Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - NPPO
Permit Number - DP12-0202
Inspection Description - PDSD Site/Engineering Division - NPPO
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2013 | PDSD Site/Engineering Division - NPPO | MRUSSO | Approved | Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER THE APPROVED SWPPP. 2) ENSURE YOUR CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION. 3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOU SWPPP. 4) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE AS SOON AS APPLICABLE. 5) SWEEP UP TRACKED SOIL AS NEEDED 6) NO NPPO NEEDED, NO EXISTING VEGETATION |