| 01/23/2014 | FIRE SPRINKLER UNDERGROUND PIPING PERMIT REQUIRED PRIOR TO INSTALLATION. |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0212
Permit Description: SITE/GRADING
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/20/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/16/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT TRACK OUT.} | |
| 11/20/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/20/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 11/20/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/20/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 11/21/2014 | ENGR Engineering Final | Passed | {Activity date: 11/21/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GC INSTALLED SHORT TERM BIKE PARKING.} ; {Activity date: 11/20/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT WORK TO FINAL.} | |
| 12/16/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/16/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 12/16/2014 | ENGR Grading Final | Passed | {Activity date: 12/16/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/07/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT HDPE PIPING CHANGES IN SIZE PROVIDE REVISION FOR ALL CHANGES.} | |
| 12/23/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/23/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |