Permit: DP12-0192
Permit Details
Apply Date:
10/24/2012
Applicant:
Description:
SITE/GRADING PLAN FOR T12TUP0021
Permit Reviews
Permit Number - DP12-0192
Permit Status: Complete
Permit Description: SITE/GRADING PLAN FOR T12TUP0021
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/31/2013 | REVISION - SITE | 02/12/2013 | COMPLETED |
02/12/2013 | REVISION - SITE | 02/12/2013 | COMPLETED |
03/12/2013 | REVISION - - 2ND | 03/13/2013 | COMPLETED |
10/24/2012 | SITE and/or GRADING | 11/29/2012 | COMPLETED |
12/05/2012 | REVISION - - 1ST | 01/29/2013 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP12-0192
Permit Status: Complete
Permit Description: SITE/GRADING PLAN FOR T12TUP0021
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
11/15/2012 | SPECIAL INSPECTION IS REQUIRED FOR MOUNTING WALL SIGN IN EXCESS OF 30' ABOVE GRADE PER SECTION 3-23 A2 OF TUCSON SIGN CODE. |
12/31/2012 | Basin to have no more than 6-in depth below outlet invert. |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0192
Permit Description: SITE/GRADING PLAN FOR T12TUP0021
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/08/2013 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/08/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/19/2013; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSTALL PER AP PLANS.} | |
03/12/2013 | SITE - Stormwater Final Inspection | Passed | {Activity date: 03/12/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/19/2013 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 03/19/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/19/2013 | ENGR Engineering Final | Passed | {Activity date: 03/19/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } ; {Activity date: 03/08/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/19/2013 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/19/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/11/2013; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED OVER THE SITE, CONTROLS IN PLACE AT THIS TIME. NO WORK BY THE CONTRACTOR AT THIS TIME, THEY WILL BE STARTING ON EXCAVATING FOR THE BASIN BEFORE THE END OF THIS WEEK.} | |
03/19/2013 | ENGR Grading Final | Passed | {Activity date: 03/19/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
03/19/2013 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 03/19/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by KMEDINA1 - } ; {Activity date: 02/05/2013; Status: Not Applicable; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I DROVE THROUGH THIS SITE AND HAVE NOTED THAT THE SILT FENCE HAS BEEN PLACED ON THD EAST AND WEST SIDES OF THE PROJECT AND THAT THEY HAVE PUT IN SOME GRAVEL FOR THE CONSTRUCTION ENTRANCE. THE CONTRACTOR HAS RELOCATED THE BARRELL CACTUS FROM WITHIN THE PROJECT LIMITS TO A NURSARY AT THE NORTHEAST CORNER OF THE SITE. RON STILL NEEDS TO HAVE HIS PRE-CON MEETING ON THIS SITE EVEN THOUGH THEY HAVE COMPLETED THE GRUBBING OF THE SITE. THERE WERE NO WORKERS ONSITE WHEN I STOPPED BY AT 3:30 THIS AFTERNOON.} | |
03/19/2013 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/19/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/06/2013; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL SWPPP CONTROLS PER AP PLAN AND PRE-CON MEETING. POVIIDE AP NPPO PLANS . POVIDE NOI.} |