Permit: DP12-0053
Permit Details
Apply Date:
04/17/2012
Applicant:
Description:
3RD STREET DEVELOPMENT
Permit Reviews
Permit Number - DP12-0053
Permit Status: Complete
Permit Description: 3RD STREET DEVELOPMENT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/17/2012 | DEV PKG - OK TO SUBMIT | 04/18/2012 | COMPLETED |
| 04/18/2012 | DEV PKG | 06/20/2012 | COMPLETED |
| 06/20/2012 | DEV PKG - RESUBMITTAL | 10/24/2012 | COMPLETED |
| 10/24/2012 | DEV PKG - RESUBMITTAL | 12/06/2012 | COMPLETED |
| 12/06/2012 | DEV PKG - RESUBMITTAL | 12/18/2012 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0053
Permit Description: 3RD STREET DEVELOPMENT
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2013 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 02/26/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS < 1 AC, SWPPP AND STORM WATER PERMIT NOT REQUIRED. HOWEVER, DISTURBED SOIL MUST REMAIN ON SITE. 2) INSTALL SEDIMENT CONTROLS ACCROSS N. SIDE, CALL FOR RE-INSPECTION 3) SWEEP UP ANY TRACKED SOIL OFF OF 3RD STREET AS NEEDED. 4) ENSURE YOU PROTECT/COVER ANY EXCAVATION TRENCHING AND SEPARATE FROM PUBLIC ACCESS } ; {Activity date: 01/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY AT THIS TIME} ; {Activity date: 01/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 01/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN DEMO'D AND PREPARED FOR CONSTRUCTION. TEP ON SITE. NO CONSTRUCTION AS OF TODAY.} |
|
| 03/12/2013 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/12/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE FRONT OF THE SITE 2) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED} ; {Activity date: 02/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS < 1 AC, SWPPP AND STORM WATER PERMIT NOT REQUIRED. HOWEVER, DISTURBED SOIL MUST REMAIN ON SITE. 2) INSTALL SEDIMENT CONTROLS ACCROSS N. SIDE, CALL FOR RE-INSPECTION 3) SWEEP UP ANY TRACKED SOIL OFF OF 3RD STREET AS NEEDED. 4) ENSURE YOU PROTECT/COVER ANY EXCAVATION TRENCHING AND SEPARATE FROM PUBLIC ACCESS } ; {Activity date: 02/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) TRACKING OF SOIL ONTO 3RD ST, A STABILIZED CONSTRUCTION ENTRANCE/EXIT IS NEEDED. 2) MAY NEED PERIMETER CONTROLS ALONG THE NORTH END OF THE SITE. 3) NO PRE-CON CALLED IN AND WORK HAS STARTED} ; {Activity date: 01/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE IS LESS THAN 1 ACRE, THEREFORE A STORM WATER PERMIT AND PLAN IS NOT REQUIRED. HOWEVER, SEDIMENT CONTROLS MAY BE NEEDED TO KEEP SOIL ON SITE DURING CONSTRUCTION} |
|
| 09/24/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES OR CONCERNS AT THIS TIME} ; {Activity date: 01/31/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/23/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SITE CHANGES OR CONCERNS. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE NOT BUILT OUT, CONSTRUCTION OF RESIDENTIAL HOUING TAKING PLACE. NO CHANGES AND/OR SITE WORK AT THIS TIME.} ; {Activity date: 12/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTORS BLDG HOUSES ON LOTS 2) GRADING PERMIT NOT FINALED 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/05/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER/SITE CONCERNS AT THIS TIME} ; {Activity date: 10/04/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PERIMETER WALL IN PLACE, CURB AND ROADWAY INSTALLED. RET/DET BASINS COMPLETE. HOWEVER BLDG LOTS ARE STILL DIRT.} ; {Activity date: 08/14/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/12/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY ON SITE ROADWAYS, CURB AND BLDG PADS ARE COMPLETED. CONTRACTOR HAS NOT STARTED ON HOLMES} ; {Activity date: 06/07/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SMALL SUBDIVISION, NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 05/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION SWEEP UP SOIL OFF ADJACENT ROADWAY CONTRACTOR WORKING ON BLDG PADS AND CUTTING ROADWAY} ; {Activity date: 04/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORMWATER/SITE CONCERNS AT THIS TIME} |
|
| 09/24/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/31/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/04/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PERIMETER WALL IN PLACE, CURB AND ROADWAY INSTALLED. RET/DET BASINS COMPLETE. HOWEVER BLDG LOTS ARE STILL DIRT. STABILIZED THE ENTIRE DISTURBED AREA OF SITE, CALL FOR RE-INSPECTION} | |
| 10/21/2014 | ENGR Engineering Final | Passed | {Activity date: 10/21/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/10/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING PAPER WORK} ; {Activity date: 09/24/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL BIKE PARKING PER PLAN 2) INSTALL TRASH ENCLOSURE GATES 3) HAVE ENG OF RECORD APPROVE ADDITION OF SCUPPERS AND DRAINAGE CHANGE} ; {Activity date: 07/31/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND NO INSPECTION CALLED IN} ; {Activity date: 06/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS} ; {Activity date: 02/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AT THIS TIME} ; {Activity date: 10/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE ALL SITE WORK SHOWN ON THE APPROVED SITE/GRADING PLAN, CALL FOR RE-INSPECTION} |
|
| 06/26/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/26/2019 | SITE - SWPPP Correction Notice | Passed | {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/26/2019 | ENGR Grading Final | Passed | {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/26/2019 | SITE - SWPPP Violation Notice | Passed | {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |