Permit Details

Status:
Complete
Type:
Development Package
Address:
1031 N PARK AV
Apply Date:
08/09/2012
Applicant:
Lisa Bowers
Description:
PARK AVE HOUSINGOriginally approved 1/28/13Revision 1 approved 6/4/2013

Permit Reviews

Permit Number - DP12-0132
Permit Status: Complete
Permit Description: PARK AVE HOUSINGOriginally approved 1/28/13Revision 1 approved 6/4/2013
Start Date Submittal Complete Date Status  
01/28/2013 DEV PKG - RESUBMITTAL 05/31/2013 COMPLETED Review Details
05/16/2014 DEV PKG - REVISION 06/11/2014 COMPLETED Review Details
06/04/2013 REVISION - - 1ST 05/16/2014 COMPLETED Review Details
06/11/2014 DEV PKG - REVISION 06/12/2014 COMPLETED Review Details
08/05/2014 DEV PKG - REVISION 11/10/2014 COMPLETED Review Details
08/09/2012 DEV PKG - OK TO SUBMIT 08/10/2012 COMPLETED Review Details
08/13/2012 DEV PKG 10/15/2012 COMPLETED Review Details
10/17/2012 RESUBMITTAL - CDRC - DEV PLAN 11/01/2012 COMPLETED Review Details
11/06/2012 RESUBMITTAL - CDRC - DEV PLAN 12/21/2012 COMPLETED Review Details
11/10/2014 DEV PKG - REVISION 11/10/2014 ACTIVE Review Details
12/21/2012 DEV PKG - RESUBMITTAL 01/28/2013 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP12-0132
Permit Status: Complete
Permit Description: PARK AVE HOUSINGOriginally approved 1/28/13Revision 1 approved 6/4/2013
Total Outstanding Activity Conditions - 1
Date Name
01/28/2013 The following 20 conditions apply to DP12-0132:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at Planning & Development Services Department (PDSD), or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://cms3.tucsonaz.gov/pdsd/inspections2)Some grading or other construction activities will require separate special inspections by EOR or consultants. During these inspections it is recommended that PDSD Inspectors are present. Discuss during Pre-con or contact PDSD Engineering Inspector to confirm which inspections may be needed. 3)Project shall conform to recommendations and requirements found in geotechnical engineering report for this project and any subsequent addenda.4)Contractor is responsible to protect in place any existing utilities; all work within these easements must be coordinated with the proper utilities prior to any site construction. All recordation dkt/pg or sequence numbers shall be listed on subsequent plans for revisions or as-builts.5)A copy of stamped approved grading plan(s), permit(s), NOI, AzPDES general permit, geotechnical report/addenda, and other reports shall be kept at site at all times, until final grading approval.6)Disturbance Limits shall be maintained and no disturbance outside of approved project limits will be allowed. Stop Work Order may be issued if disturbance occurs outside of approved limits as shown on approved plans. There shall be no disturbance, construction vehicle traffic or parking, or stockpiling outside of approved limits as shown on approved plans.7)Interim erosion and sediment controls shall be maintained per approved grading plans at downstream areas of disturbance limits. Interim control measures shall be placed within approved project limits. Prior to final approval all temporary controls shall be removed and permanent controls shall be functioning in place.8)Stabilized entrances shall be maintained at all active access entrances. Use of water trucks or other dust controls shall be utilized, and construction entrances shall be maintained to minimize sedimentation, dust issues, and tracking.9)Any trees within SVT's shall be checked and trimmed to assure that they are clear of leaves and branches to a height of at least six feet above grade. Location of trees within existing and future sight visibility triangles may be restricted or modified as determined by City of Tucson Inspectors in order to preserve visibility.10)During construction activities, traffic control plans may be required if there is a safety hazard potential from construction activities conflicting with public traffic. It may be necessary to submit a copy of a traffic control plan to PDSD. Onsite traffic control plans shall minimize traffic hazard conditions between public access to buildings, and construction vehicles & activities.

