Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP12-0108

Parcel: 14002002C

Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP12-0108

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
05/30/2019 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
05/30/2019 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
11/07/2013 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 -
11/07/2013 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 - COMPLETE FENCE INSTALLATION AND ROCK RIP RAP CONSTRUCTION ALONG THE WEST DRAINAGE, CALL FOR FINAL GRADING INSPECTION
10/28/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - TRASH ENCLOSURE OK PER PLANS, DOES NOT MEET COT DEVELOPMENT STDS.
10/25/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - Inspected trash enclosure construction, ok for final.
10/23/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) PER APPROVED CIVIL PLANS ON SITE PAGE C-2 NOTE #14 TRASH ENCLOSURE MUST COMPLY WITH COT DEV. STD 6-01.0 AND BE MODIFIED PER DIMENSIONS SHOWN ON THE PLANS: CLEAR WIDTH PER STD IS 10' CLEAR WIDTH PER CIVIL PLANS IS 8'. 2) THE CONTRACTOR BUILT THE ENCLOSURE WITH A CLEAR WIDTH OF 8' 3) TRASH ENCLOSURE ON SITE DOES NOT MEET THE COT DEV STD 6-01.0 FOR INTERIOR CLEAR WIDTH. 4) ENCLOSURE WAS APPROVED BY LOREN MANKUS, ENG. REVIEWER, COT PLANNING AND DEV. SERVICES DEPT.
10/09/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) WILL INSPECT CONCRETE HEADER INSTALL AT OUTLET OF RET/DET BASIN 2) WILL INSPECT INSTALL OF ROCK RIP RAP SHOWN ON APPROVED PLAN 3) WILL INSPECT INSTALL OF TRASH ENCLOSURE 4) WILL INSPECT LANDSCAPING PER PLAN. 5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
09/27/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) NO PRE-CON CALLED IN. MET WITH SUPERINTENDENT. JOB ABOUT 50% COMPLETED. 2) JOB CONSITS OF A PARKING LOT AND STORAGE YARD W/ A RET/DET BASIN ALONG THE WEST SIDE. 3) SOME WATER HARVESTING AREAS WILL BE INSTALLED. 4) AN NOI IS ON SITE AND SHOULD BE POSTED AT THE ENTRANCE. 5) A STABILIZED CONSTRUCTION ENTRANCE IS IN PLACE AND SEDIMENT CONTROLS HAVE BEEN ONSTALLED ALONG THE WEST PERIMETER. 6) STORM WATER SELF INSPECTIONS ARE BEING PERFORMED AND DOCUMENTED. 7) A CONCRETE/MATERIALS WASH OUT MUST BE INSTALLED AND USED WHEN APPLICABLE. 8) CALL OUT FOR INSPECTION PRIOR TO POURING FOOTINGS FOR TRASH ENCLOSURE