Permit: DP12-0066
Permit Details
Apply Date:
05/07/2012
Applicant:
Anthony Capps
Description:
BURGER KING
Permit Reviews
Permit Number - DP12-0066
Permit Status: Complete
Permit Description: BURGER KING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/07/2012 | DEV PKG - OK TO SUBMIT | 05/14/2012 | COMPLETED |
05/14/2012 | SITE and/or GRADING | 07/27/2012 | COMPLETED |
07/27/2012 | RESUB - SITE and/or GRADING | 08/17/2012 | COMPLETED |
08/17/2012 | RESUB - SITE and/or GRADING | 08/28/2012 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0066
Permit Description: BURGER KING
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/05/2012 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/05/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) this site is not required to have a storm water permt, however the contractor must comply with the city of tucson's storm water permit by keeping disturbed soil on site and out of storm drains. 2) call for inspection for any changes and/or concerns with the approved grading and landscape plan. 3) may need to add supplemental sediment controls at a later time, (rock entrance, silt sock at catch basin....).} |
|
11/02/2012 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/02/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE SPECIFIC SEDIMENT CONTROLS HAVE BEEN INBSTALLED AND APPROVED} | |
12/17/2012 | SITE - Stormwater Follow-up | Passed | {Activity date: 12/17/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE PAVED} ; {Activity date: 12/12/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE BEING PAVED TODAY NO CHANGES AND/OR COCNERNS AT THIS TIME NO STORM WATER CONCERNS} ; {Activity date: 12/11/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME SITE PAVING BEING DONE WILL CHECK NXT WEEK} ; {Activity date: 11/16/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SOME SITE WORK BEING DONE. 2) CURB CUTS FOR SURFACE DRAINAGE, SCUPPERS FOR ROOF DRAINS, AND WATER HARVESTING AREA'S FOR INFILTRATION AND LANDSCAPING. 3) NO GRADING CONCERNS AT THIS TIME. PAVING IN TWO WEEKS. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.} ; {Activity date: 11/02/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SITE WORK BEING DONE YET 2) NO STORM WATER CONCERNS AT THIS TIME 3) TRASH ENCLOSURE HAS BEEN CONSTRUCTED} ; {Activity date: 10/31/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORMWATER CONCERNS AT THIS TIME. 2) CONTRACTOR INSTALLING UTILITIES AND BLDG PAD. NO SITE WORK AT THIS TIME} ; {Activity date: 09/19/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/11/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. 2) GRADING FOR BLDG PAD AT THIS TIME.} ; {Activity date: 09/10/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.} |
|
12/17/2012 | ENGR Grading Final | Passed | {Activity date: 12/17/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 12/13/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PAVING TAKING PLACE, NO CHANGES OR CONCERNS AT THIS TIME} ; {Activity date: 12/12/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE BEING PAVED TODAY NO CHANGES AND/OR COCNERNS AT THIS TIME NO STORM WATER CONCERNS} ; {Activity date: 12/11/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME SITE PAVING BEING DONE WILL CHECK NXT WEEK} ; {Activity date: 11/27/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONCERNS AND OR CHANGES} ; {Activity date: 11/16/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SOME SITE WORK BEING DONE. 2) CURB CUTS FOR SURFACE DRAINAGE, SCUPPERS FOR ROOF DRAINS, AND WATER HARVESTING AREA'S FOR INFILTRATION AND LANDSCAPING. 3) NO GRADING CONCERNS AT THIS TIME. PAVING IN TWO WEEKS. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.} ; {Activity date: 11/15/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/31/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORMWATER CONCERNS AT THIS TIME. 2) CONTRACTOR INSTALLING UTILITIES AND BLDG PAD. NO SITE WORK AT THIS TIME} ; {Activity date: 09/19/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - REBAR PLACED PER APPROVED PLANS AND DEV STD 6 -01.0 FOR THE TRASH ENCLOSURE. TWO #4 IN BOTTOM AND ONE VERT @ 32" ON CENTER.} ; {Activity date: 09/11/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. 2) GRADING FOR BLDG PAD AT THIS TIME.} |
|
12/17/2012 | SITE - Stormwater Final Inspection | Passed | {Activity date: 12/17/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
12/19/2012 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/19/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 12/17/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LANDSCAPING NOT COMPLETED PER PLAN} | |
12/19/2012 | ENGR Engineering Final | Passed | {Activity date: 12/19/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 12/17/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE ALL SITE WORK PER APPROVED PLAN} |