Permit: DP12-0108
Permit Details
Apply Date:
07/12/2012
Applicant:
Wayne Swan
Description:
TEP CONTRACTORS YARD
Permit Reviews
Permit Number - DP12-0108
Permit Status: Complete
Permit Description: TEP CONTRACTORS YARD
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/12/2012 | DEV PKG - OK TO SUBMIT | 07/12/2012 | COMPLETED |
07/12/2012 | DEV PKG | 08/16/2012 | COMPLETED |
10/03/2012 | RESUB - SITE and/or GRADING | 11/07/2012 | COMPLETED |
11/07/2012 | RESUB - SITE and/or GRADING | 11/15/2012 | COMPLETED |
11/15/2012 | RESUB - SITE/GRADING ALL | 11/16/2012 | ACTIVE |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0108
Permit Description: TEP CONTRACTORS YARD
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2013 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/27/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO PRE-CON CALLED IN. MET WITH SUPERINTENDENT. JOB ABOUT 50% COMPLETED. 2) JOB CONSITS OF A PARKING LOT AND STORAGE YARD W/ A RET/DET BASIN ALONG THE WEST SIDE. 3) SOME WATER HARVESTING AREAS WILL BE INSTALLED. 4) AN NOI IS ON SITE AND SHOULD BE POSTED AT THE ENTRANCE. 5) A STABILIZED CONSTRUCTION ENTRANCE IS IN PLACE AND SEDIMENT CONTROLS HAVE BEEN ONSTALLED ALONG THE WEST PERIMETER. 6) STORM WATER SELF INSPECTIONS ARE BEING PERFORMED AND DOCUMENTED. 7) A CONCRETE/MATERIALS WASH OUT MUST BE INSTALLED AND USED WHEN APPLICABLE. 8) CALL OUT FOR INSPECTION PRIOR TO POURING FOOTINGS FOR TRASH ENCLOSURE} |
|
11/07/2013 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 11/07/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
11/07/2013 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/07/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN STABILIZED AND COMPLETED PER APPROVED PLAN} ; {Activity date: 10/28/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER COCNERNS} ; {Activity date: 10/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/09/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) WILL INSPECT CONCRETE HEADER INSTALL AT OUTLET OF RET/DET BASIN 2) WILL INSPECT INSTALL OF ROCK RIP RAP SHOWN ON APPROVED PLAN 3) WILL INSPECT INSTALL OF TRASH ENCLOSURE 4) WILL INSPECT LANDSCAPING PER PLAN. 5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO PRE-CON CALLED IN. MET WITH SUPERINTENDENT. JOB ABOUT 50% COMPLETED. 2) JOB CONSITS OF A PARKING LOT AND STORAGE YARD W/ A RET/DET BASIN ALONG THE WEST SIDE. 3) SOME WATER HARVESTING AREAS WILL BE INSTALLED. 4) AN NOI IS ON SITE AND SHOULD BE POSTED AT THE ENTRANCE. 5) A STABILIZED CONSTRUCTION ENTRANCE IS IN PLACE AND SEDIMENT CONTROLS HAVE BEEN ONSTALLED ALONG THE WEST PERIMETER. 6) STORM WATER SELF INSPECTIONS ARE BEING PERFORMED AND DOCUMENTED. 7) A CONCRETE/MATERIALS WASH OUT MUST BE INSTALLED AND USED WHEN APPLICABLE. 8) CALL OUT FOR INSPECTION PRIOR TO POURING FOOTINGS FOR TRASH ENCLOSURE} |
|
11/07/2013 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/07/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN STABILIZED PER THE APPROVED GRADING PLAN ENSURE YOU FILE A (NOT) NOTICE OF TERMINATION WITH ADEQ} |
|
11/15/2013 | ENGR Engineering Final | Passed | {Activity date: 11/15/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE/GRADING WAS COMPLETED PER THE APPROVED PLAN} ; {Activity date: 11/07/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE FENCE INSTALLATION AND ROCK RIP RAP CONSTRUCTION ALONG THE WEST DRAINAGE, CALL FOR FINAL GRADING INSPECTION} | |
10/28/2014 | RSBU - Building Final | Passed | {Activity date: 10/28/2014; Status: Approved; Inspector: kmedina; Comment: Entered by KMEDINA1 - } | |
05/30/2019 | ENGR Grading Final | Passed | {Activity date: 05/30/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/30/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/30/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |