Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
4901 N ORACLE RD
Apply Date:
09/18/2012
Applicant:
Description:
SUBARU DEALERSHIPOriginally approved 3/15/20131st Revision approved 8/29/13 (Add 2.5 acres to

Permit Reviews

Permit Number - DP12-0161
Permit Status: Complete
Permit Description: SUBARU DEALERSHIPOriginally approved 3/15/20131st Revision approved 8/29/13 (Add 2.5 acres to
Start Date Submittal Complete Date Status  
01/24/2013 DEV PKG - RESUBMITTAL 03/15/2013 COMPLETED Review Details
03/15/2013 DEV PKG - RESUBMITTAL 03/20/2013 COMPLETED Review Details
07/10/2013 REVISION - - 1ST 08/20/2013 COMPLETED Review Details
08/20/2013 REVISION - - 1ST 08/26/2013 COMPLETED Review Details
08/26/2013 REVISION - - 1ST 09/03/2013 COMPLETED Review Details
09/18/2012 DEV PKG - OK TO SUBMIT 09/19/2012 COMPLETED Review Details
09/19/2012 DEV PKG 10/08/2012 COMPLETED Review Details
10/08/2012 DEV PKG 11/16/2012 COMPLETED Review Details
11/16/2012 DEV PKG - RESUBMITTAL 12/11/2012 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0161
Permit Description: SUBARU DEALERSHIPOriginally approved 3/15/20131st Revision approved 8/29/13 (Add 2.5 acres to
Total Completed Inspections - 9
Date Description Inspector Results Comments
04/17/2013 COT - ENGR - Site - Assurance Release Passed {Activity date: 04/17/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT FROM CONCORD CONTRACTING, DISCUSSED CONSTRUCTION PROJECT:
1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP AND PER INSPECTION OF SITE. INSTALL CONTROLS ALONG THE EAST AND SOUTH PERIMETER OF THE SITE
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER INSPECTION.
3) ENSURE NATIVE PLANTS SHOWN ON YOUR NPPO PLAN ARE IDENTIFIED AND PRESERVED.
4) ADDITIONAL SEDIMENT CONTROLS MAY NEED TO BE ADDED AT A LATER TIME BASED ON CHANGING SITE CONDITIONS
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP
6) POST A COPY OF YOUR NOI ON SITE}
05/01/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 05/01/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PERIMETER SEDIMENT CONTROLS HAVE BEEN INSTALLED
2) CONTRACTOR NEEDS TO POST A COPY OF THE NOI AT THE ENTRANCE TO THE SITE.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
4) ENSURE ANY CHANGES MADE TO THE SWPPP ARE DOCUMENTED ON THE STORM WATER PLAN.
5) MAY NEED TO ADD SUPPLEMENTAL SEDIMENT CONTROLS BASED ON NEED} ; {Activity date: 04/24/2013; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE IS IN NON-COMPLIANCE WITH ADEQ AZPDES REQUIREMENTS AND THE CITY OF TUCSON'S STORM WATER ORDINANCE
1) INSTALL SEDIEMNT CONTROLS PER YOUR STORM WATER PLAN AND YOUR AZ STORM WATER PERMIT.
2) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
4) SWEEP UP TRACKED SOIL FROM ADJACENT PROPERTY

COMPLY BY MON 4/29/13, NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER AND NOTIFICATION OF ADEQ.}
08/20/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/20/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT FROM CONCORD CONTRACTING, DISCUSSED CONSTRUCTION PROJECT:
1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP AND PER INSPECTION OF SITE. INSTALL CONTROLS ALONG THE EAST AND SOUTH PERIMETER OF THE SITE
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER INSPECTION.
3) ENSURE NATIVE PLANTS SHOWN ON YOUR NPPO PLAN ARE IDENTIFIED AND PRESERVED.
4) ADDITIONAL SEDIMENT CONTROLS MAY NEED TO BE ADDED AT A LATER TIME BASED ON CHANGING SITE CONDITIONS
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP
6) POST A COPY OF YOUR NOI ON SITE}
12/19/2013 SITE - Stormwater Follow-up Passed {Activity date: 12/19/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. THE MAJORITY OF THE SITE IS PAVED.} ; {Activity date: 12/13/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR PAVING WEST SECTION OF PARKING LOT. (BACK) WEST SECTION OF LOT HAS A THICKENED EDGE OF ASPHALT AND NO CURB.
2) COMPLETE ALL SITE WORK AND LANDSCAPING PER PLAN PRIOR TO FINAL APPROVAL.
3) PROVIDE A CERT STATEMENT FROM THE EOR AND AN AS-BUILT DRAWING FOR FINAL
4) SUBMIT A NOTICE OF TERMINATION WITH ADEQ WHEN SITE IS STABILIZED.
5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/05/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIE TIME} ; {Activity date: 10/30/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/17/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 09/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REVIEWED APPROVED SITE/GRADING REVISION TO PROJECT.
2) ENSURE PROPER APPROVALS ARE GIVEN PRIOR TO WORKING IN A PIMA COUNTY REGULATED WASH.
3) CONTRACTOR PREP SUBGRADE FOR PAVEMENT
4) NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SEDIMENT CONTROLS ARE IN PLACE ALONG THE WEST SIDE PERIMETER.
2) STORM PIPE (SRP) HAS BEEN INSTALLED FROM THE NEW DRAINAGE CHANNEL ALONG THE NORTH SIDE TO THE EXISTING DRAINAGE IN THE ROW AT THE WEST SIDE OF THE SITE. A CATCH BASIN WILL BE ADDED AT A LATER TIME.
3) SOME CURB W/ CURB CUTES/OPENINGS HAVE BEEN INSTALLED AT THE FRONT OF THE BLDG EAST SIDE} ; {Activity date: 08/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/21/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES} ; {Activity date: 08/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MAY NEED TO ADD SEDIMENT CONTROLS TO THE BACK HALF OF THE SITE DUE TO THE FACT THAT IT IS GOING TO BE DEVELOPED NOW.
2) CONTINUE TO SWEEP TRACKING ROUTINELY
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 07/31/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AN/OR CONCERNS AT THIS TIME} ; {Activity date: 07/09/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SUPERINTENDENT STATED THAT CHANGES WILL BE MADE TO THE SITE PLAN. THE ADDITION OF PARKING ALONG THE ADJACENT WEST PARCEL IS BEING PROPOSED.
2) PROVIDE AN APPROVED PLAN FOR INSPECTION
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
4) ENSURE STORM WATER SELF INSPECTIONS ARE COMPLETED AND DOCUMENTED AND NECESSARY REPAIRS ARE MADE} ; {Activity date: 06/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 06/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR INSTALL A SWALE ALONG THE WEST SIDE OF THE SITE
2) SEDIMENT CONTROLS ARE IN PLACE AND ARE MAINTAINED
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 05/21/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR NEEDS TO INSTALL ADDITIONAL SEDIMENT CONTROLS ALONG THE WEST SIDE OF THE SITE. AREA IS OFF PROPERTY HOWEVER GRADING WORK IS BEING DONE
2) CONTRACTOR EXCAVATING FOR A RETAINING WALL ALONG SOUTH SIDE.
3) CONTRACTOR INSTALLING 30" RCP IN ADOT RIGHT OF WAY
4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 05/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME

ENSURE TRACKED SOIL IS SWEPT UP ON A ROUTINE BASIS} ; {Activity date: 05/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL A CONCRETE WASH OUT ON SITE
2) A NOI HAS BEEN POSTED AT THE ENTRANCE TO THE SITE
3) CONTRACTOR WORKING DIRT ON SITE FOR BLDG PAD AND PARKING LOT CONSTRUCTION
4) SILT SOCK NEEDS TO HAVE PLASTIC TAKEN OFF} ; {Activity date: 05/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PERIMETER SEDIMENT CONTROLS HAVE BEEN INSTALLED
2) CONTRACTOR NEEDS TO POST A COPY OF THE NOI AT THE ENTRANCE TO THE SITE.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
4) ENSURE ANY CHANGES MADE TO THE SWPPP ARE DOCUMENTED ON THE STORM WATER PLAN.
5) MAY NEED TO ADD SUPPLEMENTAL SEDIMENT CONTROLS BASED ON NEED}
12/27/2013 SITE - Stormwater Final Inspection Passed {Activity date: 12/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN STABILIZED
CONTRACTOR MUST FILE A NOTICE OF TERMINATION (NOT)}
02/13/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/13/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
2) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON SHOWING ALL CHANGES MADE
3) COMPETE ALL SITE DRESS-UP WORK

CALL FOR RE-INSPECTION} ; {Activity date: 12/27/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE LANDSCAPING PER THE APPROVED PLAN}
02/19/2014 ENGR Engineering Final Passed {Activity date: 02/19/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/13/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RECEIVED CERT LETTER FROM EOR AND APPROVED REVISED CIVIL PLANS.
CALL IN FOR INSPECTION TO VERIFY PLANS} ; {Activity date: 02/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING FINAL GRADING INSPECTION} ; {Activity date: 01/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
2) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON SHOWING ALL CHANGES MADE
3) COMPETE ALL SITE DRESS-UP WORK

CALL FOR RE-INSPECTION} ; {Activity date: 12/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR PAVING WEST SECTION OF PARKING LOT. (BACK) WEST SECTION OF LOT HAS A THICKENED EDGE OF ASPHALT AND NO CURB.
2) COMPLETE ALL SITE WORK AND LANDSCAPING PER PLAN PRIOR TO FINAL APPROVAL.
3) PROVIDE A CERT STATEMENT FROM THE EOR AND AN AS-BUILT DRAWING FOR FINAL
4) SUBMIT A NOTICE OF TERMINATION WITH ADEQ WHEN SITE IS STABILIZED.
5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
11/08/2016 RSBU - Building Final Passed {Activity date: 11/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/08/2016 ENGR Grading Final Passed {Activity date: 11/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET/NOTES_1 OF 18.TIF DEVPLANS VIEW
002_GRADING/PAVING NOTES_2 OF 18.TIF DEVPLANS VIEW
003_PRIVATE UTILITY NOTES_3 OF 18.TIF DEVPLANS VIEW
004_LANDSCAPE/NPP GENERAL NOTES_L1 4 OF 18.TIF DEVPLANS VIEW
005_SITE PLAN_5 OF 18.TIF DEVPLANS VIEW
006_5A OF 25.TIF DEVPLANS VIEW
006_GRADING/PAVING PLAN_6 OF 18.TIF DEVPLANS VIEW
007_GRADING/PAVING PLANS_7 OF 18.TIF DEVPLANS VIEW
009_7A OF 25.TIF DEVPLANS VIEW
010_7B OF 25.TIF DEVPLANS VIEW
008_COT STANDARD DETAIL 207_8 OF 18.TIF DEVPLANS VIEW
011_8 OF 25.TIF DEVPLANS VIEW
009_SITE,GRADING,UTILITY DETAILS_9 OF 18.TIF DEVPLANS VIEW
010_SITE/GRADING DETAILS_10 OF 18.TIF DEVPLANS VIEW
011_PRIVATE UTILITY PLAN_11 OF 18.TIF DEVPLANS VIEW
012_HORIZONTAL CONTROL PLAN_12 OF 18.TIF DEVPLANS VIEW
013_HORIZONTAL COORDINATE DATA_13 OF 18.TIF DEVPLANS VIEW
014_LANDSCAPE DETAILS_L8 14 OF 18.TIF DEVPLANS VIEW
015_PLANTING PLAN_15 OF 18.TIF DEVPLANS VIEW
018_L3 15 OF 25.TIF DEVPLANS VIEW
019_L4 15A OF 25.TIF DEVPLANS VIEW
016_IRRIGATION PLAN_16 OF 18.TIF DEVPLANS VIEW
020_L5 16 OF 25.TIF DEVPLANS VIEW
021_L6 16A OF 25.TIF DEVPLANS VIEW
017_NPPP_L2 17 OF 18.TIF DEVPLANS VIEW
023_L7 17A OF 25.TIF DEVPLANS VIEW
018_SWPPP_18 OF 18.TIF DEVPLANS VIEW
025_18A OF 25.TIF DEVPLANS VIEW
REVISION LETTER FOR JAN 24, 2013 SUBMITTAL.PDF DOCUMENTS VIEW
ADOT LETTER.PDF DOCUMENTS VIEW
ADOT CHANGES AND CITY CONCURRANCE.PDF DOCUMENTS VIEW
ADOT CLARIFICATION.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW