Permit: DP12-0188

Parcel: 136075680


Addresses:

9484 E 22ND ST


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP12-0188

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
06/11/2013 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
05/01/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME NO CHANGES AND/OR CONCERNS AT THIS TIME.
04/17/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP 2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION 3) SWEEP UP ANY TRACKED SOIL OFF ADJACENT ROADWAYS 4) ENSURE A CONCRETE WASH OUT IS ON SITE AND IS BEING USED 5) CALL FOR INSPECTION FOR ANY FURTHER CHANGES TO THE CIVIL DRAWINGS 6) NO SITE WORK AT THIS TIME
04/10/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
04/01/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORMWATER COCNERNS AT THIS TIME
03/15/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME
03/05/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) PERIMETER WALL IN PLACE 2) BLDG PAD, FOUNDATION AND SOME FRAMING OF THE BLDG HAS BEEN CONSTRUCTED. 3) SEDIMENT CONTROLS ARE IN PLACE AND APPEAR TO BE MAINTAINED. 4) NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME
02/25/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER PROBLEMS AND/OR CONCERNS AT THIS TIME
02/19/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - ENSURE YOUR CONCRETE WASH OUT IS USED. ENSURE YOUR SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION. NO OTHER STORM WATER CONCERNS AT THIS TIME