Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP13-0150
Permit Details
Apply Date:
08/09/2013
Applicant:
Lisa Bowers
Description:
SITE/GRADING
Permit Reviews
Permit Number - DP13-0150
Permit Status: Complete
Permit Description: SITE/GRADING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/29/2014 | DEV PKG - REVISION | 01/30/2014 | COMPLETED |
08/09/2013 | DEV PKG - OK TO SUBMIT | 08/09/2013 | COMPLETED |
08/09/2013 | SITE and/or GRADING | 10/11/2013 | COMPLETED |
10/11/2013 | RESUB - SITE/GRADING ALL | 11/20/2013 | COMPLETED |
11/20/2013 | RESUB - SITE/GRADING ALL | 11/25/2013 | COMPLETED |
11/25/2013 | RESUB - SITE and/or GRADING | 11/27/2013 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0150
Permit Description: SITE/GRADING
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/10/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/10/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT ON STORM WATER, SITE/GRADING, LANDSCAPE, AND NPPO. DISTURBED AREA IS LESS THAN 1 ACRE THEREFORE A STORM WATER PERMIT AND SWPPP IS NOT REQUIRED. HOWEVER CONTRACTOR MUST KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION} ; {Activity date: 01/23/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 01/16/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - DEMO HAS BEEN COMPLETED, NO CONTACT ON SITE, NO CONSTRUCTION AT THIS TIME} ; {Activity date: 01/10/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE GRADED ROUGHLY AT THIS TIME, NO ONE ON SITE. NO STORMWATER CONTROLS NOTED DURING THIS INSPECTION.} |
|
07/21/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/21/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/30/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LANDSCAPE IS PARTIALLY COMPLETED} | |
07/21/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/21/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/30/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF SITE IS COMPLETED AND WILL BE PAVED NEXT WEEK.} ; {Activity date: 06/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/01/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT SITE WORK AT THIS TIME 2) NO SIGNIFICANT STORM WATER COCERNS AT THIS TIME 3) ENSURE TRACKED SOIL IS SWEPT UP ROUTINELY} ; {Activity date: 04/25/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BUILDING, MINIMAL SITE WORK AT THIS TIME 2) NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 04/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER OR SITE/GRADING CONCERNS AT THIS TIME} ; {Activity date: 03/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SWEEP UP SOIL FROM SAW CUTTING IN RIGHT OF WAY, PROTECT EXISTING CURB LINE CATCH BASIN DURING CUTTING} ; {Activity date: 03/17/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME CONTRACTOR WORKING ON BLDG PAD AND UTILITIES} ; {Activity date: 03/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE, THEREFORE NO STORM WATER PERMIT IS REQUIRED. 2) CONTRACTOR INSTALLING UTILITIES AND WORKING ON BLDG PAD AT THIS TIME. 3) NO SIGNIFICANT SITE WORK AT THIS TIME 4) NO STORM WATER CONCERNS} |
|
07/21/2014 | ENGR Grading Final | Passed | {Activity date: 07/21/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/30/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE PAVING AND ALL SITE/LANDSCAPE PRIOR TO FINAL} ; {Activity date: 06/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LOOKED AT FORMS FOR VALLEY GUTTER AND SIDEWALKS} ; {Activity date: 05/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 05/08/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SITE WORK AT THIS TIME} ; {Activity date: 05/01/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT SITE WORK AT THIS TIME 2) NO SIGNIFICANT STORM WATER COCERNS AT THIS TIME 3) ENSURE TRACKED SOIL IS SWEPT UP ROUTINELY} ; {Activity date: 04/25/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BUILDING, MINIMAL SITE WORK AT THIS TIME 2) NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 04/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER OR SITE/GRADING CONCERNS AT THIS TIME} ; {Activity date: 03/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT SITE/GRADING CONCERNS AT THIS TIME} ; {Activity date: 03/17/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR WORKING ON BLDG PAD, NO SIGNIFICANT SITE/GRADING} ; {Activity date: 03/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME CONTRACTOR WORKING ON BLDG PAD AND UTILITIES} ; {Activity date: 03/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE, THEREFORE NO STORM WATER PERMIT IS REQUIRED. 2) CONTRACTOR INSTALLING UTILITIES AND WORKING ON BLDG PAD AT THIS TIME. 3) NO SIGNIFICANT SITE WORK AT THIS TIME 4) NO STORM WATER CONCERNS} ; {Activity date: 02/20/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY ON SITE CONTRACTOR ROUGH GRADED SITE, SOME SEDIMENT CONTROLS IN PLACE} |
|
07/21/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 07/21/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/12/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF SITE IS STABILIZED} | |
08/01/2014 | ENGR Engineering Final | Passed | {Activity date: 08/01/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/21/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL: 1) COMPLETE ALL SITE WORK PER PLAN 2) ENSURE HC PARKING AND ACCESS MEET THE ACCESSIBILITY CODE IDENTIFIED ON YOUR APPROVED PLANS 3) PROVIDE A CERT STSTEMENT FROM THE ENGINEER OF RECORD PER YOUR APPROVED PLANS} |
|
10/28/2014 | RSBU - Building Final | Passed | {Activity date: 10/28/2014; Status: Approved; Inspector: kmedina; Comment: Entered by KMEDINA1 - } |