Permit: DP13-0153
Permit Details
Status:
Complete
Type:
Development Package
Address:
9100 S HOUGHTON RD
Address NEW:
9100 S HOUGHTON RD
Apply Date:
08/12/2013
Applicant:
Description:
GRADING/SWPPP FOR NEW RETAIL BLDG
Permit Reviews
Permit Number - DP13-0153
Permit Status: Complete
Permit Description: GRADING/SWPPP FOR NEW RETAIL BLDG
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/12/2013 | DEV PKG - OK TO SUBMIT | 08/12/2013 | COMPLETED |
| 08/12/2013 | GRADING | 10/02/2013 | COMPLETED |
| 10/02/2013 | RESUB - SITE and/or GRADING | 10/31/2013 | COMPLETED |
| 10/31/2013 | RESUB - SITE and/or GRADING | 11/20/2013 | ACTIVE |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0153
Permit Description: GRADING/SWPPP FOR NEW RETAIL BLDG
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2013 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/12/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT AND DISCUSSED SWPPP, GRADING/SITE WORK, AND LANDSCAPING. 2) ENSURE SEDIMENT CONTROLS ARE INSTALLED ALONG THE PERIMETER OF THE CONSTRUCTION SITE. 3) ENSURE STORM WATER SELF INSPECTIONS/MAINT ARE PERFORMED AND DOCUMENTED PER YOUR PLAN. 4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED. 5) SWEEP UP ANY TRACKED SOIL BACK ON TO YOUR SITE. 6) PLACE SEDIMENT CONTROLS AROUND TEMP STOCKPILE. CALL FOR RE-INSPECTION PERODICALLY} |
|
| 12/30/2013 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 12/30/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER THE APPROVED PLANS AND PER THE ENG INSPECTION DONE. 2) ENSURE CONTROLS ARE MAINTAINED THROUGHOUT CONSTR.} |
|
| 05/02/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 05/02/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MOST OF THE SITE HAS BEEN STABILIZED AND A NOTICE OF TERMINATION HAS BEEN SENT TO ADEQ; HOWEVER THERE IS A SMALL AREA ALONG THE EAST AND SOUTH PERIMETER HAS NOT BEEN. 2) PER THE CITY OF TUCSON DEV STD FOR GRADING, ANY AREAS DISTURBED BY CONSTRUCTION EITHER DIRECTLY OR INDIRECTLY MUST BE STABILIZED USING ROCK OR HYDROSEED. 3) COMPLETE LANDSCAPING AND STABILIZATION PRIOR TO FINAL APPROVAL} ; {Activity date: 04/18/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 04/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERS AT THIS TIME 2) ENSURE TRACKED SOIL IS SWEPT UP ROUTINELY 3) SITE/GRADING SUBSTANTIALLY COMPLETED 4) LANDSCAPING PARTIALLY DONE} ; {Activity date: 04/22/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG, SITE/GRADING HAS BEEN COMPLETED 2) LANDSCAPING NOT INSTALLED 3) ACCESS AND TRASH ENCLOSURE OK 4) NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/06/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) RE-ESTABLISH SEDIEMNT CONTROLS ALONG THE PERIMETER TO THE SITE. 2) SWEEP UP TRACKED SOIL FROM OFF SITE 3) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM. 4) CALL FOR RE-INSPECTION FOR RE-BAR LAYOUT FOR HEAVY DUTY CONCRETE.} ; {Activity date: 03/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR STARTING TO DO SITE/GRADING WORK. WILL RE-INSPECT WITH SUPERINTENDENT TO REVIEW PLANS AND SITE SPECIFICS. 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/30/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} |
|
| 05/02/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 05/02/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MOST OF THE SITE HAS BEEN STABILIZED AND A NOTICE OF TERMINATION HAS BEEN SENT TO ADEQ; HOWEVER THERE IS A SMALL AREA ALONG THE EAST AND SOUTH PERIMETER HAS NOT BEEN. 2) PER THE CITY OF TUCSON DEV STD FOR GRADING, ANY AREAS DISTURBED BY CONSTRUCTION EITHER DIRECTLY OR INDIRECTLY MUST BE STABILIZED USING ROCK OR HYDROSEED. 3) COMPLETE LANDSCAPING AND STABILIZATION PRIOR TO FINAL APPROVAL} |
|
| 05/14/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/14/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/02/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MOST OF THE SITE HAS BEEN STABILIZED AND A NOTICE OF TERMINATION HAS BEEN SENT TO ADEQ; HOWEVER THERE IS A SMALL AREA ALONG THE EAST AND SOUTH PERIMETER HAS NOT BEEN. 2) PER THE CITY OF TUCSON DEV STD FOR GRADING, ANY AREAS DISTURBED BY CONSTRUCTION EITHER DIRECTLY OR INDIRECTLY MUST BE STABILIZED USING ROCK OR HYDROSEED. 3) COMPLETE LANDSCAPING AND STABILIZATION PRIOR TO FINAL APPROVAL} ; {Activity date: 04/18/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LANDSCAPE IS NOT READY AT THIS TIME, CONTRACTOR WILL RESCHEDULE AT A LATER DATE.} |
|
| 05/14/2014 | ENGR Engineering Final | Passed | {Activity date: 05/14/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/02/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) STABILIZE AREAS THAT HAVE BEEN DISTURBED DURING CONSTRUCTION 2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 3) PROVIDE AN AS-BUILT PLAN} ; {Activity date: 04/18/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE NOT READY AT THIS TIME FOR THE FINAL INSPECTION, NO CONCERNS AT THIS TIME.} |
|
| 06/26/2019 | ENGR Grading Final | Passed | {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |