Permit: DP13-0064

Parcel: 10408095C


Addresses:

700 W WETMORE RD 03


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP13-0064

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
02/17/2017 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
12/07/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME
03/08/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
01/11/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
12/16/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
11/02/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
08/18/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - LIMTED SITE WORK AT THIS TIME FOR PHASE II NO STORM WATER CONCERNS AT THIS TIME
07/15/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - ENSURE COMPLIANCE WITH YOUR SWPPP
06/09/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) NO SITE WORK AS OF YET FOR PHASE II OF THE PROJECT, CONTRACTORS WORKING ON THE SALES BLDG 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
05/11/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME
05/04/2015 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by DROBERT5 - 1) SWEEP UP TRACKING OFF OF WETMORE 2) ENSURE STORM WATER SELF INSPECTIONS ARE COMPLETED
04/01/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
12/05/2014 SITE - Stormwater Follow-up MRUSSO Cancelled Entered by DROBERT5 - RAINING
10/22/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
10/14/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME
09/12/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME
09/09/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
09/04/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME
09/02/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME
08/27/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) STABILIZED ENTRANCE WAS MOVED 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
07/29/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME
06/30/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) MINIMAL SITE WORK AT THIS TIME 2) REMOVE EQUIPMENT AND MATERIAL OFF OF SEDIMENT CONTROLS 3) ENSURE SELF INSPECTIONS ARE ARE PERFORMED AND DOCUMENTED
06/11/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) WALKED SITE, CONTRACTOR WORKING ON MAIN BLDG AND CAR WASH BLDG ALONG THE WEST SIDE 2) NO SIGNIFICANT SITE WORK AT THIS TIME 3) REMOVE CONSTRUCTION DEBRIS AND MATERIAL OFF OF SEDIMENT CONTROLS 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
05/30/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) SWEEP UP TRACKED SOIL OFF OF ADJACENT ROADWAY 2) INSTALL SEDIMENT CONTROLS (GRAVEL BAG, WADDLE, SILT SOCK...) ON THE UPSTREAM SIDE OF THE EXISTING CATCH BASINLOCATED IN THE CURB AT THE MAIN ENTRANCE/EXIT 3) ENSURE SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP 4) CALL FOR INSPECTION FOR ANY SITE/GRADING CHANGES AND/OR CONCERNS
05/13/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) REMOVE CONSTRUCTION DEBRIS AND MATERIAL OFF OF PERIMETER SEDIMENT CONTROLS ALONG THE NORTH/NE CORNER OF SITE. 2) REMOVE TEMPORARY DIRT RAMP (NE CORNER) AS SOON AS PRACTICABLE 3) ENSURE BATCH PLANTS AND WASH OUT WASTE IS DISPOSED OF ROUTINELY 4) NO SIGNIFICANT SITE WORK AT THIS TIME
04/25/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION 3) CONTRACTOR WORKING ON THE BUIDING PAD, MINIMAL SITE WORK AT THIS TIME
04/18/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
04/03/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) CONTRACTOR WORKING ON BLDG PAD OVER-EXCAVATING AND ROUGH GRADING
03/27/2014 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) SEDIEMNT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER OF THE SITE PER YOUR SWPPP AND DIRECTION FROM PRE-CON INSPECTION 2) ENSURE STORM WATER SELF INSPECTIONS AND MAINTENANCE IS PERFORMED PER YOUR PERMIT AND DOCUMENT THEM 3) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAY AS NEEDED. 4) CALL FOR INSPECTION WHEN CONCRETE/MATERIALS WASH OUT IS INSTALLED.