Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP12-0017
Permit Details
Status:
Complete
Type:
Development Package
Address:
6100 E BROADWAY BL
Address NEW:
6100 E BROADWAY BL
Apply Date:
02/08/2012
Applicant:
Lisa Bowers
Description:
SITE/GRADING/ FOR NEW CAR SALES BUILDING, & REMODEL EXISTING CAR SALES BUILDING
Permit Reviews
Permit Number - DP12-0017
Permit Status: Complete
Permit Description: SITE/GRADING/ FOR NEW CAR SALES BUILDING, & REMODEL EXISTING CAR SALES BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/08/2012 | DEV PKG - OK TO SUBMIT | 02/08/2012 | COMPLETED |
| 02/08/2012 | DEV PKG | 04/03/2012 | COMPLETED |
| 04/03/2012 | RESUB - SITE/GRADING ALL | 05/22/2012 | COMPLETED |
| 05/22/2012 | RESUB - SITE and/or GRADING | 05/30/2012 | ACTIVE |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0017
Permit Description: SITE/GRADING/ FOR NEW CAR SALES BUILDING, & REMODEL EXISTING CAR SALES BUILDING
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2012 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/10/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) MAINTAIN SEDIMENT CONTROLS UNTIL SITE IS COMPLETED. 2) ADD SEDIMENT CONTROLS TO SW SIDE OF SITE OR ROUTINELY SWEEP SOIL BACK ONTO CONSTRUCTION AREA. 3) ENSURE YOU PERFORM REQUIRED SELF INSPECTIONS AND DOCUMENT THEM} ; {Activity date: 07/24/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - MET SUPERINTENDENT ON SITE, (DIVERSIFIED). DISCUSSED STORM WATER PERMIT, STORM WATER PLAN, AND GRADING PLAN. SITE HAS BEEN ROUGH GRADED AND SILT FENCE HAS BEEN INSTALLED ALONG TWO SIDES OF THE PROJECT. A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED.} |
|
| 08/30/2013 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/30/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 08/30/2013 | Final inspection to ensure all landscape and water harvesting SITE | Passed | {Activity date: 08/30/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 08/30/2013 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/30/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND OR CONCERNS AT THIS TIME} ; {Activity date: 06/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) LIMITED SITE WORK, CONTRACTOR WORKING ON THE BLDG} ; {Activity date: 04/05/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH SUPEINTENDENT AND DISCUSSED SITE WORK FOR PROJECT. 2) DURING THE REVIEW PROCESS IT WAS DETEMINED THAT THE SITE DISTURBANCE IS LESS THEN 1 ACRE; THEREFORE A STORM WATER PERMIT AND PLAN ARE NOT REQUIRED. 3) ENSURE THE ADJACENT ROADWAY IS SWEPT ROUTINELY DUE TO MINIMAL TRACKING OF SOIL FROM YOUR SITE 4) THE COT NEEDS CLARIFICATION FROM THE ENG OF RECORD FOR A 15,000 GAL RET/DET STORM WATER TANK TO BE INSTALLED. NO INLET DESCRIPTION, MATERIALS USED, SIZES, DIMENTIONS...ETC ARE SHOWN ON THE PLANS. SCOTT 214-460-6741} ; {Activity date: 01/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) VERIFIED PROGRESS OF CONSTRUCTION ON BLDG. 3) NO SIGNIFICANT CHANGES AND/OR CONCERNS} ; {Activity date: 12/13/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONCERNS OR CHANGES AT THIS TIME} ; {Activity date: 12/03/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AN/OR CONCERNS AT THIS TIME} ; {Activity date: 11/26/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 10/24/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES SINCE LAST INSPECTION. NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 10/23/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR IN SECOND PHASE OF PROJECT, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.} ; {Activity date: 10/09/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER AND/OR GRADING CONCERNS AT THIS TIME. SITE IS HALF OCCUPIED AND IS COMPLETED.} ; {Activity date: 09/19/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME.} ; {Activity date: 09/12/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME PAVING THIS WEEK} ; {Activity date: 09/05/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 08/29/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - CONTRACTOR FORMING AROUND EXISTING CATCH BASIN, AND WORKING ON BLDG. SOME CURBING HAS BEEN POURED. NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/21/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) ENSURE SIDEWALK RUN SLOPES ARE NO GREATER THAN 5%, AND CROSS SLOPES MUST BE NO GREATER THAN 2%. 