Permit: DP13-0157
Permit Details
Apply Date:
08/19/2013
Applicant:
Description:
SITE/GRADING/SWPPP: CHEDDAR'S AT EL CON MALL
Permit Reviews
Permit Number - DP13-0157
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP: CHEDDAR'S AT EL CON MALL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/19/2013 | DEV PKG - OK TO SUBMIT | 08/19/2013 | COMPLETED |
08/19/2013 | DEV PKG | 09/19/2013 | COMPLETED |
09/19/2013 | DEV PKG - RESUBMITTAL | 10/24/2013 | COMPLETED |
11/26/2013 | DEV PKG - RESUBMITTAL | 04/15/2014 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0157
Permit Description: SITE/GRADING/SWPPP: CHEDDAR'S AT EL CON MALL
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/30/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 04/30/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS < 1 ACRE THEREFORE A STORM WATER PERMIT IS NOT REQUIRED ; HOWEVER DISTURBED SOIL MUST REMAIN ON SITE THROUGHOUT CONSTRUCTION. 2) SEDIMENT CONTROLS HAVE BEEN INSTALLED AROUND THE EXISTING CATCH BASIN AND ALONG THE WEST AND SOUTH PERIMETER. 3) SWEEP UP TRACKED SOIL OFF PARKING AREA ROUTINELY. 4) CALL FOR INSPECTION PRIOR TO COVERING UNDERGROUND STORM WATER WORK OR IF YOU HAVE CONCERNS/CHANGES} |
|
05/14/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/14/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS HAVE BEEN INSTALLED} | |
09/11/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/11/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/30/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR STATED HE WOULD PROVIDE PICTURES OF STORM PIPE CONNECTIONS 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/23/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 06/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES, NO CONCERNS AT THIS TIME CONTRACTOR TO START SITE WORK NEXT WEEK} ; {Activity date: 06/05/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/30/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME 2) MINIMAL SITE WORK HAS BEEN DONE, HOWEVER SOME STORM WATER PIPE WILL BE INSTALLED WITH CATCH BASINS AND TWO RET/DET BASINS 3) CALL FOR INSPECTION FOR ANY CHANGES AND/OR CONCERNS} ; {Activity date: 05/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) CONTRCTOR WORKING ON UTILITY INSTALL AND BLDG PAD} ; {Activity date: 05/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} |
|
09/12/2014 | ENGR Grading Final | Passed | {Activity date: 09/12/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/11/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR PREPING SUB-GRADE FOR PAVING} ; {Activity date: 07/30/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR STATED HE WOULD PROVIDE PICTURES OF STORM PIPE CONNECTIONS 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/23/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROVIDE PICTURES OF SUBGRADE STORM PIPE INSTALLED} ; {Activity date: 07/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CALL IN FOR INSPECTION FOR ANY UNDERGROUND WORK} ; {Activity date: 06/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES, NO CONCERNS AT THIS TIME CONTRACTOR TO START SITE WORK NEXT WEEK} ; {Activity date: 05/30/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME 2) MINIMAL SITE WORK HAS BEEN DONE, HOWEVER SOME STORM WATER PIPE WILL BE INSTALLED WITH CATCH BASINS AND TWO RET/DET BASINS 3) CALL FOR INSPECTION FOR ANY CHANGES AND/OR CONCERNS} ; {Activity date: 05/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) CONTRCTOR WORKING ON UTILITY INSTALL AND BLDG PAD} |
|
09/12/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/12/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SUBMIT A NOTICE OF TERMINATION (NOT) TO ADEQ} ; {Activity date: 09/11/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
10/07/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 10/07/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/25/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE LANDSCAPING PER APPROVED PLANS, CALL FOR RE-INSPECTION} ; {Activity date: 09/12/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE LANDSCPAING PER PLAN 2) INSTALL WHEEL STOPS AND HC SIGNS IN PARKING AREA 3) INSTALL ROCK RIP RAP IN AREAS SHOWN ON APPROVED GRADING PLAN 4) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD 5) PROVIDE AN AS-BUILT TO THE CITY OF TUCSON} ; {Activity date: 09/11/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |
|
10/07/2014 | ENGR Engineering Final | Passed | {Activity date: 10/07/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/25/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE CERT STATEMENT FROM ENG OF RECORD 2) COMPLETE CONSTRUCTION} ; {Activity date: 09/16/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING FINAL SEE PUNCHLIST} ; {Activity date: 09/12/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE LANDSCPAING PER PLAN 2) INSTALL WHEEL STOPS AND HC SIGNS IN PARKING AREA 3) INSTALL ROCK RIP RAP IN AREAS SHOWN ON APPROVED GRADING PLAN 4) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD 5) PROVIDE AN AS-BUILT TO THE CITY OF TUCSON} |