Conditions

Permit Number - DP12-0132
Permit Status: Complete
Permit Description: PARK AVE HOUSINGOriginally approved 1/28/13Revision 1 approved 6/4/2013
Date Description Comments
01/28/2013 11)Any revisions to Grading Plan sheets must be reviewed by PDSD Engineering Engineer and may include discussion, details, or a revised grading plan. Call PDSD Engineering Division at 791-5550 to discuss any revisions. Any revision shall include clarification of spot elevations and floodplain limits at west side of project to assure that proposed residential structure and location of portion of solid waste pick-up landing is outside of floodplain.12)If grading construction is expected to last longer than expiration date of permit, contact PDSD to renew/extend permit. If final grading inspection has not been completed before permit expires, and permit has not been renewed, additional fees and reviews may be required. Requests for permit extensions may be submitted to Planning & Development Services Department (attn: Claudia Buford), prior to permit expiration date, for consideration of grading plan extension approval.13)City of Tucson grading standards TSM Section 2 applies. 14)For inspection purposes, post City of Tucson's "AZPDES - Posting Requirements" green sheet, or the NOI at construction entrance of site, at beginning of construction activities, and maintain this posted document throughout project construction.15)Operator shall report to ADEQ any noncompliance (including spills) which may endanger human health or the environment. Operator shall orally notify office listed below within 24 hours:(a)Arizona Department of Environmental Quality1110 W. Washington, 5th floor (5515B-1)Phoenix, AZ 85007Office: 602-771-4466; Fax 602-771-450516)Receiving waters are West University Wash. Also the following water system is downstream: Santa Cruz River.17)Permitee shall notify PDSD when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all erosion control measures have been completed in accordance with approved grading plan and grading permit, and all conditions of permit are completed. 18)Remaining signatures from Operators must be on site copy of SWPPP (exhibit or report) at or before commencement of construction. All Operators shall be identified and have separate certification statements. Assure these certifications are available on-site.19)After interim controls are removed, permanent erosion control are required on all disturbed areas, in form of vegetative cover, gravel, a sized decorative rock, and/or other controls.20)As-builts are required to be submitted. The as-built / "Final Revised Grading Plan" and substantial completion letter(s) may be submitted under activity number DP12-0132 to PDSD permit clerks. The documents will be reviewed and then if acceptable, a copy of the as-builts will be provided to PDSD Engineering Inspector for final grading inspections. For grading permit project closure documentation, submit: one copy of original grading plans, 2 copies of sheets that show as-built information, letters of completion (one for drainage improvements, and another letter for substantial completion of overall project). As-builts shall include: seal on sheets that show as-built data, pad elevations for parking structure and lowest finished floor at main level, inverts drainage pipes/systems, elevations around parking entry area showing elevations high enough to keep out jurisdictional floodplain, access easements near alley area as approved on PIA revision, and general grades as determined by RLS to show substantial completion for onsite and offsite improvements of project.

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0132
Permit Description: PARK AVE HOUSINGOriginally approved 1/28/13Revision 1 approved 6/4/2013
Total Completed Inspections - 7
Date Description Inspector Results Comments
04/02/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/02/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT ON SITE TO DISCUSS NEW TRASH ENCLOSURE.
CONTRACTOR HAS BEEN WORKING ON SITE FOR A MONTH PRIOR TO CALLING FOR A GRADING/SITE/STORM WATER PRE-CON.
PATRICK LINNENN WITH BEAL DERKENNE CONSTRUCTION 602-769-3167.
CONTRACTOR DOES NOT HAVE A STORM WATER PERMIT OR PLAN HOWEVER MUST CONTINUE TO KEEP DISTURBED SOIL ON SITE.
TRASH ENCLOSURE MUST HAVE BOLLARDS ALONG THE SIDES AND BACK AND HAVE A 10 X 10 CLEAR WIDTH WITH A 5 FOOT APRON AND GATES.}
07/28/2014 SITE - Stormwater Follow-up Passed {Activity date: 07/28/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICAT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
08/05/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/05/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/08/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) LIMITED SITE WORK DUE TO THE FOOT PRINT OF THE BLDG.
2) MINIMAL SITE INSPECTIONS CALLED IN BY CONTRACTOR.
3) SITE IS LESS THAN 1 ACRE, THEREFORE NO SWPPP IS REQUIRED, HOWEVER DISTURBED SOIL MUST BE KEPT ON SITE DURING CONSTRUCTION.
4) ENSURE AN APPROVED SITE/GRADING/LANDSCAPE PLAN IS AVAILABLE ON SITE FOR A FINAL INSPECTION.
5) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL SITE GRADING WAS COMPLETED PER THE APPROVED PLAN.
6) ANY UNDERGROUD STORM DRAINAGE CAN NOT BE VERIFIED BY THE INSPECTOR AFTER INSTALLATION.}
08/05/2014 ENGR Grading Final Passed {Activity date: 08/05/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/05/2014 SITE - Stormwater Final Inspection Passed {Activity date: 08/05/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/05/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 08/05/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/01/2018 ENGR Engineering Final Passed {Activity date: 05/01/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/05/2014; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL EXTERIOR WORK ON THIS SITE PRIOR TO SCHEDULING THIS INSPECTION.} ; {Activity date: 01/08/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) LIMITED SITE WORK DUE TO THE FOOT PRINT OF THE BLDG.
2) MINIMAL SITE INSPECTIONS CALLED IN BY CONTRACTOR.
3) SITE IS LESS THAN 1 ACRE, THEREFORE NO SWPPP IS REQUIRED, HOWEVER DISTURBED SOIL MUST BE KEPT ON SITE DURING CONSTRUCTION.
4) ENSURE AN APPROVED SITE/GRADING/LANDSCAPE PLAN IS AVAILABLE ON SITE FOR A FINAL INSPECTION.
5) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL SITE GRADING WAS COMPLETED PER THE APPROVED PLAN.
6) ANY UNDERGROUD STORM DRAINAGE CAN NOT BE VERIFIED BY THE INSPECTOR AFTER INSTALLATION.}

Documents

File Name Document Type  
001_COVER SHEET_000.TIF DEVPLANS VIEW
002_ARCHITECTURAL_A001.TIF DEVPLANS VIEW
003_ZONING AXON_A002.TIF DEVPLANS VIEW
004_LEVEL P2_A100.TIF DEVPLANS VIEW
005_LEVEL P1_A101.TIF DEVPLANS VIEW
006_NOTES & LEGEND_C1.0.TIF DEVPLANS VIEW
007_EXISTING CONDITIONS_C2.0.TIF DEVPLANS VIEW
008_SITE_C3.0.TIF DEVPLANS VIEW
009_GRADING & DRAINAGE_C4.0.TIF DEVPLANS VIEW
010_DETAILS_C5.0.TIF DEVPLANS VIEW
011_DETAILS_C5.1.TIF DEVPLANS VIEW
012_PRIVATE UTILITY_C6.0.TIF DEVPLANS VIEW
013_HORIZONTAL CONTROL_C7.0.TIF DEVPLANS VIEW
014_SWPPP_C8.0.TIF DEVPLANS VIEW
015_AZ STATE C U IMPROVEMENTS_C9.0.TIF DEVPLANS VIEW
016_HARDSCAPE_L001.TIF DEVPLANS VIEW
017_LANDSCAPE_L002.TIF DEVPLANS VIEW
018_IRRIGATION_L003.TIF DEVPLANS VIEW
019_HARDSCAPE DETAILS_L004.TIF DEVPLANS VIEW
020_HARDSCAPE DETAILS_L005.TIF DEVPLANS VIEW
021_HARDSCAPE DETAILS_L006.TIF DEVPLANS VIEW
022_LANDSCAPE DETAILS_L007.TIF DEVPLANS VIEW
023_IRRIGATION DETAILS_L008.TIF DEVPLANS VIEW
024_IRRIGATION DETAILS_L009.TIF DEVPLANS VIEW
DESIGNPROF EMAIL1 DOCUMENTS VIEW
DESIGNPROF EMAIL2 DOCUMENTS VIEW
PARK AVE_DP1201-32_EMAIL.PDF.PDF DOCUMENTS VIEW
CREDIT UNION CHANGES.PDF DOCUMENTS VIEW
MORE CREDIT UNION CHANGES.PDF DOCUMENTS VIEW
SVT E-MAIL.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
REVISIONLETTER.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW