Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 04/02/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - MET WITH SUPERINTENDENT ON SITE TO DISCUSS NEW TRASH ENCLOSURE.
CONTRACTOR HAS BEEN WORKING ON SITE FOR A MONTH PRIOR TO CALLING FOR A GRADING/SITE/STORM WATER PRE-CON.
PATRICK LINNENN WITH BEAL DERKENNE CONSTRUCTION 602-769-3167.
CONTRACTOR DOES NOT HAVE A STORM WATER PERMIT OR PLAN HOWEVER MUST CONTINUE TO KEEP DISTURBED SOIL ON SITE.
TRASH ENCLOSURE MUST HAVE BOLLARDS ALONG THE SIDES AND BACK AND HAVE A 10 X 10 CLEAR WIDTH WITH A 5 FOOT APRON AND GATES. |