Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 04/30/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SITE IS < 1 ACRE THEREFORE A STORM WATER PERMIT IS NOT REQUIRED ; HOWEVER DISTURBED SOIL MUST REMAIN ON SITE THROUGHOUT CONSTRUCTION.
2) SEDIMENT CONTROLS HAVE BEEN INSTALLED AROUND THE EXISTING CATCH BASIN AND ALONG THE WEST AND SOUTH PERIMETER.
3) SWEEP UP TRACKED SOIL OFF PARKING AREA ROUTINELY.
4) CALL FOR INSPECTION PRIOR TO COVERING UNDERGROUND STORM WATER WORK OR IF YOU HAVE CONCERNS/CHANGES |