Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
9100 S HOUGHTON RD
Apply Date:
08/12/2013
Applicant:
Description:
GRADING/SWPPP FOR NEW RETAIL BLDG

Permit Reviews

Permit Number - DP13-0153
Permit Status: Complete
Permit Description: GRADING/SWPPP FOR NEW RETAIL BLDG
Start Date Submittal Complete Date Status  
08/12/2013 DEV PKG - OK TO SUBMIT 08/12/2013 COMPLETED Review Details
08/12/2013 GRADING 10/02/2013 COMPLETED Review Details
10/02/2013 RESUB - SITE and/or GRADING 10/31/2013 COMPLETED Review Details
10/31/2013 RESUB - SITE and/or GRADING 11/20/2013 ACTIVE Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0153
Permit Description: GRADING/SWPPP FOR NEW RETAIL BLDG
Total Completed Inspections - 7
Date Description Inspector Results Comments
12/12/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/12/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT AND DISCUSSED SWPPP, GRADING/SITE WORK, AND LANDSCAPING.
2) ENSURE SEDIMENT CONTROLS ARE INSTALLED ALONG THE PERIMETER OF THE CONSTRUCTION SITE.
3) ENSURE STORM WATER SELF INSPECTIONS/MAINT ARE PERFORMED AND DOCUMENTED PER YOUR PLAN.
4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED.
5) SWEEP UP ANY TRACKED SOIL BACK ON TO YOUR SITE.
6) PLACE SEDIMENT CONTROLS AROUND TEMP STOCKPILE.
CALL FOR RE-INSPECTION PERODICALLY}
12/30/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 12/30/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER THE APPROVED PLANS AND PER THE ENG INSPECTION DONE.
2) ENSURE CONTROLS ARE MAINTAINED THROUGHOUT CONSTR.}
05/02/2014 SITE - Stormwater Follow-up Passed {Activity date: 05/02/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MOST OF THE SITE HAS BEEN STABILIZED AND A NOTICE OF TERMINATION HAS BEEN SENT TO ADEQ; HOWEVER THERE IS A SMALL AREA ALONG THE EAST AND SOUTH PERIMETER HAS NOT BEEN.
2) PER THE CITY OF TUCSON DEV STD FOR GRADING, ANY AREAS DISTURBED BY CONSTRUCTION EITHER DIRECTLY OR INDIRECTLY MUST BE STABILIZED USING ROCK OR HYDROSEED.
3) COMPLETE LANDSCAPING AND STABILIZATION PRIOR TO FINAL APPROVAL} ; {Activity date: 04/18/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 04/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERS AT THIS TIME
2) ENSURE TRACKED SOIL IS SWEPT UP ROUTINELY
3) SITE/GRADING SUBSTANTIALLY COMPLETED
4) LANDSCAPING PARTIALLY DONE} ; {Activity date: 04/22/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG, SITE/GRADING HAS BEEN COMPLETED
2) LANDSCAPING NOT INSTALLED
3) ACCESS AND TRASH ENCLOSURE OK
4) NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/06/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) RE-ESTABLISH SEDIEMNT CONTROLS ALONG THE PERIMETER TO THE SITE.
2) SWEEP UP TRACKED SOIL FROM OFF SITE
3) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM.
4) CALL FOR RE-INSPECTION FOR RE-BAR LAYOUT FOR HEAVY DUTY CONCRETE.} ; {Activity date: 03/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR STARTING TO DO SITE/GRADING WORK.
WILL RE-INSPECT WITH SUPERINTENDENT TO REVIEW PLANS AND SITE SPECIFICS.
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/30/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME}
05/02/2014 SITE - Stormwater Final Inspection Passed {Activity date: 05/02/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MOST OF THE SITE HAS BEEN STABILIZED AND A NOTICE OF TERMINATION HAS BEEN SENT TO ADEQ; HOWEVER THERE IS A SMALL AREA ALONG THE EAST AND SOUTH PERIMETER HAS NOT BEEN.
2) PER THE CITY OF TUCSON DEV STD FOR GRADING, ANY AREAS DISTURBED BY CONSTRUCTION EITHER DIRECTLY OR INDIRECTLY MUST BE STABILIZED USING ROCK OR HYDROSEED.
3) COMPLETE LANDSCAPING AND STABILIZATION PRIOR TO FINAL APPROVAL}
05/14/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/14/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/02/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MOST OF THE SITE HAS BEEN STABILIZED AND A NOTICE OF TERMINATION HAS BEEN SENT TO ADEQ; HOWEVER THERE IS A SMALL AREA ALONG THE EAST AND SOUTH PERIMETER HAS NOT BEEN.
2) PER THE CITY OF TUCSON DEV STD FOR GRADING, ANY AREAS DISTURBED BY CONSTRUCTION EITHER DIRECTLY OR INDIRECTLY MUST BE STABILIZED USING ROCK OR HYDROSEED.
3) COMPLETE LANDSCAPING AND STABILIZATION PRIOR TO FINAL APPROVAL} ; {Activity date: 04/18/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LANDSCAPE IS NOT READY AT THIS TIME, CONTRACTOR WILL RESCHEDULE AT A LATER DATE.}
05/14/2014 ENGR Engineering Final Passed {Activity date: 05/14/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/02/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) STABILIZE AREAS THAT HAVE BEEN DISTURBED DURING CONSTRUCTION
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
3) PROVIDE AN AS-BUILT PLAN} ; {Activity date: 04/18/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE NOT READY AT THIS TIME FOR THE FINAL INSPECTION, NO CONCERNS AT THIS TIME.}
06/26/2019 ENGR Grading Final Passed {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_CV1.TIF GRADING PLANS VIEW
002_NT1.TIF GRADING PLANS VIEW
003_NT2.TIF GRADING PLANS VIEW
004_SP1.TIF GRADING PLANS VIEW
005_HC1.TIF GRADING PLANS VIEW
006_GD1.TIF GRADING PLANS VIEW
007_GD2.TIF GRADING PLANS VIEW
008_UT1.TIF GRADING PLANS VIEW
009_DT1.TIF GRADING PLANS VIEW
010_SW1.TIF GRADING PLANS VIEW
011_SW2.TIF GRADING PLANS VIEW
012_SW3.TIF GRADING PLANS VIEW
013_SW4.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW