Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/13/2012 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER OF THE SITE, PER THE APPROVED STORM WATER PLAN.
2) THE CONTRACTOR HAS ROUGH GRADED THE SITE, NO NPPO REQUIREMENTS.
3) ENSURE CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION.
4) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS MORE ROUTINELY.
5) INSTALL A CONCRETE WASH OUT AS SOON AS PRACTICABLE.
6) POST A COPY OF YOU NOI AT THE ENTRANCE TO THE SITE.
KRISTEN 617-4480 - SQP CONSTRUCTION |