Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3700 S CALLE POLAR 60
Apply Date:
11/08/2012
Applicant:
Description:
ESPERANZA EN ESCALANTE

Permit Reviews

Permit Number - DP12-0207
Permit Status: Complete
Permit Description: ESPERANZA EN ESCALANTE
Start Date Submittal Complete Date Status  
01/04/2013 DEV PKG - RESUBMITTAL 01/11/2013 COMPLETED Review Details
11/08/2012 DEV PKG - OK TO SUBMIT 11/08/2012 COMPLETED Review Details
11/08/2012 DEV PKG 12/14/2012 COMPLETED Review Details
12/14/2012 DEV PKG - RESUBMITTAL 12/27/2012 COMPLETED Review Details
12/27/2012 DEV PKG - RESUBMITTAL 01/04/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0207
Permit Description: ESPERANZA EN ESCALANTE
Total Completed Inspections - 8
Date Description Inspector Results Comments
02/14/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/14/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER YOUR SWPPP; HOWEVER ADDITIONAL CONTROLS MAY BE NEEDED ALONG THE NORTH PERIMETER.
2) ENSURE STORM WATER MAINT SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP.
3) PROVIDE A SIGNED COPY OF YOUR NOI AND POST IT ON SITE.
4) INSTALL, MAINTAIN AND USE A CONCRETE/MATERIALS WASH OUT ON SITE
5) RE-ESTABLISH YOUR ROCK ENTRANCE/EXIT AS NEEDED.
SWEEP UP SOIL TRACKING OFF PUBLIC ROADWAYS ROUTINELY}
04/01/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 04/01/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE NORTH PERIMETER
2) CONTROLS NEED TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION.
3) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED
4) THE CONTRACTOR HAS BEEN SWEEPING UP TRACKED SOIL ROUTINELY
5) ENSURE STORM WATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED PER YOUR PLAN
4) SOME SITE WORK TO INCLUDE THE CONSTRUCTION OF AN ACCESS ROADWAY
}
05/17/2013 SITE - Stormwater Follow-up Passed {Activity date: 05/17/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/02/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR INSTALLING UTILITIES AND GRADING ROAD.
2) SOME CONSTRUCTION OF HOUSES TAKING PLACE.
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
4) SWEEP UP TRACKING OF PUBLIC ROADWAY}
05/17/2013 SITE - Stormwater Final Inspection Passed {Activity date: 05/17/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/04/2013 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/04/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/17/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - INSTALL DG AROUND ALL BIKE PARKING
ENSURE DISTURBED AREAS ARE STABILIZED}
06/04/2013 ENGR Engineering Final Passed {Activity date: 06/04/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/17/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE CURB CUTE ALONG NORTH SIDE ROADWAY DRAIN AND DO NOT POND
2) MISSING DG AT BIKE PARKING
3) COMPLETE INSTALATION OF TRASH ENCLOSURE GATES
4) FILE A NOTICE OF TERMINATION W/ADEQ
5) COMPLETE BLDG PERMIT #T10CM01584}
06/04/2013 ENGR Grading Final Passed {Activity date: 06/04/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
10/28/2014 RSBU - Building Final Passed {Activity date: 10/28/2014; Status: Approved; Inspector: kmedina; Comment: Entered by KMEDINA1 - }

Documents

File Name Document Type  
001_COVER SHEET/GENERAL NOTES_1 OF 16.TIF DEVPLANS VIEW
002_CONSTRUCTION NOTES&SECTIONS_2 OF 16.TIF DEVPLANS VIEW
003_SITE/UTILITY_3 OF 16.TIF DEVPLANS VIEW
004_SITE/UTILITY_4 OF 16.TIF DEVPLANS VIEW
005_PAVING/GRADING_5 OF 16.TIF DEVPLANS VIEW
006_PAVING/GRADING_6 OF 16.TIF DEVPLANS VIEW
007_STORMWATER POLLUTION PREVENTION_7 OF 16.TIF DEVPLANS VIEW
008_STORMWATER POLLUTION PREVENTION_8 OF 16.TIF DEVPLANS VIEW
001_COVER SHEET L1_9 OF 16.TIF DEVPLANS VIEW
002_LANDSCAPE L2_10 OF 16.TIF DEVPLANS VIEW
003_LANDSCAPE L3_11 OF 16.TIF DEVPLANS VIEW
004_IRRIGATION L4_12 OF 16.TIF DEVPLANS VIEW
005_IRRIGATION L5_13 OF 16.TIF DEVPLANS VIEW
006_LANDSCAPE DETAILS L6_14 OF 16.TIF DEVPLANS VIEW
007_IRRIGATION DETAILS L7_15 OF 16.TIF DEVPLANS VIEW
008_IRRIGATION DETAILS L8_16 OF 16.TIF DEVPLANS VIEW