Permit Details

Status:
Complete
Type:
Development Package
Address:
3830 E 3RD ST
Address NEW:
3830 E 3RD ST
Apply Date:
04/17/2012
Applicant:
Description:
3RD STREET DEVELOPMENT

Permit Reviews

Permit Number - DP12-0053
Permit Status: Complete
Permit Description: 3RD STREET DEVELOPMENT
Start Date Submittal Complete Date Status  
04/17/2012 DEV PKG - OK TO SUBMIT 04/18/2012 COMPLETED Review Details
04/18/2012 DEV PKG 06/20/2012 COMPLETED Review Details
06/20/2012 DEV PKG - RESUBMITTAL 10/24/2012 COMPLETED Review Details
10/24/2012 DEV PKG - RESUBMITTAL 12/06/2012 COMPLETED Review Details
12/06/2012 DEV PKG - RESUBMITTAL 12/18/2012 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0053
Permit Description: 3RD STREET DEVELOPMENT
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/26/2013 COT - ENGR - Site - Assurance Release Passed {Activity date: 02/26/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS < 1 AC, SWPPP AND STORM WATER PERMIT NOT REQUIRED. HOWEVER, DISTURBED SOIL MUST REMAIN ON SITE.
2) INSTALL SEDIMENT CONTROLS ACCROSS N. SIDE, CALL FOR RE-INSPECTION
3) SWEEP UP ANY TRACKED SOIL OFF OF 3RD STREET AS NEEDED.
4) ENSURE YOU PROTECT/COVER ANY EXCAVATION TRENCHING AND SEPARATE FROM PUBLIC ACCESS
} ; {Activity date: 01/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY AT THIS TIME} ; {Activity date: 01/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 01/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN DEMO'D AND PREPARED FOR CONSTRUCTION. TEP ON SITE. NO CONSTRUCTION AS OF TODAY.}
03/12/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 03/12/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE FRONT OF THE SITE
2) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED} ; {Activity date: 02/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS < 1 AC, SWPPP AND STORM WATER PERMIT NOT REQUIRED. HOWEVER, DISTURBED SOIL MUST REMAIN ON SITE.
2) INSTALL SEDIMENT CONTROLS ACCROSS N. SIDE, CALL FOR RE-INSPECTION
3) SWEEP UP ANY TRACKED SOIL OFF OF 3RD STREET AS NEEDED.
4) ENSURE YOU PROTECT/COVER ANY EXCAVATION TRENCHING AND SEPARATE FROM PUBLIC ACCESS
} ; {Activity date: 02/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) TRACKING OF SOIL ONTO 3RD ST, A STABILIZED CONSTRUCTION ENTRANCE/EXIT IS NEEDED.
2) MAY NEED PERIMETER CONTROLS ALONG THE NORTH END OF THE SITE.
3) NO PRE-CON CALLED IN AND WORK HAS STARTED} ; {Activity date: 01/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE IS LESS THAN 1 ACRE, THEREFORE A STORM WATER PERMIT AND PLAN IS NOT REQUIRED. HOWEVER, SEDIMENT CONTROLS MAY BE NEEDED TO KEEP SOIL ON SITE DURING CONSTRUCTION}
09/24/2014 SITE - Stormwater Follow-up Passed {Activity date: 09/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES OR CONCERNS AT THIS TIME} ; {Activity date: 01/31/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/23/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SITE CHANGES OR CONCERNS.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE NOT BUILT OUT, CONSTRUCTION OF RESIDENTIAL HOUING TAKING PLACE. NO CHANGES AND/OR SITE WORK AT THIS TIME.} ; {Activity date: 12/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTORS BLDG HOUSES ON LOTS
2) GRADING PERMIT NOT FINALED
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/05/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER/SITE CONCERNS AT THIS TIME} ; {Activity date: 10/04/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PERIMETER WALL IN PLACE, CURB AND ROADWAY INSTALLED. RET/DET BASINS COMPLETE. HOWEVER BLDG LOTS ARE STILL DIRT.} ; {Activity date: 08/14/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/12/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY ON SITE
ROADWAYS, CURB AND BLDG PADS ARE COMPLETED.
CONTRACTOR HAS NOT STARTED ON HOLMES} ; {Activity date: 06/07/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SMALL SUBDIVISION, NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 05/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION
SWEEP UP SOIL OFF ADJACENT ROADWAY
CONTRACTOR WORKING ON BLDG PADS AND CUTTING ROADWAY} ; {Activity date: 04/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORMWATER/SITE CONCERNS AT THIS TIME}
09/24/2014 SITE - Stormwater Final Inspection Passed {Activity date: 09/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/31/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/04/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PERIMETER WALL IN PLACE, CURB AND ROADWAY INSTALLED. RET/DET BASINS COMPLETE. HOWEVER BLDG LOTS ARE STILL DIRT. STABILIZED THE ENTIRE DISTURBED AREA OF SITE, CALL FOR RE-INSPECTION}
10/21/2014 ENGR Engineering Final Passed {Activity date: 10/21/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/10/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING PAPER WORK} ; {Activity date: 09/24/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL BIKE PARKING PER PLAN
2) INSTALL TRASH ENCLOSURE GATES
3) HAVE ENG OF RECORD APPROVE ADDITION OF SCUPPERS AND DRAINAGE CHANGE} ; {Activity date: 07/31/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND NO INSPECTION CALLED IN} ; {Activity date: 06/04/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS} ; {Activity date: 02/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AT THIS TIME} ; {Activity date: 10/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE ALL SITE WORK SHOWN ON THE APPROVED SITE/GRADING PLAN, CALL FOR RE-INSPECTION}
06/26/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
06/26/2019 SITE - SWPPP Correction Notice Passed {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
06/26/2019 ENGR Grading Final Passed {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
06/26/2019 SITE - SWPPP Violation Notice Passed {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
None DOCUMENTS VIEW
001_SHEET 1 OF 10.TIF GRADING PLANS VIEW
002_SHEET 2 OF 10.TIF GRADING PLANS VIEW
003_SHEET 3 OF 10.TIF GRADING PLANS VIEW
004_SHEET 4 OF 10.TIF GRADING PLANS VIEW
005_SHEET 5 OF 10.TIF GRADING PLANS VIEW
006_SHEET 6 OF 10.TIF GRADING PLANS VIEW
007_SHEET 7 OF 10.TIF GRADING PLANS VIEW
008_L-8.TIF GRADING PLANS VIEW
009_L-9.TIF GRADING PLANS VIEW
010_L-10.TIF GRADING PLANS VIEW