Description:
SITE/GRADING FOR NEW RETAIL STORE - DOLLAR GENERAL
Permit Reviews
Permit Number - DP12-0202
Permit Status: Complete
Permit Description: SITE/GRADING FOR NEW RETAIL STORE - DOLLAR GENERAL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/09/2013 | DEV PKG - RESUBMITTAL | 02/07/2013 | COMPLETED |
| 02/07/2013 | DEV PKG - RESUBMITTAL | 02/11/2013 | COMPLETED |
| 11/01/2012 | DEV PKG - OK TO SUBMIT | 11/01/2012 | COMPLETED |
| 11/01/2012 | DEV PKG | 01/09/2013 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0202
Permit Description: SITE/GRADING FOR NEW RETAIL STORE - DOLLAR GENERAL
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2013 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 02/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER THE APPROVED SWPPP. 2) ENSURE YOUR CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION. 3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOU SWPPP. 4) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE AS SOON AS APPLICABLE. 5) SWEEP UP TRACKED SOIL AS NEEDED 6) NO NPPO NEEDED, NO EXISTING VEGETATION} |
|
| 02/27/2013 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER THE APPROVED SWPPP. 2) ENSURE YOUR CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION. 3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOU SWPPP. 4) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE AS SOON AS APPLICABLE. 5) SWEEP UP TRACKED SOIL AS NEEDED 6) NO NPPO NEEDED, NO EXISTING VEGETATION} |
|
| 04/24/2013 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 04/24/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 06/21/2013 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/21/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 06/21/2013 | ENGR Engineering Final | Passed | {Activity date: 06/21/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 06/21/2013 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/21/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ALL DISTURBED AREAS NEED TO BE STABILIZED (ROCK/HYDROSEED) PER YOUR LANDSCAPE PLAN. 2) DEPRESS ALL LANDSCAPE AREAS MIN 6" 3) NEED ENG O F RECORD CERT STATEMENT PRIOR TO FINAL APPROVAL 4) SHOW WALL OPENINGS ALONG BOTTOM OF SCREEN WALL ON AS-BUILT 5) PED ACCESS SIDEWALK ALONG PANTANO DOES NOT MEET ADA - SLOPE GREATER THAN 5% 6) NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 06/07/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - WILL REVIEW PLANS WITH SUPER AND WALK SITE TOMORROW. ENSURE SITE WORK IS PER APPROVED PLANS. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE TRASH ENCLOSURES ON SITE HAVE BOLLARDS ON EACH SIDE OF THE ENCLOSURE, AS WELL AS THE BACK. INSIDE CLEAR WIDTH OF THE ENCLOSURE MUST BE 10' (INSIDE THE BOLLARDS) 2) NOTE ANY CHANGES MADE TO APPROVED PLANS PRIOR TO FINAL INSPECTION FOR APPROVAL 3) MAINTAIN SEDIMENT CONTROLS - IF THEY ARE INSTALLED THEY MUST BE MAINTAINED THROUGHOUT CONSTRUCTION} ; {Activity date: 04/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) no significant storm water concerns at this time 2) ensure storm water self inspections are performed and documented 3) sweep up any tracked soil 4) ensure you have installed a concrete/materials wash out} ; {Activity date: 04/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REPAIR AND/OR REPLACE MISSING OR DAMAGED SEDIMENT CONTROLS 2) REMOVE SOIL OR EQUIPMENT OFF OF SEDIMENT CONTROLS. 3) ENSURE STORM WATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED. 4) CALL FOR RE-INSPECTION WHEN COMPLETED 5) NO SITE WORK CONCERNS AT THIS TIME} ; {Activity date: 04/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) NO CHNAGES TO SITE, CONTRACTOR WORKING ON BLDG PAD AND FOUNDATION} |
|
| 06/21/2013 | ENGR Grading Final | Passed | {Activity date: 06/21/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ALL DISTURBED AREAS NEED TO BE STABILIZED (ROCK/HYDROSEED) PER YOUR LANDSCAPE PLAN. 2) DEPRESS ALL LANDSCAPE AREAS MIN 6" 3) NEED ENG O F RECORD CERT STATEMENT PRIOR TO FINAL APPROVAL 4) SHOW WALL OPENINGS ALONG BOTTOM OF SCREEN WALL ON AS-BUILT 5) PED ACCESS SIDEWALK ALONG PANTANO DOES NOT MEET ADA - SLOPE GREATER THAN 5% 6) NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 06/07/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - WILL REVIEW PLANS WITH SUPER AND WALK SITE TOMORROW. ENSURE SITE WORK IS PER APPROVED PLANS. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE TRASH ENCLOSURES ON SITE HAVE BOLLARDS ON EACH SIDE OF THE ENCLOSURE, AS WELL AS THE BACK. INSIDE CLEAR WIDTH OF THE ENCLOSURE MUST BE 10' (INSIDE THE BOLLARDS) 2) NOTE ANY CHANGES MADE TO APPROVED PLANS PRIOR TO FINAL INSPECTION FOR APPROVAL 3) MAINTAIN SEDIMENT CONTROLS - IF THEY ARE INSTALLED THEY MUST BE MAINTAINED THROUGHOUT CONSTRUCTION} ; {Activity date: 04/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REPAIR AND/OR REPLACE MISSING OR DAMAGED SEDIMENT CONTROLS 2) REMOVE SOIL OR EQUIPMENT OFF OF SEDIMENT CONTROLS. 3) ENSURE STORM WATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED. 4) CALL FOR RE-INSPECTION WHEN COMPLETED 5) NO SITE WORK CONCERNS AT THIS TIME} ; {Activity date: 04/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT SITE WORK CONCERNS AND/OR CHANGES} ; {Activity date: 03/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 03/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) NO CHNAGES TO SITE, CONTRACTOR WORKING ON BLDG PAD AND FOUNDATION} |
|
| 06/21/2013 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/21/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE NOTICE OF TERMINATION (NOT) W/ADEQ.} |