Permit Details

Status:
Complete
Type:
Development Package
Address:
7201 E 22ND ST
Apply Date:
08/08/2013
Applicant:
Anthony Capps
Description:
SITE/GRADING

Permit Reviews

Permit Number - DP13-0148
Permit Status: Complete
Permit Description: SITE/GRADING
Start Date Submittal Complete Date Status  
01/08/2014 REVISION - SITE 03/05/2014 COMPLETED Review Details
08/08/2013 DEV PKG - OK TO SUBMIT 08/08/2013 COMPLETED Review Details
08/08/2013 SITE and/or GRADING 09/12/2013 COMPLETED Review Details
11/04/2013 RESUB - SITE/GRADING ALL 12/23/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0148
Permit Description: SITE/GRADING
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/06/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/06/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE A STORM WATER PERMIT IS NOT REQUIRED. HOWEVER DISTURBED SOIL MUST BE KEPT ON SITE DURING CONSTRUCTION. TEMP SEDIMENT CONTROLS ARE RECOMENDED.
2) ENSURE PEDESTRIAN ACCESS SLOPES MEET ADA.
3) CALL FOR INSPECTION FOR RE-BAR LAYOUT IN NEW TRASH ENCLOSURE.
4) CALL FOR INSPECTION IF SITE WORK CHANGES FROM THE ORIGINAL APPROVED PLAN.}
01/29/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 01/29/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED FOOTINGS AND RE-BAR LAY OUT FOR TRASH ENCLOSURE.
2) SOME SEDIMENT CONTROLS, (SILT SOCK) INSTALLED ALONG THE NORTH DOWNWARD SLOPE OF THE SITE.
3) NO SIGNIFICANT STORM WATER CONCERS AT THIS TIME}
08/04/2014 SITE - Stormwater Follow-up Passed {Activity date: 08/04/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO CHANGES AND OR CONCERNS AT THIS TIME
2) SITE IS STILL UNDER A STORM WATER PERMIT AND MUST COMPLY UNTIL THE SITE IS 100% STABILIZED} ; {Activity date: 04/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERS AT THIS TIME
2) ENSURE TRACKED SOIL IS SWEPT UP ROUTINELY
3) NO CHANGES AND/OR CONCERNS WITH SITE/GRADING. ENSURE CONSTRUCTION IS PER APPROVED PLAN} ; {Activity date: 03/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED FOOTINGS AND RE-BAR LAY OUT FOR TRASH ENCLOSURE.
2) SOME SEDIMENT CONTROLS, (SILT SOCK) INSTALLED ALONG THE NORTH DOWNWARD SLOPE OF THE SITE.
3) NO SIGNIFICANT STORM WATER CONCERS AT THIS TIME} ; {Activity date: 01/10/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PROVIDE COPIES OF THE PLANS AND INSTALL ALL REQUIRED STORMWATER CONTROLS AS SHOWN ON THE APPROVED PLANS. THIS SITE INSPECTION WILL BE SCHEDULED FOR NEXT WEEK.} ; {Activity date: 01/10/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PROVIDE A COPY OF THE APPROVED PLANS AND PROVIDE ALL STORMWATER CONTROLS AS NOTED ON THE APPROVED PLANS. CURRENTLY THERE ARE NO STORMWATER CONTROLS ON THIS SITE AT THIS TIME.}
08/04/2014 ENGR Grading Final Passed {Activity date: 08/04/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONCERS AND/OR CHANGES AT THIS TIME} ; {Activity date: 05/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO CHANGES AND OR CONCERNS AT THIS TIME
2) SITE IS STILL UNDER A STORM WATER PERMIT AND MUST COMPLY UNTIL THE SITE IS 100% STABILIZED} ; {Activity date: 04/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERS AT THIS TIME
2) ENSURE TRACKED SOIL IS SWEPT UP ROUTINELY
3) NO CHANGES AND/OR CONCERNS WITH SITE/GRADING. ENSURE CONSTRUCTION IS PER APPROVED PLAN} ; {Activity date: 01/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED FOOTINGS AND RE-BAR LAY OUT FOR TRASH ENCLOSURE.
2) SOME SEDIMENT CONTROLS, (SILT SOCK) INSTALLED ALONG THE NORTH DOWNWARD SLOPE OF THE SITE.
3) NO SIGNIFICANT STORM WATER CONCERS AT THIS TIME}
10/01/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/01/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE SITE/GRADING CALL FOR RE-INSPECTION
2) COMPLETE LANDSCAPING
3) SEPARATE REMAINING CONSTRUCTION FROM COMPLETED BLDG}
10/01/2014 SITE - Stormwater Final Inspection Passed {Activity date: 10/01/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE AN NOTICE OF TERMINATION IS FINALED WITH ADEQ} ; {Activity date: 09/16/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 08/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 08/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - STABILIZE SITE, FILE NOTICE OF TERMINATION WITH ADEQ}
10/07/2014 ENGR Engineering Final Passed {Activity date: 10/07/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/16/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES} ; {Activity date: 08/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PART OF THE SITE HAS BEEN COMPLETED AND SEPARATED FROM REMAINING CONSTRUCTION.
2) FIANL APPROVAL WILL NOT BE GIVEN UNTIL THE SITE/GRADINMG IS COMPLETED PER THE APPROVED PLANS} ; {Activity date: 08/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES TO SITE/GRADING. ENSURE CONTRACTOR SEPERATES REMAINING CONSTRUCTION FROM OCCUPIED BLDG} ; {Activity date: 08/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE SITE/GRADING CALL FOR RE-INSPECTION
2) COMPLETE LANDSCAPING
3) SEPARATE REMAINING CONSTRUCTION FROM COMPLETED}

Documents

File Name Document Type  
None LETTER OF COMPLETION VIEW
001_G1.TIF DEVELOPMENT PACKAGE VIEW
002_1 OF 6.TIF DEVELOPMENT PACKAGE VIEW
003_2 OF 6.TIF DEVELOPMENT PACKAGE VIEW
004_3 OF 6.TIF DEVELOPMENT PACKAGE VIEW
005_4 OF 6.TIF DEVELOPMENT PACKAGE VIEW
006_5 OF 6.TIF DEVELOPMENT PACKAGE VIEW
007_6 OF 6.TIF DEVELOPMENT PACKAGE VIEW
008_D.1.TIF DEVELOPMENT PACKAGE VIEW
009_A.0.TIF DEVELOPMENT PACKAGE VIEW
010_A.1.TIF DEVELOPMENT PACKAGE VIEW
011_A.2.TIF DEVELOPMENT PACKAGE VIEW
012_A.3.TIF DEVELOPMENT PACKAGE VIEW
013_A.3.1.TIF DEVELOPMENT PACKAGE VIEW
014_A.4.TIF DEVELOPMENT PACKAGE VIEW
015_A.5.TIF DEVELOPMENT PACKAGE VIEW
016_A.6.TIF DEVELOPMENT PACKAGE VIEW
017_A.7.TIF DEVELOPMENT PACKAGE VIEW
018_A.8.TIF DEVELOPMENT PACKAGE VIEW
019_A.9.TIF DEVELOPMENT PACKAGE VIEW
020_S1.0.TIF DEVELOPMENT PACKAGE VIEW
021_S1.1.TIF DEVELOPMENT PACKAGE VIEW
022_S1.2.TIF DEVELOPMENT PACKAGE VIEW
023_S1.3.TIF DEVELOPMENT PACKAGE VIEW
024_S1.4.TIF DEVELOPMENT PACKAGE VIEW
025_S2.0.TIF DEVELOPMENT PACKAGE VIEW
026_S3.0.TIF DEVELOPMENT PACKAGE VIEW
027_S4.0.TIF DEVELOPMENT PACKAGE VIEW
028_S5.0.TIF DEVELOPMENT PACKAGE VIEW
029_S5.1.TIF DEVELOPMENT PACKAGE VIEW
030_P.0.TIF DEVELOPMENT PACKAGE VIEW
031_P.1.TIF DEVELOPMENT PACKAGE VIEW
032_P-2.TIF DEVELOPMENT PACKAGE VIEW
033_M.1.TIF DEVELOPMENT PACKAGE VIEW
034_M.2.TIF DEVELOPMENT PACKAGE VIEW
035_ES-1.TIF DEVELOPMENT PACKAGE VIEW
036_E.0.TIF DEVELOPMENT PACKAGE VIEW
037_E.1.TIF DEVELOPMENT PACKAGE VIEW
038_E.2.TIF DEVELOPMENT PACKAGE VIEW
039_E.3.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW