Permit: DP12-0161
Permit Details
Apply Date:
09/18/2012
Applicant:
Description:
SUBARU DEALERSHIPOriginally approved 3/15/20131st Revision approved 8/29/13 (Add 2.5 acres to
Permit Reviews
Permit Number - DP12-0161
Permit Status: Complete
Permit Description: SUBARU DEALERSHIPOriginally approved 3/15/20131st Revision approved 8/29/13 (Add 2.5 acres to
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/24/2013 | DEV PKG - RESUBMITTAL | 03/15/2013 | COMPLETED |
03/15/2013 | DEV PKG - RESUBMITTAL | 03/20/2013 | COMPLETED |
07/10/2013 | REVISION - - 1ST | 08/20/2013 | COMPLETED |
08/20/2013 | REVISION - - 1ST | 08/26/2013 | COMPLETED |
08/26/2013 | REVISION - - 1ST | 09/03/2013 | COMPLETED |
09/18/2012 | DEV PKG - OK TO SUBMIT | 09/19/2012 | COMPLETED |
09/19/2012 | DEV PKG | 10/08/2012 | COMPLETED |
10/08/2012 | DEV PKG | 11/16/2012 | COMPLETED |
11/16/2012 | DEV PKG - RESUBMITTAL | 12/11/2012 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0161
Permit Description: SUBARU DEALERSHIPOriginally approved 3/15/20131st Revision approved 8/29/13 (Add 2.5 acres to
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/17/2013 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 04/17/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT FROM CONCORD CONTRACTING, DISCUSSED CONSTRUCTION PROJECT: 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP AND PER INSPECTION OF SITE. INSTALL CONTROLS ALONG THE EAST AND SOUTH PERIMETER OF THE SITE 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER INSPECTION. 3) ENSURE NATIVE PLANTS SHOWN ON YOUR NPPO PLAN ARE IDENTIFIED AND PRESERVED. 4) ADDITIONAL SEDIMENT CONTROLS MAY NEED TO BE ADDED AT A LATER TIME BASED ON CHANGING SITE CONDITIONS 5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) POST A COPY OF YOUR NOI ON SITE} |
|
05/01/2013 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/01/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PERIMETER SEDIMENT CONTROLS HAVE BEEN INSTALLED 2) CONTRACTOR NEEDS TO POST A COPY OF THE NOI AT THE ENTRANCE TO THE SITE. 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 4) ENSURE ANY CHANGES MADE TO THE SWPPP ARE DOCUMENTED ON THE STORM WATER PLAN. 5) MAY NEED TO ADD SUPPLEMENTAL SEDIMENT CONTROLS BASED ON NEED} ; {Activity date: 04/24/2013; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE IS IN NON-COMPLIANCE WITH ADEQ AZPDES REQUIREMENTS AND THE CITY OF TUCSON'S STORM WATER ORDINANCE 1) INSTALL SEDIEMNT CONTROLS PER YOUR STORM WATER PLAN AND YOUR AZ STORM WATER PERMIT. 2) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE 3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 4) SWEEP UP TRACKED SOIL FROM ADJACENT PROPERTY COMPLY BY MON 4/29/13, NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER AND NOTIFICATION OF ADEQ.} |
|
08/20/2013 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/20/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT FROM CONCORD CONTRACTING, DISCUSSED CONSTRUCTION PROJECT: 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP AND PER INSPECTION OF SITE. INSTALL CONTROLS ALONG THE EAST AND SOUTH PERIMETER OF THE SITE 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER INSPECTION. 3) ENSURE NATIVE PLANTS SHOWN ON YOUR NPPO PLAN ARE IDENTIFIED AND PRESERVED. 4) ADDITIONAL SEDIMENT CONTROLS MAY NEED TO BE ADDED AT A LATER TIME BASED ON CHANGING SITE CONDITIONS 5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) POST A COPY OF YOUR NOI ON SITE} |
|
12/19/2013 | SITE - Stormwater Follow-up | Passed | {Activity date: 12/19/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. THE MAJORITY OF THE SITE IS PAVED.} ; {Activity date: 12/13/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR PAVING WEST SECTION OF PARKING LOT. (BACK) WEST SECTION OF LOT HAS A THICKENED EDGE OF ASPHALT AND NO CURB. 2) COMPLETE ALL SITE WORK AND LANDSCAPING PER PLAN PRIOR TO FINAL APPROVAL. 3) PROVIDE A CERT STATEMENT FROM THE EOR AND AN AS-BUILT DRAWING FOR FINAL 4) SUBMIT A NOTICE OF TERMINATION WITH ADEQ WHEN SITE IS STABILIZED. 5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/05/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIE TIME} ; {Activity date: 10/30/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/17/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 09/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REVIEWED APPROVED SITE/GRADING REVISION TO PROJECT. 2) ENSURE PROPER APPROVALS ARE GIVEN PRIOR TO WORKING IN A PIMA COUNTY REGULATED WASH. 3) CONTRACTOR PREP SUBGRADE FOR PAVEMENT 4) NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SEDIMENT CONTROLS ARE IN PLACE ALONG THE WEST SIDE PERIMETER. 