Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
700 W WETMORE RD 03
Apply Date:
04/10/2013
Applicant:
Marty Magelli
Description:
GRADING ONLY FOR PHASE 3

Permit Reviews

Permit Number - DP13-0064
Permit Status: Complete
Permit Description: GRADING ONLY FOR PHASE 3
Start Date Submittal Complete Date Status  
04/10/2013 DEV PKG - OK TO SUBMIT (GRADING ONLY) 04/10/2013 COMPLETED Review Details
04/10/2013 GRADING 05/10/2013 COMPLETED Review Details
08/04/2016 REVISION - GRADING 09/09/2016 COMPLETED Review Details
09/09/2016 REVISION - GRADING 10/25/2016 COMPLETED Review Details
09/25/2013 RESUB - SITE and/or GRADING 09/09/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0064
Permit Description: GRADING ONLY FOR PHASE 3
Total Completed Inspections - 7
Date Description Inspector Results Comments
03/27/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 03/27/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIEMNT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER OF THE SITE PER YOUR SWPPP AND DIRECTION FROM PRE-CON INSPECTION
2) ENSURE STORM WATER SELF INSPECTIONS AND MAINTENANCE IS PERFORMED PER YOUR PERMIT AND DOCUMENT THEM
3) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAY AS NEEDED.
4) CALL FOR INSPECTION WHEN CONCRETE/MATERIALS WASH OUT IS INSTALLED.} ; {Activity date: 03/25/2014; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS HAVE NOT BEEN INSTALLED AND CONSTRUCTION HAS STARTED.
CONTRACTOR IS IN VIOLATION OF THIER AZPDES PERMIT}
02/17/2017 SITE - Stormwater Follow-up Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 12/07/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/08/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/11/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/16/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/02/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LIMTED SITE WORK AT THIS TIME FOR PHASE II
NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE COMPLIANCE WITH YOUR SWPPP} ; {Activity date: 06/09/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SITE WORK AS OF YET FOR PHASE II OF THE PROJECT, CONTRACTORS WORKING ON THE SALES BLDG
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/11/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/04/2015; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SWEEP UP TRACKING OFF OF WETMORE
2) ENSURE STORM WATER SELF INSPECTIONS ARE COMPLETED} ; {Activity date: 04/01/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/05/2014; Status: Cancelled; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RAINING} ; {Activity date: 10/22/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 09/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 09/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 09/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 08/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) STABILIZED ENTRANCE WAS MOVED
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 07/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 06/30/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MINIMAL SITE WORK AT THIS TIME
2) REMOVE EQUIPMENT AND MATERIAL OFF OF SEDIMENT CONTROLS
3) ENSURE SELF INSPECTIONS ARE ARE PERFORMED AND DOCUMENTED} ; {Activity date: 06/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) WALKED SITE, CONTRACTOR WORKING ON MAIN BLDG AND CAR WASH BLDG ALONG THE WEST SIDE
2) NO SIGNIFICANT SITE WORK AT THIS TIME
3) REMOVE CONSTRUCTION DEBRIS AND MATERIAL OFF OF SEDIMENT CONTROLS
4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 05/30/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SWEEP UP TRACKED SOIL OFF OF ADJACENT ROADWAY
2) INSTALL SEDIMENT CONTROLS (GRAVEL BAG, WADDLE, SILT SOCK...) ON THE UPSTREAM SIDE OF THE EXISTING CATCH BASINLOCATED IN THE CURB AT THE MAIN ENTRANCE/EXIT
3) ENSURE SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP
4) CALL FOR INSPECTION FOR ANY SITE/GRADING CHANGES AND/OR CONCERNS} ; {Activity date: 05/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REMOVE CONSTRUCTION DEBRIS AND MATERIAL OFF OF PERIMETER SEDIMENT CONTROLS ALONG THE NORTH/NE CORNER OF SITE.
2) REMOVE TEMPORARY DIRT RAMP (NE CORNER) AS SOON AS PRACTICABLE
3) ENSURE BATCH PLANTS AND WASH OUT WASTE IS DISPOSED OF ROUTINELY
4) NO SIGNIFICANT SITE WORK AT THIS TIME} ; {Activity date: 04/25/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
3) CONTRACTOR WORKING ON THE BUIDING PAD, MINIMAL SITE WORK AT THIS TIME} ; {Activity date: 04/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) CONTRACTOR WORKING ON BLDG PAD OVER-EXCAVATING AND ROUGH GRADING} ; {Activity date: 03/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIEMNT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER OF THE SITE PER YOUR SWPPP AND DIRECTION FROM PRE-CON INSPECTION
2) ENSURE STORM WATER SELF INSPECTIONS AND MAINTENANCE IS PERFORMED PER YOUR PERMIT AND DOCUMENT THEM
3) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAY AS NEEDED.
4) CALL FOR INSPECTION WHEN CONCRETE/MATERIALS WASH OUT IS INSTALLED.}
02/17/2017 ENGR Grading Final Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR WORKING ON PAVING SITE. CHANGE FROM ASPHALT TO CONCRETE, NEED APPROVED PLANS TO REFLECT CHANGES MADE.}
02/17/2017 SITE - Stormwater Final Inspection Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE A NOTICE OF TERMINATION IS FILED WITH ADEQ} ; {Activity date: 06/06/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - STORM WATER PERMIT WILL BE ACTIVE UNTIL CONSTRUCTION IS COMPLETED ON PHASE THREE OF THE PROJECT}
02/17/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR STARTING CONSTRUCTION AND NEED TO CALL IN FOR PRECON MEETING PER APPROVED PLANS} ; {Activity date: 03/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 03/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION}
03/13/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/13/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/06/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO LANDSCPING CONCERNS AT THIS TIME}
03/13/2017 ENGR Engineering Final Passed {Activity date: 03/13/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/27/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE EXISTING CATCH BASINS ARE CLEANED OUT PRIOR TO FINAL APPROVAL}

Documents

File Name Document Type  
001_NOTES_1 OF 5.TIF DEVELOPMENT PACKAGE VIEW
002_GRADING_2 OF 5.TIF DEVELOPMENT PACKAGE VIEW
003_DETAILS_3 OF 5.TIF DEVELOPMENT PACKAGE VIEW
004_HORIZONTAL CONTROL / SURVEY INFO_4 OF 5.TIF DEVELOPMENT PACKAGE VIEW
005_SWPPP_5 OF 5.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
DP13-0064,GRADINGAPPLICATION.PDF DOCUMENTS VIEW