Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP12-0161
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2016 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
11/08/2016 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
12/19/2013 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - MOST OF THE SITE/GRADING HAS COMPLETED |
12/13/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - LOOKED AT LANDSCAPING. CONTRACTOR COMPLETED PAVING NO SIGNIFICANT CHANGES AND OR CONCERNS |
12/11/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR PAVING WEST SECTION OF PARKING LOT. (BACK) WEST SECTION OF LOT HAS A THICKENED EDGE OF ASPHALT AND NO CURB. 2) COMPLETE ALL SITE WORK AND LANDSCAPING PER PLAN PRIOR TO FINAL APPROVAL. 3) PROVIDE A CERT STATEMENT FROM THE EOR AND AN AS-BUILT DRAWING FOR FINAL 4) SUBMIT A NOTICE OF TERMINATION WITH ADEQ WHEN SITE IS STABILIZED. 5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
11/05/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME |
10/30/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR PREPARING FOR PAVING IN PARKING LOT 2) NEED TO INSPECT STORM WATER PIPE OUTLET INSTALLATION |
10/24/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME |
10/17/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND OR CONCERNS AT THIS TIME |
10/11/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
09/26/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) REVIEWED APPROVED SITE/GRADING REVISION TO PROJECT. 2) ENSURE PROPER APPROVALS ARE GIVEN PRIOR TO WORKING IN A PIMA COUNTY REGULATED WASH. 3) CONTRACTOR PREP SUBGRADE FOR PAVEMENT 4) NO STORM WATER CONCERNS AT THIS TIME |
09/24/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SEDIMENT CONTROLS ARE IN PLACE ALONG THE WEST SIDE PERIMETER. 2) STORM PIPE (SRP) HAS BEEN INSTALLED FROM THE NEW DRAINAGE CHANNEL ALONG THE NORTH SIDE TO THE EXISTING DRAINAGE IN THE ROW AT THE WEST SIDE OF THE SITE. A CATCH BASIN WILL BE ADDED AT A LATER TIME. 3) SOME CURB W/ CURB CUTES/OPENINGS HAVE BEEN INSTALLED AT THE FRONT OF THE BLDG EAST SIDE |
08/26/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR INSTALL 196' OF 18" SRP STORM PIPE,CATCH BASIN TO CATCH BASIN WEST SIDE, PICS TAKEN. 2) NEED CITY APPROVED PLANS THAT SHOW CHANGES FOR INSPECTIONS. |
08/22/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR POUR CONCRETE FOR MANHOLE SHOWN ON APPROVED PLAN/TIE-INTO EXISTING 30"RCP. CONTRACTOR INSTALLED 30" RCP HOWEVER PLANS CALL FOR 36"RCP TO 30"RCP |
08/21/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR INSTALLING RCP ALONG SOUTH SIDE OF SITE. TIE-IN TO EXISTING PIPE DRAINING INTO THE RILLITO. WILL POUR MANHOLE TOMORROW, WILL TAKE PICTURES AND DOCUMENT INSTALLATION |
08/20/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR INSTALLING STORM PIPE ALONG THE ADOT RIGHT OF WAY. 2) CONTRACTOR MUST PROVIDE AN APPROVED PLAN SHOWING ANY AND ALL CHANGES MADE TO THE SITE/GRADING 3) WORKERS INSTALLING AN RCP STORM PIPE ALONG THE SOUTH SIDE OF THE SITE, CONNECTING TO THE EXISTING OUTLET PIPE |
07/31/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CHANGES MADE TO SITE WORK |
07/23/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SITE WORK AT THIS TIME |
07/15/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AN/OR CONCERNS AT THIS TIME |
07/09/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SUPERINTENDENT STATED THAT CHANGES WILL BE MADE TO THE SITE PLAN. THE ADDITION OF PARKING ALONG THE ADJACENT WEST PARCEL IS BEING PROPOSED. 2) PROVIDE AN APPROVED PLAN FOR INSPECTION 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 4) ENSURE STORM WATER SELF INSPECTIONS ARE COMPLETED AND DOCUMENTED AND NECESSARY REPAIRS ARE MADE |
06/26/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
06/11/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT SITE WORK AT THIS TIME FOOTINGS FOR PERIMETER RETAINING WALL ARE DUG AND RE-BAR IS SET |
06/04/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) TWO CATCH BASINS BEING FORMED AND POURED ALONG EAST SIDE OF SITE PER STD DETAIL 309 . 2) 113' OF 18" SRP AND 130' OF 24" SRP STORM PIPE BEING INSTALLED ALONG THE EAST SIDE OF THE SITE. PIPE TIES INTO CATCH BASINS AND OUT FALL IS LOCATED ALONG THE SE CORNER OF THE SITE. TRENCH WAS COMPLACTED AND BEDDED. - OK TO COVER/PICS TAKEN. 3) SWALE INSTALLED ALONG THE WEST SIDE OF SITE WITH A BENCH ALONG THE NW SIDE OF SITE |
06/03/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PER HIGH LIGHT ON PAGE 6&7 NORTH BASIN ONLY. |
05/21/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR NEEDS TO INSTALL ADDITIONAL SEDIMENT CONTROLS ALONG THE WEST SIDE OF THE SITE. AREA IS OFF PROPERTY HOWEVER GRADING WORK IS BEING DONE 2) CONTRACTOR EXCAVATING FOR A RETAINING WALL ALONG SOUTH SIDE. 3) CONTRACTOR INSTALLING 30" RCP IN ADOT RIGHT OF WAY 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
05/15/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
05/08/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) INSTALL A CONCRETE WASH OUT ON SITE 2) A NOI HAS BEEN POSTED AT THE ENTRANCE TO THE SITE 3) CONTRACTOR WORKING DIRT ON SITE FOR BLDG PAD AND PARKING LOT CONSTRUCTION 4) SILT SOCK NEEDS TO HAVE PLASTIC TAKEN OFF |
12/27/2013 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
07/09/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SUPERINTENDENT STATED THAT CHANGES WILL BE MADE TO THE SITE PLAN. THE ADDITION OF PARKING ALONG THE ADJACENT WEST PARCEL IS BEING PROPOSED. 2) PROVIDE AN APPROVED PLAN FOR INSPECTION 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 4) ENSURE STORM WATER SELF INSPECTIONS ARE COMPLETED AND DOCUMENTED AND NECESSARY REPAIRS ARE MADE |