Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP12-0053
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2013 | SITE - Stormwater Setup and Controls | MRUSSO | Approved | Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE FRONT OF THE SITE 2) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED |
| 02/26/2013 | SITE - Stormwater Setup and Controls | MRUSSO | Continued | Entered by DROBERT5 - 1) SITE IS < 1 AC, SWPPP AND STORM WATER PERMIT NOT REQUIRED. HOWEVER, DISTURBED SOIL MUST REMAIN ON SITE. 2) INSTALL SEDIMENT CONTROLS ACCROSS N. SIDE, CALL FOR RE-INSPECTION 3) SWEEP UP ANY TRACKED SOIL OFF OF 3RD STREET AS NEEDED. 4) ENSURE YOU PROTECT/COVER ANY EXCAVATION TRENCHING AND SEPARATE FROM PUBLIC ACCESS |
| 02/22/2013 | SITE - Stormwater Setup and Controls | MRUSSO | Continued | Entered by DROBERT5 - 1) TRACKING OF SOIL ONTO 3RD ST, A STABILIZED CONSTRUCTION ENTRANCE/EXIT IS NEEDED. 2) MAY NEED PERIMETER CONTROLS ALONG THE NORTH END OF THE SITE. 3) NO PRE-CON CALLED IN AND WORK HAS STARTED |
| 01/08/2013 | SITE - Stormwater Setup and Controls | MRUSSO | Continued | Entered by DROBERT5 - SITE IS LESS THAN 1 ACRE, THEREFORE A STORM WATER PERMIT AND PLAN IS NOT REQUIRED. HOWEVER, SEDIMENT CONTROLS MAY BE NEEDED TO KEEP SOIL ON SITE DURING CONSTRUCTION |