Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 03/12/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE FRONT OF THE SITE
2) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED |
| 02/26/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SITE IS < 1 AC, SWPPP AND STORM WATER PERMIT NOT REQUIRED. HOWEVER, DISTURBED SOIL MUST REMAIN ON SITE.
2) INSTALL SEDIMENT CONTROLS ACCROSS N. SIDE, CALL FOR RE-INSPECTION
3) SWEEP UP ANY TRACKED SOIL OFF OF 3RD STREET AS NEEDED.
4) ENSURE YOU PROTECT/COVER ANY EXCAVATION TRENCHING AND SEPARATE FROM PUBLIC ACCESS
|
| 02/22/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) TRACKING OF SOIL ONTO 3RD ST, A STABILIZED CONSTRUCTION ENTRANCE/EXIT IS NEEDED.
2) MAY NEED PERIMETER CONTROLS ALONG THE NORTH END OF THE SITE.
3) NO PRE-CON CALLED IN AND WORK HAS STARTED |
| 01/08/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - SITE IS LESS THAN 1 ACRE, THEREFORE A STORM WATER PERMIT AND PLAN IS NOT REQUIRED. HOWEVER, SEDIMENT CONTROLS MAY BE NEEDED TO KEEP SOIL ON SITE DURING CONSTRUCTION |