Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
07/12/2012
Applicant:
Description:
TEP CONTRACTORS YARD

Permit Reviews

Permit Number - DP12-0108
Permit Status: Complete
Permit Description: TEP CONTRACTORS YARD
Start Date Submittal Complete Date Status  
07/12/2012 DEV PKG - OK TO SUBMIT 07/12/2012 COMPLETED Review Details
07/12/2012 DEV PKG 08/16/2012 COMPLETED Review Details
10/03/2012 RESUB - SITE and/or GRADING 11/07/2012 COMPLETED Review Details
11/07/2012 RESUB - SITE and/or GRADING 11/15/2012 COMPLETED Review Details
11/15/2012 RESUB - SITE/GRADING ALL 11/16/2012 ACTIVE Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0108
Permit Description: TEP CONTRACTORS YARD
Total Completed Inspections - 8
Date Description Inspector Results Comments
09/27/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO PRE-CON CALLED IN. MET WITH SUPERINTENDENT. JOB ABOUT 50% COMPLETED.
2) JOB CONSITS OF A PARKING LOT AND STORAGE YARD W/ A RET/DET BASIN ALONG THE WEST SIDE.
3) SOME WATER HARVESTING AREAS WILL BE INSTALLED.
4) AN NOI IS ON SITE AND SHOULD BE POSTED AT THE ENTRANCE.
5) A STABILIZED CONSTRUCTION ENTRANCE IS IN PLACE AND SEDIMENT CONTROLS HAVE BEEN ONSTALLED ALONG THE WEST PERIMETER.
6) STORM WATER SELF INSPECTIONS ARE BEING PERFORMED AND DOCUMENTED.
7) A CONCRETE/MATERIALS WASH OUT MUST BE INSTALLED AND USED WHEN APPLICABLE.
8) CALL OUT FOR INSPECTION PRIOR TO POURING FOOTINGS FOR TRASH ENCLOSURE}
11/07/2013 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 11/07/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
11/07/2013 SITE - Stormwater Follow-up Passed {Activity date: 11/07/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN STABILIZED AND COMPLETED PER APPROVED PLAN} ; {Activity date: 10/28/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER COCNERNS} ; {Activity date: 10/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/09/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) WILL INSPECT CONCRETE HEADER INSTALL AT OUTLET OF RET/DET BASIN
2) WILL INSPECT INSTALL OF ROCK RIP RAP SHOWN ON APPROVED PLAN
3) WILL INSPECT INSTALL OF TRASH ENCLOSURE
4) WILL INSPECT LANDSCAPING PER PLAN.
5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO PRE-CON CALLED IN. MET WITH SUPERINTENDENT. JOB ABOUT 50% COMPLETED.
2) JOB CONSITS OF A PARKING LOT AND STORAGE YARD W/ A RET/DET BASIN ALONG THE WEST SIDE.
3) SOME WATER HARVESTING AREAS WILL BE INSTALLED.
4) AN NOI IS ON SITE AND SHOULD BE POSTED AT THE ENTRANCE.
5) A STABILIZED CONSTRUCTION ENTRANCE IS IN PLACE AND SEDIMENT CONTROLS HAVE BEEN ONSTALLED ALONG THE WEST PERIMETER.
6) STORM WATER SELF INSPECTIONS ARE BEING PERFORMED AND DOCUMENTED.
7) A CONCRETE/MATERIALS WASH OUT MUST BE INSTALLED AND USED WHEN APPLICABLE.
8) CALL OUT FOR INSPECTION PRIOR TO POURING FOOTINGS FOR TRASH ENCLOSURE}
11/07/2013 SITE - Stormwater Final Inspection Passed {Activity date: 11/07/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN STABILIZED PER THE APPROVED GRADING PLAN
ENSURE YOU FILE A (NOT) NOTICE OF TERMINATION WITH ADEQ}
11/15/2013 ENGR Engineering Final Passed {Activity date: 11/15/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE/GRADING WAS COMPLETED PER THE APPROVED PLAN} ; {Activity date: 11/07/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE FENCE INSTALLATION AND ROCK RIP RAP CONSTRUCTION ALONG THE WEST DRAINAGE, CALL FOR FINAL GRADING INSPECTION}
10/28/2014 RSBU - Building Final Passed {Activity date: 10/28/2014; Status: Approved; Inspector: kmedina; Comment: Entered by KMEDINA1 - }
05/30/2019 ENGR Grading Final Passed {Activity date: 05/30/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/30/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 05/30/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_LOCATION PLAN_DP-1.TIF DEVELOPMENT PACKAGE VIEW
002_DEVELOPMENT PLAN_DP-2.TIF DEVELOPMENT PACKAGE VIEW
003_COVER SHEET/GENERAL NOTES_C-1.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING /DRAINAGE_C-2.TIF DEVELOPMENT PACKAGE VIEW
005_DETAILS/SECTIONS_C-3.TIF DEVELOPMENT PACKAGE VIEW
006_SITE BOUNDARY/EASEMENTS/ZONING_C-4.TIF DEVELOPMENT PACKAGE VIEW
007_COVER SHEET/GENERAL NOTES_COVER.TIF DEVELOPMENT PACKAGE VIEW
008_PLANTING PLAN_P-1.TIF DEVELOPMENT PACKAGE VIEW
009_PLANTING PLAN_P-2.TIF DEVELOPMENT PACKAGE VIEW
010_IRRIGATION PLAN_IR-1.TIF DEVELOPMENT PACKAGE VIEW
011_DETAILS_D-1.TIF DEVELOPMENT PACKAGE VIEW
012_SPECS_D-2.TIF DEVELOPMENT PACKAGE VIEW
013_SPECS_D-3.TIF DEVELOPMENT PACKAGE VIEW
014_SPECS_D-4.TIF DEVELOPMENT PACKAGE VIEW
015_SPECS_D-5.TIF DEVELOPMENT PACKAGE VIEW
016_NOTES LOCATION PLAN_COVER.TIF DEVELOPMENT PACKAGE VIEW
017_INVENTORY PLAN_N-1.TIF DEVELOPMENT PACKAGE VIEW
018_NOTES_N-2.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW