Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP12-0017
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2013 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by DROBERT5 - |
| 08/27/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND OR CONCERNS AT THIS TIME |
| 06/19/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME |
| 05/20/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) LIMITED SITE WORK, CONTRACTOR WORKING ON THE BLDG |
| 04/05/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 02/20/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) MET WITH SUPEINTENDENT AND DISCUSSED SITE WORK FOR PROJECT. 2) DURING THE REVIEW PROCESS IT WAS DETEMINED THAT THE SITE DISTURBANCE IS LESS THEN 1 ACRE; THEREFORE A STORM WATER PERMIT AND PLAN ARE NOT REQUIRED. 3) ENSURE THE ADJACENT ROADWAY IS SWEPT ROUTINELY DUE TO MINIMAL TRACKING OF SOIL FROM YOUR SITE 4) THE COT NEEDS CLARIFICATION FROM THE ENG OF RECORD FOR A 15,000 GAL RET/DET STORM WATER TANK TO BE INSTALLED. NO INLET DESCRIPTION, MATERIALS USED, SIZES, DIMENTIONS...ETC ARE SHOWN ON THE PLANS. SCOTT 214-460-6741 |
| 01/03/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) VERIFIED PROGRESS OF CONSTRUCTION ON BLDG. 3) NO SIGNIFICANT CHANGES AND/OR CONCERNS |
| 12/13/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO CONCERNS OR CHANGES AT THIS TIME |
| 12/03/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AN/OR CONCERNS AT THIS TIME |
| 11/26/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 10/24/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES SINCE LAST INSPECTION. NO SIGNIFICANT STORM WATER CONCERNS |
| 10/23/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR IN SECOND PHASE OF PROJECT, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
| 10/09/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER AND/OR GRADING CONCERNS AT THIS TIME. SITE IS HALF OCCUPIED AND IS COMPLETED. |
| 09/19/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME. |
| 09/12/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME PAVING THIS WEEK |
| 09/05/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME |
| 08/29/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - CONTRACTOR FORMING AROUND EXISTING CATCH BASIN, AND WORKING ON BLDG. SOME CURBING HAS BEEN POURED. NO STORM WATER CONCERNS AT THIS TIME |
| 08/21/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) ENSURE SIDEWALK RUN SLOPES ARE NO GREATER THAN 5%, AND CROSS SLOPES MUST BE NO GREATER THAN 2%. 2) NO STORM WATER CONCERNS AT THIS TIME. 3) RAIN > .5" LAST NIGHT, SEDIMENT CONTROLS IN PLACE, NI SIGNIFICANT CONCERNS. 4) NEED TO INSTALL CONCRETE VALLEY GUTTER AT NORTH SIDE OF LOT. |
| 08/10/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) MAINTAIN SEDIMENT CONTROLS UNTIL SITE IS COMPLETED. 2) ADD SEDIMENT CONTROLS TO SW SIDE OF SITE OR ROUTINELY SWEEP SOIL BACK ONTO CONSTRUCTION AREA. 3) ENSURE YOU PERFORM REQUIRED SELF INSPECTIONS AND DOCUMENT THEM MARIO - DIVERSIFIED 240 - 6403 |
| 08/01/2012 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME. STORM WATER CONTROLS HAVE BEEN INSTALLED FOR THIS PHASE OF THE PROJECT |