2) STORM PIPE (SRP) HAS BEEN INSTALLED FROM THE NEW DRAINAGE CHANNEL ALONG THE NORTH SIDE TO THE EXISTING DRAINAGE IN THE ROW AT THE WEST SIDE OF THE SITE. A CATCH BASIN WILL BE ADDED AT A LATER TIME. 3) SOME CURB W/ CURB CUTES/OPENINGS HAVE BEEN INSTALLED AT THE FRONT OF THE BLDG EAST SIDE} ; {Activity date: 08/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/21/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES} ; {Activity date: 08/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MAY NEED TO ADD SEDIMENT CONTROLS TO THE BACK HALF OF THE SITE DUE TO THE FACT THAT IT IS GOING TO BE DEVELOPED NOW. 2) CONTINUE TO SWEEP TRACKING ROUTINELY 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 07/31/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AN/OR CONCERNS AT THIS TIME} ; {Activity date: 07/09/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SUPERINTENDENT STATED THAT CHANGES WILL BE MADE TO THE SITE PLAN. THE ADDITION OF PARKING ALONG THE ADJACENT WEST PARCEL IS BEING PROPOSED. 2) PROVIDE AN APPROVED PLAN FOR INSPECTION 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 4) ENSURE STORM WATER SELF INSPECTIONS ARE COMPLETED AND DOCUMENTED AND NECESSARY REPAIRS ARE MADE} ; {Activity date: 06/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 06/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR INSTALL A SWALE ALONG THE WEST SIDE OF THE SITE 2) SEDIMENT CONTROLS ARE IN PLACE AND ARE MAINTAINED 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 05/21/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR NEEDS TO INSTALL ADDITIONAL SEDIMENT CONTROLS ALONG THE WEST SIDE OF THE SITE. AREA IS OFF PROPERTY HOWEVER GRADING WORK IS BEING DONE 2) CONTRACTOR EXCAVATING FOR A RETAINING WALL ALONG SOUTH SIDE. 3) CONTRACTOR INSTALLING 30" RCP IN ADOT RIGHT OF WAY 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 05/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME ENSURE TRACKED SOIL IS SWEPT UP ON A ROUTINE BASIS} ; {Activity date: 05/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL A CONCRETE WASH OUT ON SITE 2) A NOI HAS BEEN POSTED AT THE ENTRANCE TO THE SITE 3) CONTRACTOR WORKING DIRT ON SITE FOR BLDG PAD AND PARKING LOT CONSTRUCTION 4) SILT SOCK NEEDS TO HAVE PLASTIC TAKEN OFF} ; {Activity date: 05/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PERIMETER SEDIMENT CONTROLS HAVE BEEN INSTALLED 2) CONTRACTOR NEEDS TO POST A COPY OF THE NOI AT THE ENTRANCE TO THE SITE. 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 4) ENSURE ANY CHANGES MADE TO THE SWPPP ARE DOCUMENTED ON THE STORM WATER PLAN. 5) MAY NEED TO ADD SUPPLEMENTAL SEDIMENT CONTROLS BASED ON NEED} |
|
12/27/2013 | SITE - Stormwater Final Inspection | Passed | {Activity date: 12/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN STABILIZED CONTRACTOR MUST FILE A NOTICE OF TERMINATION (NOT)} |
|
02/13/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 02/13/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 2) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON SHOWING ALL CHANGES MADE 3) COMPETE ALL SITE DRESS-UP WORK CALL FOR RE-INSPECTION} ; {Activity date: 12/27/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE LANDSCAPING PER THE APPROVED PLAN} |
|
02/19/2014 | ENGR Engineering Final | Passed | {Activity date: 02/19/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/13/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RECEIVED CERT LETTER FROM EOR AND APPROVED REVISED CIVIL PLANS. CALL IN FOR INSPECTION TO VERIFY PLANS} ; {Activity date: 02/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING FINAL GRADING INSPECTION} ; {Activity date: 01/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 2) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON SHOWING ALL CHANGES MADE 3) COMPETE ALL SITE DRESS-UP WORK CALL FOR RE-INSPECTION} ; {Activity date: 12/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR PAVING WEST SECTION OF PARKING LOT. (BACK) WEST SECTION OF LOT HAS A THICKENED EDGE OF ASPHALT AND NO CURB. 2) COMPLETE ALL SITE WORK AND LANDSCAPING PER PLAN PRIOR TO FINAL APPROVAL. 3) PROVIDE A CERT STATEMENT FROM THE EOR AND AN AS-BUILT DRAWING FOR FINAL 4) SUBMIT A NOTICE OF TERMINATION WITH ADEQ WHEN SITE IS STABILIZED. 5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} |
|
11/08/2016 | RSBU - Building Final | Passed | {Activity date: 11/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
11/08/2016 | ENGR Grading Final | Passed | {Activity date: 11/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |