Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
1545 E COPPER ST
Address NEW:
1545 E COPPER ST
Apply Date:
07/18/2013
Applicant:
Description:
SAL POINT NEW STUDENT CENTER

Permit Reviews

Permit Number - DP13-0131
Permit Status: Complete
Permit Description: SAL POINT NEW STUDENT CENTER
Start Date Submittal Complete Date Status  
07/18/2013 DEV PKG - OK TO SUBMIT 07/18/2013 COMPLETED Review Details
07/18/2013 DEV PKG 08/27/2013 COMPLETED Review Details
08/27/2013 DEV PKG - RESUBMITTAL 10/04/2013 COMPLETED Review Details
10/04/2013 DEV PKG - RESUBMITTAL 10/31/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0131
Permit Description: SAL POINT NEW STUDENT CENTER
Total Completed Inspections - 7
Date Description Inspector Results Comments
11/21/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 11/21/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) DISTURBANCE IS >1 AC, SWPPP IS REQUIRED AND IS ON SITE.
2) INSTALL SEDIMENT CONTROLS PER YOUR APPROVED PLAN.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER PLAN.
4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE.
5) SWEEP UP TRACKED SOIL OFF OF ADJACENT PUBLIC ROADWAYS AS NEEDED.
6) CALL FOR INSPECTION PRIOR TO COVERING UNDERGROUND STORM DRAINAGE WORK
7) CALL FOR INSPECTION FOR ANY CHANGES/CONCERNS WITH THE SITE/GRADING.
8) A CERT STATEMENT FROM YOUR ENGINEER OF RECORD AND AN AS-BUILT DRAWING IS REQUIRED PRIOR TO FINAL APPROVAL}
12/10/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 12/10/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE MINIR SEDIMENT CONTROLS SHOWN ON THE APPROVED PLAN HAS BEEN INSTALLED}
09/11/2014 SITE - Stormwater Follow-up Passed {Activity date: 09/11/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 06/17/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 05/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE CONTRACTOR IS WORKING ON CONSTRUCTION OF THE BLDG, MINIMAL SITE WORK AT THIS TIME.
2) SITE IS STILL UNDER A STORM WATER PERMIT, AND MUST COMPLY UNTIL THE SITE IS 100% STABILIZED
3) ENSURE EXISTING CATCH BASINS ARE COVERED AND SOIL IS KEPT OUT OF STORM SYSTEM} ; {Activity date: 04/22/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG CONSTRUCTION
2) UNDERGROUND STORM DRAINAGE SYSTEM INSTALLED, CONTRACTOR COVERED OR PROTECTED ALL CATCH BASINS.
3) ENSURE PERIMETER SEDIMENT CONTROLS REMAIN IN PLACE UNTIL THE SITE IS 100% STABILIZED} ; {Activity date: 02/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/19/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE TO INSTALL SEDIEMNT CONTROLS AROUND NEW CATCH BASINS TO PROTECT THE STORM SYSTEM.} ; {Activity date: 01/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED BUBBLER BOX AT THE END OF THE STORM WATER DRAINAGE RUN. ENSURE PIPE IS INSTALLED PER APPROVED PLAN. PICTURES TAKEN
2) WILL RE-INSPECT AND DOCUMENT PIPE TO BOX CONNECTION MONDAY 1/27/14
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
} ; {Activity date: 01/17/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/13/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR INSTALLING 24" CMP ALONG SOUTH SIDE OF SITE. PIPE HAS LATERAL CONNECTIONS FROM TWO CATCH BASINS AND MULTIPLE ROOF DRAIN TIE-INS.
2) SOME DIRECTIONAL CHANGES HAVE BEEN MADE TO THE LATERALS AND THERE IS NO DETAIL SHOWING THE CONNECTION OF THE MANY ROOF DRAINS TO THE MAIN BRANCH LINE.
3) ALL CHANGES FORM THE ORIGINAL APPROVED SITE/GRADING PLAN NEED TO BE SHOWN ON AN AS-BUILT DRAWING.
4) PROVIDE APPROVAL FROM THE ENGINEER OF RECORD AND THE ENG REVIEWER FOR ROOF DRAIN TO STORM PIPE CONNECTIONS (RUBBER STOPPER USED AROUND PIPE, HOLE CUT INTO MAIN LINE AND ROOF DRAIN GROUTED IN PLACE).
5) NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/31/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - UNDERGROUND STORM WATER CANCELLED DUE TO RAIN
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/13/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR INSTALLED APRROX 180' OF 12 AND 18" PVC STORM DRAIN PIPIE AND TWO PRE-CAST CATCH BASINS.
2) THE PIPE TRENCH WAS COMPACTED AND SHADED TO THE SPRING LINE
3) PIPE WAS GRADED TO DRAIN PER THE APPROVED PLANS
4) CATCH BASINS WERE PRE-CAST AND SET IN PLACE, PIPE WAS GROUTED IN - PICTURES WERE TAKEN
5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
09/11/2014 ENGR Grading Final Passed {Activity date: 09/11/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR INSTALLING 24" CMP ALONG SOUTH SIDE OF SITE. PIPE HAS LATERAL CONNECTIONS FROM TWO CATCH BASINS AND MULTIPLE ROOF DRAIN TIE-INS.
2) SOME DIRECTIONAL CHANGES HAVE BEEN MADE TO THE LATERALS AND THERE IS NO DETAIL SHOWING THE CONNECTION OF THE MANY ROOF DRAINS TO THE MAIN BRANCH LINE.
3) ALL CHANGES FORM THE ORIGINAL APPROVED SITE/GRADING PLAN NEED TO BE SHOWN ON AN AS-BUILT DRAWING.
4) PROVIDE APPROVAL FROM THE ENGINEER OF RECORD AND THE ENG REVIEWER FOR ROOF DRAIN TO STORM PIPE CONNECTIONS (RUBBER STOPPER USED AROUND PIPE, HOLE CUT INTO MAIN LINE AND ROOF DRAIN GROUTED IN PLACE).
5) NO STORM WATER CONCERNS AT THIS TIME}
11/05/2014 SITE - Stormwater Final Inspection Passed {Activity date: 11/05/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SUBMIT A NOTICE OF TERMINATION TO ADEQ} ; {Activity date: 10/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SUBMIT AN NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 09/11/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
12/24/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 11/17/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AT THIS TIME} ; {Activity date: 09/11/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
12/24/2014 ENGR Engineering Final Passed {Activity date: 12/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CERTIFICATION STATEMENT ACCEPTED, AS-BUILT WILL BE SUBMITTED TO THE CITY OF TUCSON} ; {Activity date: 12/23/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - INSPECTION WAS POSTPONED} ; {Activity date: 11/17/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AT THIS TIME} ; {Activity date: 11/05/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL HAND RAILING ALONG SIDEWALK AT NORTH SIDE ENTRANCE, >30" DROP, 2:1 SLOPE.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD.
3) PROVIDE AN AS-BUILT FOR FINAL GRADING INSPECTION SHOWING CHANGES MADE
4) CLEAN OUT NEW CATCH BASINS
5) WILL INSPECT PEDESTRIAN ACCESS SLOPES} ; {Activity date: 10/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL:
1) PROVIDE DOCUMENTATION FROM THE ENG OF RECORD STATING THAT HE IS AWARE OF THE CONNECTION OF ROOF DRAIN LINES TO THE MAIN STORM DRAIN LINE AND APPROVES HOW IT WAS CONSTRUCTED.
2) PROVIDE A CERT STATMENT FROM THE EOR
3) SUBMIT A STAMPED AS-BUILT DRAWING TO THE CITY OF TUCSON
4) COMPLETE ALL SITE/GRADING PER THE APPROVED PLANS} ; {Activity date: 10/10/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING FINAL RADING INSPECTION} ; {Activity date: 10/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO INSPECTION CALLED IN, NO CHANGES.} ; {Activity date: 01/17/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL:
1) PROVIDE DOCUMENTATION FROM THE ENG OF RECORD STATING THAT HE IS AWARE OF THE CONNECTION OF ROOF DRAIN LINES TO THE MAIN STORM DRAIN LINE AND APPROVES HOW IT WAS CONSTRUCTED.
2) PROVIDE A CERT STATMENT FROM THE EOR
3) SUBMIT A STAMPED AS-BUILT DRAWING TO THE CITY OF TUCSON
4) COMPLETE ALL SITE/GRADING PER THE APPROVED PLANS}

Documents

File Name Document Type  
001_C1.0.TIF GRADING PLANS VIEW
002_C1.1.TIF GRADING PLANS VIEW
003_C1.2.TIF GRADING PLANS VIEW
004_C2.0.TIF GRADING PLANS VIEW
005_C3.0.TIF GRADING PLANS VIEW
006_C3.1.TIF GRADING PLANS VIEW
007_C4.0.TIF GRADING PLANS VIEW
008_C5.0.TIF GRADING PLANS VIEW
009_C5.1.TIF GRADING PLANS VIEW
010_C5.2.TIF GRADING PLANS VIEW
011_C6.0.TIF GRADING PLANS VIEW
012_C7.0.TIF GRADING PLANS VIEW
013_C8.0.TIF GRADING PLANS VIEW
014_L1.0.TIF GRADING PLANS VIEW
015_L2.0.TIF GRADING PLANS VIEW
016_L3.0.TIF GRADING PLANS VIEW
017_L4.0.TIF GRADING PLANS VIEW
DP13-0131 SW GAS APPROVAL.PDF DOCUMENTS VIEW
DP13-0131 TUCSON WATER APPROVAL.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW