Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
05/21/2012
Applicant:
Description:
PARKING LOT ADDITIONS

Permit Reviews

Permit Number - DP12-0072
Permit Status: Complete
Permit Description: PARKING LOT ADDITIONS
Start Date Submittal Complete Date Status  
05/21/2012 DEV PKG - OK TO SUBMIT 05/21/2012 COMPLETED Review Details
05/21/2012 SITE and/or GRADING 05/21/2012 COMPLETED Review Details
05/21/2012 SITE and/or GRADING 07/28/2012 COMPLETED Review Details
07/28/2012 RESUB - SITE/GRADING ALL 08/06/2012 COMPLETED Review Details
10/15/2012 REVISION - - 1ST 10/16/2012 COMPLETED Review Details
10/16/2012 REVISION - - 1ST 10/16/2012 COMPLETED Review Details
12/26/2013 REVISION - GRADING 02/07/2014 COMPLETED Review Details

Conditions

Permit Number - DP12-0072
Permit Status: Complete
Permit Description: PARKING LOT ADDITIONS
Date Description Comments
07/17/2012 The following 15 conditions apply to DP12-0072 & floodplain use permit T12OT00780:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at Planning & Development Services Department (PDSD), or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)Call for PDSD Engineering inspection of basin and any areas as identified by the Inspectors.3)A copy of stamped approved plan(s), floodplain use permit, other permit(s), NOI, AzPDES general permit, and reports shall be kept at site at all times, until final approval.4)Signatures from Operators must be on SWPPP (exhibit or report) at or before commencement of construction. All Operators shall be identified & have separate certification statements. Assure certifications are available on-site.5)Disturbance Limits shall be maintained and no disturbance outside of limits will be allowed. 6)Interim erosion and sediment controls shall be maintained per approved plans at downstream areas of disturbance limits. Interim control measures shall be placed within approved disturbance limits. Prior to Final Approval all temporary controls shall be removed and permanent controls shall be placed.7)Stabilized entrances shall be maintained at all active access entrances. Use of water trucks or other dust controls shall be utilized, and construction entrances shall be maintained to minimize sedimentation, dust issues, and tracking.8)Storage or placement of construction material, vehicle staging / stockpile area, and/or designated concrete washout locations shall not be located within or near basin area. 9)Any revisions to Plan must be reviewed by PDSD Engineering Engineer and may include discussion, details, or a revised plan. Call PDSD Engineering at 791-5550 to discuss any revisions.10)If construction is expected to last longer than expiration date of permit, contact PDSD to renew/extend Permit. If Final Inspection has not been completed before Permit expires, and permit has not been renewed, additional fees and reviews may be required. Requests for permit extensions may be submitted to Planning & Development Services Department (attn: Claudia Buford), prior to permit expiration date, for consideration of plan extension approval.11)For inspection purposes, post City of Tucson's "AZPDES - Posting Requirements" green sheet, or NOI at construction site entrance at beginning of construction activities & maintain this posted document throughout project construction.12)Operator shall report to ADEQ any noncompliance (including spills) which may endanger human health or the environment. Operator shall orally notify office listed below within 24 hours:Arizona Department of Environmental Quality1110 W. Washington, 5th floor (5515B-1)Phoenix, AZ 85007Office: 602-771-4466; Fax 602-771-450513)Receiving waters is the Tucson Arroyo.14)Permitee shall notify PDSD when operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage improvements, their permanent protective devices, & all erosion control measures have been completed in accordance with approved plan & permit, & all conditions of permit are completed. 15)As-builts are required to be submitted under activity number DP12-0072-R to PDSD permit clerks. They will be reviewed and then if acceptable, a copy will be provided to PDSD Engineering Inspector for final inspections. For Permit Project Closure documentation, submit: one copy of original plans, 2 copies of as-builts, letter of completion (sealed letter from EOR for substantial completion of overall project and statement regarding whether constructed basin meets drain down time). As-builts shall include: inverts for basin inlets and outlets, basin elevations, and general grades as determined by RLS to show substantial completion for project.
07/17/2012 The following 15 conditions apply to DP12-0072 & floodplain use permit T12OT00780:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at Planning & Development Services Department (PDSD), or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)Call for PDSD Engineering inspection of basin and any areas as identified by the Inspectors.3)A copy of stamped approved plan(s), floodplain use permit, other permit(s), NOI, AzPDES general permit, and reports shall be kept at site at all times, until final approval.4)Signatures from Operators must be on SWPPP (exhibit or report) at or before commencement of construction. All Operators shall be identified & have separate certification statements. Assure certifications are available on-site.5)Disturbance Limits shall be maintained and no disturbance outside of limits will be allowed. 6)Interim erosion and sediment controls shall be maintained per approved plans at downstream areas of disturbance limits. Interim control measures shall be placed within approved disturbance limits. Prior to Final Approval all temporary controls shall be removed and permanent controls shall be placed.7)Stabilized entrances shall be maintained at all active access entrances. Use of water trucks or other dust controls shall be utilized, and construction entrances shall be maintained to minimize sedimentation, dust issues, and tracking.8)Storage or placement of construction material, vehicle staging / stockpile area, and/or designated concrete washout locations shall not be located within or near basin area. 9)Any revisions to Plan must be reviewed by PDSD Engineering Engineer and may include discussion, details, or a revised plan. Call PDSD Engineering at 791-5550 to discuss any revisions.10)If construction is expected to last longer than expiration date of permit, contact PDSD to renew/extend Permit. If Final Inspection has not been completed before Permit expires, and permit has not been renewed, additional fees and reviews may be required. Requests for permit extensions may be submitted to Planning & Development Services Department (attn: Claudia Buford), prior to permit expiration date, for consideration of plan extension approval.11)For inspection purposes, post City of Tucson's "AZPDES - Posting Requirements" green sheet, or NOI at construction site entrance at beginning of construction activities & maintain this posted document throughout project construction.12)Operator shall report to ADEQ any noncompliance (including spills) which may endanger human health or the environment. Operator shall orally notify office listed below within 24 hours:Arizona Department of Environmental Quality1110 W. Washington, 5th floor (5515B-1)Phoenix, AZ 85007Office: 602-771-4466; Fax 602-771-450513)Receiving waters is the Tucson Arroyo.14)Permitee shall notify PDSD when operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage improvements, their permanent protective devices, & all erosion control measures have been completed in accordance with approved plan & permit, & all conditions of permit are completed. 15)As-builts are required to be submitted under activity number DP12-0072-R to PDSD permit clerks. They will be reviewed and then if acceptable, a copy will be provided to PDSD Engineering Inspector for final inspections. For Permit Project Closure documentation, submit: one copy of original plans, 2 copies of as-builts, letter of completion (sealed letter from EOR for substantial completion of overall project and statement regarding whether constructed basin meets drain down time). As-builts shall include: inverts for basin inlets and outlets, basin elevations, and general grades as determined by RLS to show substantial completion for project.

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0072
Permit Description: PARKING LOT ADDITIONS
Total Completed Inspections - 7
Date Description Inspector Results Comments
08/13/2012 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/13/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER OF THE SITE, PER THE APPROVED STORM WATER PLAN.
2) THE CONTRACTOR HAS ROUGH GRADED THE SITE, NO NPPO REQUIREMENTS.
3) ENSURE CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION.
4) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS MORE ROUTINELY.
5) INSTALL A CONCRETE WASH OUT AS SOON AS PRACTICABLE.
6) POST A COPY OF YOU NOI AT THE ENTRANCE TO THE SITE.

KRISTEN 617-4480 - SQP CONSTRUCTION}
10/19/2012 SITE - Stormwater Follow-up Passed {Activity date: 10/19/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE MAJORITY OF PAVING IS COMPLETE
2) SOME LANDSCAPING COMPLETE
3) ALL SIDEWALKS IN
4) ENSURE APPROVED PLAN REFLECTS CHANGES MADE TO ORIGINAL DRAWING
5) PROVIDE CERT FROM ENG OF RECORD
6) FILE NOT WITH THE STATE OF AZ} ; {Activity date: 10/09/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS ARE IN PLACE.
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION.
3) INSTALL A CONCRETE WASH OUT AS SOON AS POSSIBLE.
4) TRACKING OF SOIL ON ADJACENT ROADWAY IS A CONCERN.
ADD SILT SOCK ON THE UPSTEAM SIDE OF THE EXISTING CATCH BASIN IN THE CURB LINE. SWEEP UP SOIL ON A ROUTINE BASIS. RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE.

CALL FOR RE-INSPECTION WHEN COMPLETED.} ; {Activity date: 09/19/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE TRACKED SOIL IS SWEPT UP OFF ADJACENT ROADWAY.
2) MAKE SURE SIGNIFICANT CHANGES TO THE ORIGINAL GRADING/SITE PLANARE DOCUMENTED AND APPROVED.
3) MAINTAIN SEDIMENTCONTROLS (SILT FENCE) AS LONG AS ITS IN PLACE - CAN REMOVE WHEN PAVING IS COMPLETE.
4) NO OTHER CONCERNS AT THIS TIME.} ; {Activity date: 09/05/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND OR CONCERNS AT THIS} ; {Activity date: 08/22/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) TRACKING ALONG ADJACENT STREET HAS BEEN SWEPT AND SEDIMENT CONTROLS HAVE BEEN PLACED IN FRONT OF THE EXISTING CATCH BASIN.
2) SITE HAS BEEN ROUGH GRADED, PAVING WILL BEGIN SOON.

NO OTHER SIGNIFICANT CONCERNS AT THIS TIME.} ; {Activity date: 08/16/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS ARE IN PLACE.
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION.
3) INSTALL A CONCRETE WASH OUT AS SOON AS POSSIBLE.
4) TRACKING OF SOIL ON ADJACENT ROADWAY IS A CONCERN.
ADD SILT SOCK ON THE UPSTEAM SIDE OF THE EXISTING CATCH BASIN IN THE CURB LINE. SWEEP UP SOIL ON A ROUTINE BASIS. RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE.

CALL FOR RE-INSPECTION WHEN COMPLETED.}
10/19/2012 SITE - Stormwater Setup and Controls Passed {Activity date: 10/19/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
10/29/2012 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/29/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - DO NOT HAVE JURISDICTION TO INSPECT LANDSCAPING ACCORDING TO PIMA COLLEGE AND MY SUPERVISORS.} ; {Activity date: 10/19/2012; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE MAJORITY OF PAVING IS COMPLETE
2) SOME LANDSCAPING COMPLETE
3) ALL SIDEWALKS IN
4) ENSURE APPROVED PLAN REFLECTS CHANGES MADE TO ORIGINAL DRAWING
5) PROVIDE CERT FROM ENG OF RECORD
6) FILE NOT WITH THE STATE OF AZ}
12/05/2012 SITE - Stormwater Final Inspection Passed {Activity date: 12/05/2012; Status: Approved; Inspector: RUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 11/26/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE APPEARS TO BE COMPLETED, EXCEPT FOR STABILIZATION OF THE RET/DET BAS.
NO FINAL INSPECTION CALLED IN.} ; {Activity date: 10/19/2012; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE MAJORITY OF PAVING IS COMPLETE
2) SOME LANDSCAPING COMPLETE
3) ALL SIDEWALKS IN
4) ENSURE APPROVED PLAN REFLECTS CHANGES MADE TO ORIGINAL DRAWING
5) PROVIDE CERT FROM ENG OF RECORD
6) FILE NOT WITH THE STATE OF AZ}
01/24/2014 ENGR Engineering Final Passed {Activity date: 01/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RETENTION/DETENTION BASIN HAS BEEN CONSTRUCTED PER THE APPROVED PLAN
NO OTHER SITE/GRADING WORK INPECTIONS AUTHORIZED} ; {Activity date: 01/28/2013; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR DID NOT CONTACT PDSD FOR FINAL INSPECTION
2) NO AS-BUILT DRAWING WAS GIVEN FOR VERIFICATION} ; {Activity date: 12/05/2012; Status: Continued; Inspector: RUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 11/26/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE APPEARS TO BE COMPLETED, EXCEPT FOR STABILIZATION OF THE RET/DET BAS.
NO FINAL INSPECTION CALLED IN.} ; {Activity date: 10/29/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - OWNER OF PROPERTY, PIMA COLLEGE STATED THAT THE CITY OF TUCSON HAS LIMITED JURISDICTION AS FAR INSPECTIONS OF CONSTRUCTION PROJECTS.
I WILL ONLY BE INSPECTING THE CONSTRUCTION OF THE RET/DET BASIN.
BASIN IS NOT COMPLETED .} ; {Activity date: 10/23/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NOT READY FOR FINAL, MOST SITE WORK COMPLETED} ; {Activity date: 10/19/2012; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE MAJORITY OF PAVING IS COMPLETE
2) SOME LANDSCAPING COMPLETE
3) ALL SIDEWALKS IN
4) ENSURE APPROVED PLAN REFLECTS CHANGES MADE TO ORIGINAL DRAWING
5) PROVIDE CERT FROM ENG OF RECORD
6) FILE NOT WITH THE STATE OF AZ}
01/24/2014 ENGR Grading Final Passed {Activity date: 01/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by ARUIZ1 - RETENTION/DETENTION BASIN HAS BEEN CONSTRUCTED PER THE APPROVED PLAN
NO OTHER SITE/GRADING WORK INPECTIONS AUTHORIZED
PER GRADING FINAL}

Documents

File Name Document Type  
001_COVER SHEET_G-001.TIF DEVPLANS VIEW
002_GENERAL INFO_G-101.TIF DEVPLANS VIEW
003_COVER SHEET & EXISTING CONDITIONS_ 1 OF 2.TIF DEVPLANS VIEW
004_SITE PLAN_2 OF 2.TIF DEVPLANS VIEW
005_SURVEY_C-100.TIF DEVPLANS VIEW
006_DEMOLITION PLAN_C-101.TIF DEVPLANS VIEW
007_HORIZONTAL CONTROL PLAN_C-102.TIF DEVPLANS VIEW
008_GRADING&PAVING PLAN_C-103.TIF DEVPLANS VIEW
009_SITE DETAILS_C-104.TIF DEVPLANS VIEW
010_GRADING&PAVING DETAILS_C-105.TIF DEVPLANS VIEW
001_AS BUILTS_1 OF 1.TIF DEVPLANS VIEW
None DOCUMENTS VIEW