Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP12-0207

Parcel: Unknown

Inspection Status: Passed

Inspection History: SITE - Stormwater Setup and Controls

Permit Number - DP12-0207

Inspection Description - SITE - Stormwater Setup and Controls

Inspection Status - Passed

Date Description Inspector Results Comments
04/01/2013 SITE - Stormwater Setup and Controls MRUSSO Approved Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE NORTH PERIMETER 2) CONTROLS NEED TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION. 3) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED 4) THE CONTRACTOR HAS BEEN SWEEPING UP TRACKED SOIL ROUTINELY 5) ENSURE STORM WATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED PER YOUR PLAN 4) SOME SITE WORK TO INCLUDE THE CONSTRUCTION OF AN ACCESS ROADWAY