Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
9484 E 22ND ST
Address NEW:
9484 E 22ND ST
Apply Date:
10/22/2012
Applicant:
Lisa Bowers
Description:
22ND & HARRISONOriginally approved 1/1/20131st Revision appproved 5/20/13

Permit Reviews

Permit Number - DP12-0188
Permit Status: Complete
Permit Description: 22ND & HARRISONOriginally approved 1/1/20131st Revision appproved 5/20/13
Start Date Submittal Complete Date Status  
05/20/2013 DEV PKG - REVISION 05/22/2013 COMPLETED Review Details
10/22/2012 DEV PKG - OK TO SUBMIT 10/23/2012 COMPLETED Review Details
10/24/2012 DEV PKG 11/29/2012 COMPLETED Review Details
11/29/2012 DEV PKG - RESUBMITTAL 03/20/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0188
Permit Description: 22ND & HARRISONOriginally approved 1/1/20131st Revision appproved 5/20/13
Total Completed Inspections - 7
Date Description Inspector Results Comments
02/05/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/05/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT, DISCUSSED PROJECT.
1) MOST SEDIMENT CONTROLS HAVE BEEN INSTALLED. INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT ASAP
2) INSTALL A CONCRETE/ MATERIALS WASH OUT
3) PERFORM REQUIRED STORM WATER SELF INSPECTIONS AND DOCUMENT THEM
4) SWEEP UP TRACKED SOIL OFF ROADWAYS ROUTINELY
5) CALL FOR ANY CHANGES AND/OR CONCERNS}
06/11/2013 SITE - Stormwater Follow-up Passed {Activity date: 06/11/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
NO CHANGES AND/OR CONCERNS AT THIS TIME.} ; {Activity date: 04/17/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP
2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
3) SWEEP UP ANY TRACKED SOIL OFF ADJACENT ROADWAYS
4) ENSURE A CONCRETE WASH OUT IS ON SITE AND IS BEING USED
5) CALL FOR INSPECTION FOR ANY FURTHER CHANGES TO THE CIVIL DRAWINGS
6) NO SITE WORK AT THIS TIME} ; {Activity date: 04/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 04/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORMWATER COCNERNS AT THIS TIME} ; {Activity date: 03/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 03/05/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PERIMETER WALL IN PLACE
2) BLDG PAD, FOUNDATION AND SOME FRAMING OF THE BLDG HAS BEEN CONSTRUCTED.
3) SEDIMENT CONTROLS ARE IN PLACE AND APPEAR TO BE MAINTAINED.
4) NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER PROBLEMS AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOUR CONCRETE WASH OUT IS USED.
ENSURE YOUR SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION.
NO OTHER STORM WATER CONCERNS AT THIS TIME}
06/11/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 06/11/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - INSTALL A SECOND ROCK ENTRANCE/EXIT OR REMOVE THE ENTRANCE/EXIT ALONG NORTH SIDE.} ; {Activity date: 02/05/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT, DISCUSSED PROJECT.
1) MOST SEDIMENT CONTROLS HAVE BEEN INSTALLED. INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT ASAP
2) INSTALL A CONCRETE/ MATERIALS WASH OUT
3) PERFORM REQUIRED STORM WATER SELF INSPECTIONS AND DOCUMENT THEM
4) SWEEP UP TRACKED SOIL OFF ROADWAYS ROUTINELY
5) CALL FOR ANY CHANGES AND/OR CONCERNS}
07/10/2013 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/10/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/11/2013; Status: Not ready for Inspection; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE ALL LANDSCAPING SHOWN ON THE APPROVED PLAN, CALL FOR RE-INSP}
07/10/2013 SITE - Stormwater Final Inspection Passed {Activity date: 07/10/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/11/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - STABILIZE THE SITE, CALL FOR RE-INSP}
12/03/2013 ENGR Engineering Final Passed {Activity date: 12/03/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE/GRADING WAS SUBSTANTIALLY COMPLETED PER THE APPROVED PLANS} ; {Activity date: 07/26/2013; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALK THE SITE AT THE REQUEST OF ERNIE DUARTE TO LOOK AT THE PEDESTRIAN PATH LOCATED ON THE OUTER PERIMETER OF THE SITE. THIS PATHWAY APPEARS TO BE OUTSIDE OF THE SPECIFICATIONS FOR ACCESSIBLE ROUTES AND WILL HAVE TO BE CHANGED SO THAT IT COMES WITHIN COMPLIANCE.} ; {Activity date: 07/10/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/11/2013; Status: Not ready for Inspection; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A LETTER FROM YOUR ARCHITECT ON REDUCTION IN WATER HARVESTING AREA ALONG 22ND ST
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
3) PROVIDE AN AS-BUILT TO THE CITY OF TUCSON
4) COMPLETE LANDSCAPING PER PLAN
5) PROVIDE WHEEL STOPS SHOWN ON APPR. PLAN
6) INSTALL HC SIGNS FOR PARKING
7) INSTALL HAND RAILING SHOWN ON PLANS}
05/17/2019 ENGR Grading Final Passed {Activity date: 05/17/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_COVER SHEET_1 OF 10.TIF DOCUMENTS VIEW
002_REZONING CONDITIONS/DETAILS_2 OF 10.TIF DOCUMENTS VIEW
003_SITE/DETAILS_3 OF 10.TIF DOCUMENTS VIEW
004_GRADING / DETAILS_4 OF 10.TIF DOCUMENTS VIEW
005_NPPO_N1.TIF DOCUMENTS VIEW
006_LANDSCAPE_L1.TIF DOCUMENTS VIEW
007_IRRIGATION_L2.TIF DOCUMENTS VIEW
008_LANDSCAPE DETAILS_L3.TIF DOCUMENTS VIEW
009_IRRIGATION DETAILS_L4.TIF DOCUMENTS VIEW
010_SWPPP SITE_10 OF 10.TIF DOCUMENTS VIEW
SOUTHWEST GAS COMMENTS.PDF DOCUMENTS VIEW
PAG COMMENTS #1.PDF DOCUMENTS VIEW
PAG COMMENT #2.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW