Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 8702 E BROADWAY BL
Search
Historic Records Requests
Address: 8702 E BROADWAY BL
Date - 11/28/2024 10:43 a.m.
Total Number Of Historic Records Requests - (1)
Name | Action |
---|---|
Address: 8702 E BROADWAY BL - Doc Type: CERT OF OCC |
Annexations & Original City Zoning (OCZ)
Address: 8702 E BROADWAY BL
Date - 11/28/2024 10:43 a.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 11/28/2024 10:43 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-07-06 | Safeway - Broadway Boulevard | C-2 | Withdrawn | 02/22/2007 |
Permits
Address: 8702 E BROADWAY BL
Date - 11/28/2024 10:43 a.m.
Total Number Of Permits - (26)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
D06-0054 | Approved | 11/17/2006 | N/A | Development Package | SAFEWAY 234 FUEL STATION | |
T22RW02261 | Complete | 06/21/2022 | 10/09/2022 | Right-of-Way (ROW) | PALM & TREE CARE ON COT MEDIAN ISLANDS - STREET ARTERIALS & COLLECTORS - MEDIAN ADJACENT LANES CLOSU | |
DP12-0066 | Complete | 05/07/2012 | 06/17/2013 | Development Package | BURGER KING | |
T02BU02234 | FINAL | 08/13/2002 | 03/29/2003 | TANKS | INSTALL:1000 GALLON PROPANE TANK | |
T06AN01068 | ISSUED | 10/18/2006 | N/A | ADDRNEW | ||
T06BU02503 | WITHDRWN | 10/18/2006 | N/A | GRADING | GRADING | |
T06CM05515 | WITHDRWN | 10/18/2006 | N/A | COMBO | BUILD NEW FUEL STATION AND CANOPY | |
T08BU00549 | FINAL | 03/21/2008 | 02/16/2009 | TANKS | REMOVAL OF UNDERGROUND TANK | |
T12BU00958 | FINAL | 08/13/2012 | 02/23/2013 | DEMO | DEMO COMMERCIAL BUILDING | |
T12BU01457 | FINAL | 12/12/2012 | 06/12/2013 | BUILD | FIRE HOOD | |
T12CM03758 | C OF O | 06/25/2012 | 06/17/2013 | COMBO | NEW: RESTAURANT | |
T12CM04706 | FINAL | 08/01/2012 | 02/03/2013 | COMBO | TEMP POWER POLE | |
T12EX00524 | CLOSED | 09/28/2012 | 11/27/2012 | EXCAV | INSTALLING OFF SITE IMPROVEMENTS PER DP12-0066. IMPROVEMENTS CONSIST OF 5' SIDWALK ALONG THE PROP FRONTAGE OF CAMIN SECO AND BROADWAY. 25' WIDE DRIVEWAY ENTRANCES WITH CURB RETURNS AND CURB ACCESS RAMPS. | |
T12EX00576 | CLOSED | 10/25/2012 | 12/24/2012 | EXCAV | MODIFY CATCH BASIN ON CAMINO SECO PER JAS ENGINEERING DRAWINGS (CAMINO SECO/BROADWAY RIGHT OF WAY PERMIT) | |
T12OT01578 | FINAL | 11/21/2012 | 10/28/2013 | SIGN | 4- ILLUM WALL / 2- ILLUM DF /2- DD/ 2- MENU 20869 | |
T12OT01648 | EXPIRED | 12/10/2012 | 09/10/2013 | SIGN | 90 DAY BANNER 12/11/12 TO 3/10/13 | |
T12OT01649 | FINAL | 12/10/2012 | 09/10/2013 | SIGN | 90 DAY BANNER 12/11/12 TO 3/10/13 | |
T13OT00207 | FINAL | 02/19/2013 | 10/28/2013 | SIGN | SIGN | |
T17FO00225 | VOID | 03/13/2017 | N/A | FIREOPER | CO2 BEVERAGE DISPENSING | |
T17FO00226 | FINAL | 03/13/2017 | 06/23/2018 | FIREOPER | PLACES OF ASSEMBLY (76) | |
T18FO00136 | FINAL | 01/31/2018 | 03/08/2019 | FIREOPER | CO2 alarm | |
T18FO00543 | FINAL | 07/06/2018 | 10/11/2022 | FIREOPER | Places of Assembly - Occ Load 76 | |
T21RW00026 | FINAL | 01/05/2021 | 02/04/2021 | ROW | (2) 5x5 bellholes in dirt/blktop front------to repair/replace/pothole gas line crews on site now | |
T21RW04057 | FINAL | 08/31/2021 | 10/22/2021 | ROW | LANDSCAPE MAINTENANCE SERVICES FOR MEDIANS & ROADSIDES CONTACT NO. 212536 P.O. No. 42376 PALM & TREE CARE ON MEDIAN ISLANDS ALONG CAMINO SECO BETWEEN BROADWAY BL TO 22ND ST. ROLLING SET UP WITH MINIMUM RESTRICTIONS ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T98EL02247 | FINAL | 12/16/1998 | 08/03/1999 | ELECT | UPGRADE:ELECTRIC 200AMP TO 400AMP | |
T98PL02496 | FINAL | 12/23/1998 | 06/22/1999 | PLUMB | WATER HEATER & WATER LINE:NEW |
Plans
Address: 8702 E BROADWAY BL
Date - 11/28/2024 10:43 a.m.
Total Number Of Plans - (2)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CWH-12-0066 | Active | 05/07/2012 | 06/17/2013 | -- Commercial Water Harvesting Ordinance | BURGER KING | |
C9-07-06 | WITHDRWN | 02/22/2007 | N/A | REZONING PROCEDURES -- REZONE | The preliminary development plan dated February 16, 2007 proposes expansion of the existing use to include four additional fueling stations for a total of 16 gas pumps, a 650 square foot retail/convenience kiosk and a 5,418 square foot shade canopy for the fueling stations. |