Permit: DP13-0131

Parcel: 11310001A


Addresses:

1545 E COPPER ST


Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP13-0131

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
11/21/2013 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 - 1) DISTURBANCE IS >1 AC, SWPPP IS REQUIRED AND IS ON SITE. 2) INSTALL SEDIMENT CONTROLS PER YOUR APPROVED PLAN. 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER PLAN. 4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE. 5) SWEEP UP TRACKED SOIL OFF OF ADJACENT PUBLIC ROADWAYS AS NEEDED. 6) CALL FOR INSPECTION PRIOR TO COVERING UNDERGROUND STORM DRAINAGE WORK 7) CALL FOR INSPECTION FOR ANY CHANGES/CONCERNS WITH THE SITE/GRADING. 8) A CERT STATEMENT FROM YOUR ENGINEER OF RECORD AND AN AS-BUILT DRAWING IS REQUIRED PRIOR TO FINAL APPROVAL