Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP13-0150
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/21/2014 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by DROBERT5 - |
06/30/2014 | SITE - Stormwater Follow-up | MRUSSO | Partial Approval | Entered by DROBERT5 - MAJORITY OF SITE IS COMPLETED AND WILL BE PAVED NEXT WEEK. |
06/12/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
06/03/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
05/14/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
05/01/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
04/28/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT SITE WORK AT THIS TIME 2) NO SIGNIFICANT STORM WATER COCERNS AT THIS TIME 3) ENSURE TRACKED SOIL IS SWEPT UP ROUTINELY |
04/25/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BUILDING, MINIMAL SITE WORK AT THIS TIME 2) NO SIGNIFICANT STORM WATER CONCERNS |
04/18/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER OR SITE/GRADING CONCERNS AT THIS TIME |
03/18/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - SWEEP UP SOIL FROM SAW CUTTING IN RIGHT OF WAY, PROTECT EXISTING CURB LINE CATCH BASIN DURING CUTTING |
03/17/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
03/12/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME CONTRACTOR WORKING ON BLDG PAD AND UTILITIES |
03/11/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE, THEREFORE NO STORM WATER PERMIT IS REQUIRED. 2) CONTRACTOR INSTALLING UTILITIES AND WORKING ON BLDG PAD AT THIS TIME. 3) NO SIGNIFICANT SITE WORK AT THIS TIME 4) NO STORM WATER CONCERNS |