Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP13-0064
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2017 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 02/17/2017 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 09/04/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR WORKING ON PAVING SITE. CHANGE FROM ASPHALT TO CONCRETE, NEED APPROVED PLANS TO REFLECT CHANGES MADE. |
| 02/17/2017 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 12/07/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - PHASE THREE THIRD BLDG DEMOLOISHED |
| 06/06/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - WALKED SITE WITH SUPERINTENDENT IN PREPARATION FOR COMPLETION OF PHASE TWO |
| 03/23/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - NO CHANGES, NO INSPECTION CALLED IN |
| 09/21/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SITE/GRADING CHANGES OR CONCERNS AT THIS TIME |
| 08/18/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - LIMTED SITE WORK AT THIS TIME FOR PHASE II NO STORM WATER CONCERNS AT THIS TIME |
| 07/15/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR WORKING ON BLDG, NO SIGNIFICANT SITE WORK AT THIS TIME |
| 06/09/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SITE WORK AS OF YET FOR PHASE II OF THE PROJECT, CONTRACTORS WORKING ON THE SALES BLDG 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 04/15/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - PHASE II OF PROJECT STARTED, SWEEP IP TRACKED SOIL OFF OF WETMORE RD. |
| 04/09/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - DEMO FOR PHASE II COMPLETE, CONTRACTOR WORKING ON BLDG PAD AND UTILITIES |
| 12/05/2014 | ENGR Grading Final | MRUSSO | Cancelled | Entered by DROBERT5 - RAINING |
| 10/22/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) LOOK AT FLOW PATTERNS FOR SHEET FLOW IN PARKING AREAS, ENSURE THEY FOLLOW DIRECTIONS SHOWN ON APPROVED PLANS. 2) PRIOR TO FINAL APPROVAL, CLEAN OUT CATCH BASINS |
| 10/14/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 09/12/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SITE/GRADING CONCERNS AT THIS TIME 2) CONTRACTOR POURING CURB AND WILL COMPLETE PAVING NEXT WEEK |
| 09/09/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR SETTING SUBGRADE IN PREP FOR CONCRETE PAVING. 2) ENSURE ELEVATIONS ARE MET AND COMPACTION IS MET PER APPROVED PLANS 3) PROVIDE A COPY OF APPROVAL LETTER FOR CHANGE FROM ASPHALT TO CONCRETE PAVING |
| 09/04/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR WORKING ON PAVING SITE. CHANGE FROM ASPHALT TO CONCRETE, NEED APPROVED PLANS TO REFLECT CHANGES MADE. |
| 09/02/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) provide approval for any changes to the approved site/grading plan. (paving changes-asphalt to concrete/bike parking) 2) ensure storm water permit is followed until the site is stabilized 3) ensure any existing storm drainage system is cleaned out of construction debris prior to final grading approval. |
| 08/27/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SOME VERTICAL CURB INSTALLED 2) CONTRACTOR GOING TO PAVE SITE SOON |
| 07/29/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT SITE/GARDING AT THIS TIME INSTALL OF UTILITIES AND LIGHTING ONLY |
| 06/30/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) MINIMAL SITE WORK AT THIS TIME 2) REMOVE EQUIPMENT AND MATERIAL OFF OF SEDIMENT CONTROLS 3) ENSURE SELF INSPECTIONS ARE ARE PERFORMED AND DOCUMENTED |
| 06/11/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) WALKED SITE, CONTRACTOR WORKING ON MAIN BLDG AND CAR WASH BLDG ALONG THE WEST SIDE 2) NO SIGNIFICANT SITE WORK AT THIS TIME 3) REMOVE CONSTRUCTION DEBRIS AND MATERIAL OFF OF SEDIMENT CONTROLS 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
| 05/30/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SWEEP UP TRACKED SOIL OFF OF ADJACENT ROADWAY 2) INSTALL SEDIMENT CONTROLS (GRAVEL BAG, WADDLE, SILT SOCK...) ON THE UPSTREAM SIDE OF THE EXISTING CATCH BASINLOCATED IN THE CURB AT THE MAIN ENTRANCE/EXIT 3) ENSURE SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP 4) CALL FOR INSPECTION FOR ANY SITE/GRADING CHANGES AND/OR CONCERNS |
| 05/13/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) REMOVE CONSTRUCTION DEBRIS AND MATERIAL OFF OF PERIMETER SEDIMENT CONTROLS ALONG THE NORTH/NE CORNER OF SITE. 2) REMOVE TEMPORARY DIRT RAMP (NE CORNER) AS SOON AS PRACTICABLE 3) ENSURE BATCH PLANTS AND WASH OUT WASTE IS DISPOSED OF ROUTINELY 4) NO SIGNIFICANT SITE WORK AT THIS TIME |
| 04/25/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION 3) CONTRACTOR WORKING ON THE BUIDING PAD, MINIMAL SITE WORK AT THIS TIME |
| 04/18/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR WORKING ON BLDG PAD, NO SIGNIFICANT SITE/GRADING AT THIS TIME |
| 04/03/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) CONTRACTOR WORKING ON BLDG PAD OVER-EXCAVATING AND ROUGH GRADING |