Permit: DP12-0188
Permit Details
Apply Date:
10/22/2012
Applicant:
Lisa Bowers
Description:
22ND & HARRISONOriginally approved 1/1/20131st Revision appproved 5/20/13
Permit Reviews
Permit Number - DP12-0188
Permit Status: Complete
Permit Description: 22ND & HARRISONOriginally approved 1/1/20131st Revision appproved 5/20/13
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/20/2013 | DEV PKG - REVISION | 05/22/2013 | COMPLETED |
| 10/22/2012 | DEV PKG - OK TO SUBMIT | 10/23/2012 | COMPLETED |
| 10/24/2012 | DEV PKG | 11/29/2012 | COMPLETED |
| 11/29/2012 | DEV PKG - RESUBMITTAL | 03/20/2013 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0188
Permit Description: 22ND & HARRISONOriginally approved 1/1/20131st Revision appproved 5/20/13
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2013 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/05/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT, DISCUSSED PROJECT. 1) MOST SEDIMENT CONTROLS HAVE BEEN INSTALLED. INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT ASAP 2) INSTALL A CONCRETE/ MATERIALS WASH OUT 3) PERFORM REQUIRED STORM WATER SELF INSPECTIONS AND DOCUMENT THEM 4) SWEEP UP TRACKED SOIL OFF ROADWAYS ROUTINELY 5) CALL FOR ANY CHANGES AND/OR CONCERNS} |
|
| 06/11/2013 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/11/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME NO CHANGES AND/OR CONCERNS AT THIS TIME.} ; {Activity date: 04/17/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP 2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION 3) SWEEP UP ANY TRACKED SOIL OFF ADJACENT ROADWAYS 4) ENSURE A CONCRETE WASH OUT IS ON SITE AND IS BEING USED 5) CALL FOR INSPECTION FOR ANY FURTHER CHANGES TO THE CIVIL DRAWINGS 6) NO SITE WORK AT THIS TIME} ; {Activity date: 04/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 04/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORMWATER COCNERNS AT THIS TIME} ; {Activity date: 03/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 03/05/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PERIMETER WALL IN PLACE 2) BLDG PAD, FOUNDATION AND SOME FRAMING OF THE BLDG HAS BEEN CONSTRUCTED. 3) SEDIMENT CONTROLS ARE IN PLACE AND APPEAR TO BE MAINTAINED. 4) NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER PROBLEMS AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOUR CONCRETE WASH OUT IS USED. ENSURE YOUR SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION. NO OTHER STORM WATER CONCERNS AT THIS TIME} |
|
| 06/11/2013 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/11/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - INSTALL A SECOND ROCK ENTRANCE/EXIT OR REMOVE THE ENTRANCE/EXIT ALONG NORTH SIDE.} ; {Activity date: 02/05/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT, DISCUSSED PROJECT. 1) MOST SEDIMENT CONTROLS HAVE BEEN INSTALLED. INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT ASAP 2) INSTALL A CONCRETE/ MATERIALS WASH OUT 3) PERFORM REQUIRED STORM WATER SELF INSPECTIONS AND DOCUMENT THEM 4) SWEEP UP TRACKED SOIL OFF ROADWAYS ROUTINELY 5) CALL FOR ANY CHANGES AND/OR CONCERNS} |
|
| 07/10/2013 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/10/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/11/2013; Status: Not ready for Inspection; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE ALL LANDSCAPING SHOWN ON THE APPROVED PLAN, CALL FOR RE-INSP} | |
| 07/10/2013 | SITE - Stormwater Final Inspection | Passed | {Activity date: 07/10/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/11/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - STABILIZE THE SITE, CALL FOR RE-INSP} | |
| 12/03/2013 | ENGR Engineering Final | Passed | {Activity date: 12/03/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE/GRADING WAS SUBSTANTIALLY COMPLETED PER THE APPROVED PLANS} ; {Activity date: 07/26/2013; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALK THE SITE AT THE REQUEST OF ERNIE DUARTE TO LOOK AT THE PEDESTRIAN PATH LOCATED ON THE OUTER PERIMETER OF THE SITE. THIS PATHWAY APPEARS TO BE OUTSIDE OF THE SPECIFICATIONS FOR ACCESSIBLE ROUTES AND WILL HAVE TO BE CHANGED SO THAT IT COMES WITHIN COMPLIANCE.} ; {Activity date: 07/10/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/11/2013; Status: Not ready for Inspection; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A LETTER FROM YOUR ARCHITECT ON REDUCTION IN WATER HARVESTING AREA ALONG 22ND ST 2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 3) PROVIDE AN AS-BUILT TO THE CITY OF TUCSON 4) COMPLETE LANDSCAPING PER PLAN 5) PROVIDE WHEEL STOPS SHOWN ON APPR. PLAN 6) INSTALL HC SIGNS FOR PARKING 7) INSTALL HAND RAILING SHOWN ON PLANS} |
|
| 05/17/2019 | ENGR Grading Final | Passed | {Activity date: 05/17/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |