Permit: DP12-0202

Parcel: 136192140


Addresses:

3751 S PANTANO RD


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP12-0202

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
06/21/2013 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
06/10/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) ALL DISTURBED AREAS NEED TO BE STABILIZED (ROCK/HYDROSEED) PER YOUR LANDSCAPE PLAN. 2) DEPRESS ALL LANDSCAPE AREAS MIN 6" 3) NEED ENG O F RECORD CERT STATEMENT PRIOR TO FINAL APPROVAL 4) SHOW WALL OPENINGS ALONG BOTTOM OF SCREEN WALL ON AS-BUILT 5) PED ACCESS SIDEWALK ALONG PANTANO DOES NOT MEET ADA - SLOPE GREATER THAN 5% 6) NO SIGNIFICANT STORM WATER CONCERNS
06/07/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - WILL REVIEW PLANS WITH SUPER AND WALK SITE TOMORROW. ENSURE SITE WORK IS PER APPROVED PLANS. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
04/24/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) ENSURE TRASH ENCLOSURES ON SITE HAVE BOLLARDS ON EACH SIDE OF THE ENCLOSURE, AS WELL AS THE BACK. INSIDE CLEAR WIDTH OF THE ENCLOSURE MUST BE 10' (INSIDE THE BOLLARDS) 2) NOTE ANY CHANGES MADE TO APPROVED PLANS PRIOR TO FINAL INSPECTION FOR APPROVAL 3) MAINTAIN SEDIMENT CONTROLS - IF THEY ARE INSTALLED THEY MUST BE MAINTAINED THROUGHOUT CONSTRUCTION
04/24/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) no significant storm water concerns at this time 2) ensure storm water self inspections are performed and documented 3) sweep up any tracked soil 4) ensure you have installed a concrete/materials wash out
04/04/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) REPAIR AND/OR REPLACE MISSING OR DAMAGED SEDIMENT CONTROLS 2) REMOVE SOIL OR EQUIPMENT OFF OF SEDIMENT CONTROLS. 3) ENSURE STORM WATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED. 4) CALL FOR RE-INSPECTION WHEN COMPLETED 5) NO SITE WORK CONCERNS AT THIS TIME
04/01/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
03/08/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) NO CHNAGES TO SITE, CONTRACTOR WORKING ON BLDG PAD AND FOUNDATION