Inspection Status: Passed
Inspection History: COT - ENGR - Site - Assurance Release
| Date |
Description |
Inspector |
Results |
Comments |
| 04/17/2013 |
COT - ENGR - Site - Assurance Release |
MRUSSO |
Approved |
Entered by DROBERT5 - MET WITH SUPERINTENDENT FROM CONCORD CONTRACTING, DISCUSSED CONSTRUCTION PROJECT:
1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP AND PER INSPECTION OF SITE. INSTALL CONTROLS ALONG THE EAST AND SOUTH PERIMETER OF THE SITE
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER INSPECTION.
3) ENSURE NATIVE PLANTS SHOWN ON YOUR NPPO PLAN ARE IDENTIFIED AND PRESERVED.
4) ADDITIONAL SEDIMENT CONTROLS MAY NEED TO BE ADDED AT A LATER TIME BASED ON CHANGING SITE CONDITIONS
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP
6) POST A COPY OF YOUR NOI ON SITE |