Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/27/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) NO PRE-CON CALLED IN. MET WITH SUPERINTENDENT. JOB ABOUT 50% COMPLETED.
2) JOB CONSITS OF A PARKING LOT AND STORAGE YARD W/ A RET/DET BASIN ALONG THE WEST SIDE.
3) SOME WATER HARVESTING AREAS WILL BE INSTALLED.
4) AN NOI IS ON SITE AND SHOULD BE POSTED AT THE ENTRANCE.
5) A STABILIZED CONSTRUCTION ENTRANCE IS IN PLACE AND SEDIMENT CONTROLS HAVE BEEN ONSTALLED ALONG THE WEST PERIMETER.
6) STORM WATER SELF INSPECTIONS ARE BEING PERFORMED AND DOCUMENTED.
7) A CONCRETE/MATERIALS WASH OUT MUST BE INSTALLED AND USED WHEN APPLICABLE.
8) CALL OUT FOR INSPECTION PRIOR TO POURING FOOTINGS FOR TRASH ENCLOSURE |