Permit: DP13-0104
Permit Details
Status:
Complete
Type:
Development Package
Address:
5075 S MIDVALE PARK RD
Address NEW:
5075 S MIDVALE PARK RD
Apply Date:
06/06/2013
Applicant:
Jeffrey Stanley
Description:
DP- SITE/GRADING/SWPPPOriginally approved 1/15/14As builts approved 9/11/2014
Permit Reviews
Permit Number - DP13-0104
Permit Status: Complete
Permit Description: DP- SITE/GRADING/SWPPPOriginally approved 1/15/14As builts approved 9/11/2014
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2013 | DEV PKG - OK TO SUBMIT | 06/07/2013 | COMPLETED |
| 06/07/2013 | DEV PKG | 07/15/2013 | COMPLETED |
| 08/22/2013 | DEV PKG - RESUBMITTAL | 09/25/2013 | COMPLETED |
| 09/11/2014 | DEV PKG - REVISION | 09/11/2014 | COMPLETED |
| 10/23/2013 | DEV PKG - RESUBMITTAL | 02/14/2014 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP13-0104
Permite Description: DP- SITE/GRADING/SWPPPOriginally approved 1/15/14As builts approved 9/11/2014
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2014 | ENGR Grading Final | N/A | Not Ready | {Activity date: 10/06/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/12/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/08/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - ACCESSABLE PARKING NOT INSTALLED PER AP PLANS. WALKED SITE WITH GC.} |
| 10/28/2014 | ENGR Engineering Final | N/A | Complete (Recurring) | {Activity date: 10/28/2014; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - REMOVE CONCRETE AND ASPHALT.} ; {Activity date: 09/12/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE AP COT AS- BUILTS AND CERT LETTER FOR ALL GRADING AND DRAINAGE. PROVIDE STABILIZATION OF LOT TO SOUTH OF SITE .BASIN ON NORTH EAST SIDE OF SITE HOLDING WATER OVER 12 HR.} |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0104
Permit Description: DP- SITE/GRADING/SWPPPOriginally approved 1/15/14As builts approved 9/11/2014
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/12/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/08/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NEEDS TO COMLET INSTALL OF RIP-RAP ON EAST SIDE OF SITE . AND ALL LANDSCAPING AT LOT ON SOUTH OF SITE.} ; {Activity date: 09/05/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON LANDSCAPING.} | |
| 09/12/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/12/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/15/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} | |
| 09/12/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/12/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/08/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL CURB CUTS PER AP PLANS AND ALL WORK ON AP PLANS.} | |
| 09/12/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/12/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 09/12/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/12/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/12/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/31/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET SWPPP CONTROLS. PROVIDE NOI. COMPLET PRE-CON PACKET.} |