Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/12/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT AND DISCUSSED SWPPP, GRADING/SITE WORK, AND LANDSCAPING.
2) ENSURE SEDIMENT CONTROLS ARE INSTALLED ALONG THE PERIMETER OF THE CONSTRUCTION SITE.
3) ENSURE STORM WATER SELF INSPECTIONS/MAINT ARE PERFORMED AND DOCUMENTED PER YOUR PLAN.
4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED.
5) SWEEP UP ANY TRACKED SOIL BACK ON TO YOUR SITE.
6) PLACE SEDIMENT CONTROLS AROUND TEMP STOCKPILE.
CALL FOR RE-INSPECTION PERODICALLY |