Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP12-0053

Parcel: Unknown


Addresses:

3830 E 3RD ST


Inspection Status: Passed

Inspection History: SITE - Stormwater Setup and Controls

Permit Number - DP12-0053

Inspection Description - SITE - Stormwater Setup and Controls

Inspection Status - Passed

Date Description Inspector Results Comments
03/12/2013 SITE - Stormwater Setup and Controls MRUSSO Approved Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE FRONT OF THE SITE 2) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED
02/26/2013 SITE - Stormwater Setup and Controls MRUSSO Continued Entered by DROBERT5 - 1) SITE IS < 1 AC, SWPPP AND STORM WATER PERMIT NOT REQUIRED. HOWEVER, DISTURBED SOIL MUST REMAIN ON SITE. 2) INSTALL SEDIMENT CONTROLS ACCROSS N. SIDE, CALL FOR RE-INSPECTION 3) SWEEP UP ANY TRACKED SOIL OFF OF 3RD STREET AS NEEDED. 4) ENSURE YOU PROTECT/COVER ANY EXCAVATION TRENCHING AND SEPARATE FROM PUBLIC ACCESS
02/22/2013 SITE - Stormwater Setup and Controls MRUSSO Continued Entered by DROBERT5 - 1) TRACKING OF SOIL ONTO 3RD ST, A STABILIZED CONSTRUCTION ENTRANCE/EXIT IS NEEDED. 2) MAY NEED PERIMETER CONTROLS ALONG THE NORTH END OF THE SITE. 3) NO PRE-CON CALLED IN AND WORK HAS STARTED
01/08/2013 SITE - Stormwater Setup and Controls MRUSSO Continued Entered by DROBERT5 - SITE IS LESS THAN 1 ACRE, THEREFORE A STORM WATER PERMIT AND PLAN IS NOT REQUIRED. HOWEVER, SEDIMENT CONTROLS MAY BE NEEDED TO KEEP SOIL ON SITE DURING CONSTRUCTION