2) NO STORM WATER CONCERNS AT THIS TIME. 3) RAIN > .5" LAST NIGHT, SEDIMENT CONTROLS IN PLACE, NI SIGNIFICANT CONCERNS. 4) NEED TO INSTALL CONCRETE VALLEY GUTTER AT NORTH SIDE OF LOT.} ; {Activity date: 08/10/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) MAINTAIN SEDIMENT CONTROLS UNTIL SITE IS COMPLETED. 2) ADD SEDIMENT CONTROLS TO SW SIDE OF SITE OR ROUTINELY SWEEP SOIL BACK ONTO CONSTRUCTION AREA. 3) ENSURE YOU PERFORM REQUIRED SELF INSPECTIONS AND DOCUMENT THEM MARIO - DIVERSIFIED 240 - 6403} ; {Activity date: 08/01/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME. STORM WATER CONTROLS HAVE BEEN INSTALLED FOR THIS PHASE OF THE PROJECT} |
|
| 08/30/2013 | ENGR Grading Final | Passed | {Activity date: 08/30/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 06/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME/ NO SITE WORK CONCERNS} ; {Activity date: 05/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) LIMITED SITE WORK, CONTRACTOR WORKING ON THE BLDG} ; {Activity date: 02/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH SUPEINTENDENT AND DISCUSSED SITE WORK FOR PROJECT. 2) DURING THE REVIEW PROCESS IT WAS DETEMINED THAT THE SITE DISTURBANCE IS LESS THEN 1 ACRE; THEREFORE A STORM WATER PERMIT AND PLAN ARE NOT REQUIRED. 3) ENSURE THE ADJACENT ROADWAY IS SWEPT ROUTINELY DUE TO MINIMAL TRACKING OF SOIL FROM YOUR SITE 4) THE COT NEEDS CLARIFICATION FROM THE ENG OF RECORD FOR A 15,000 GAL RET/DET STORM WATER TANK TO BE INSTALLED. NO INLET DESCRIPTION, MATERIALS USED, SIZES, DIMENTIONS...ETC ARE SHOWN ON THE PLANS. SCOTT 214-460-6741} ; {Activity date: 01/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) VERIFIED PROGRESS OF CONSTRUCTION ON BLDG. 3) NO SIGNIFICANT CHANGES AND/OR CONCERNS} ; {Activity date: 12/13/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONCERNS OR CHANGES AT THIS TIME} ; {Activity date: 12/03/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AN/OR CONCERNS AT THIS TIME} ; {Activity date: 10/24/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES SINCE LAST INSPECTION. NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 10/23/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR IN SECOND PHASE OF PROJECT, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.} ; {Activity date: 09/12/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME PAVING THIS WEEK} ; {Activity date: 09/05/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 08/29/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - CONTRACTOR FORMING AROUND EXISTING CATCH BASIN, AND WORKING ON BLDG. SOME CURBING HAS BEEN POURED. NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/21/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) ENSURE SIDEWALK RUN SLOPES ARE NO GREATER THAN 5%, AND CROSS SLOPES MUST BE NO GREATER THAN 2%. 2) NO STORM WATER CONCERNS AT THIS TIME. 3) RAIN > .5" LAST NIGHT, SEDIMENT CONTROLS IN PLACE, NI SIGNIFICANT CONCERNS. 4) NEED TO INSTALL CONCRETE VALLEY GUTTER AT NORTH SIDE OF LOT.} ; {Activity date: 08/01/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME. STORM WATER CONTROLS HAVE BEEN INSTALLED FOR THIS PHASE OF THE PROJECT CONTRACTOR WILL COMPLETE THE FIRST PHASE OF THE PROJECT PRIOR TO MOVING ON TO THE REMAINING SITE.} |
|
| 08/30/2013 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/30/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE IS ATBILIZED, ENSURE TO FILE YOUR NOTICE OF TERMINATION (NOT) WITH ADEQ} | |
| 08/30/2013 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/30/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/27/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - SOME SEDIMENT CONTROLS IN PLACE, SITE WORK WILL BE PHASED} | |
| 09/19/2013 | ENGR Engineering Final | Passed | {Activity date: 09/19/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/30/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL HATCHED STRIPING FOR PEDESTRIAN CROSSING SHOWN ON THE APPROVED PLANS 2) INSTALL RAILING FOR HC ACCESS RAMP 3) ENSURE CROSS SLOPE FOR HC PARKING AND ACCESS AT REAR OF SHOW ROOM IS NO >2%. 4) PROVIDE A CERT STATMENT FROM THE EOR AND AS-BUILT DRAWING} |
|
| 04/19/2017 | RSBU - Building Final | Passed | {Activity date: 04/19/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |