Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP12-0017
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2013 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 08/27/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME |
| 06/19/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME/ NO SITE WORK CONCERNS |
| 05/20/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) LIMITED SITE WORK, CONTRACTOR WORKING ON THE BLDG |
| 02/20/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) MET WITH SUPEINTENDENT AND DISCUSSED SITE WORK FOR PROJECT. 2) DURING THE REVIEW PROCESS IT WAS DETEMINED THAT THE SITE DISTURBANCE IS LESS THEN 1 ACRE; THEREFORE A STORM WATER PERMIT AND PLAN ARE NOT REQUIRED. 3) ENSURE THE ADJACENT ROADWAY IS SWEPT ROUTINELY DUE TO MINIMAL TRACKING OF SOIL FROM YOUR SITE 4) THE COT NEEDS CLARIFICATION FROM THE ENG OF RECORD FOR A 15,000 GAL RET/DET STORM WATER TANK TO BE INSTALLED. NO INLET DESCRIPTION, MATERIALS USED, SIZES, DIMENTIONS...ETC ARE SHOWN ON THE PLANS. SCOTT 214-460-6741 |
| 01/03/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) VERIFIED PROGRESS OF CONSTRUCTION ON BLDG. 3) NO SIGNIFICANT CHANGES AND/OR CONCERNS |
| 12/13/2012 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CONCERNS OR CHANGES AT THIS TIME |
| 12/03/2012 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AN/OR CONCERNS AT THIS TIME |
| 10/24/2012 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES SINCE LAST INSPECTION. NO SIGNIFICANT STORM WATER CONCERNS |
| 10/23/2012 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR IN SECOND PHASE OF PROJECT, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
| 09/12/2012 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME PAVING THIS WEEK |
| 09/05/2012 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME |
| 08/29/2012 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - CONTRACTOR FORMING AROUND EXISTING CATCH BASIN, AND WORKING ON BLDG. SOME CURBING HAS BEEN POURED. NO STORM WATER CONCERNS AT THIS TIME |
| 08/21/2012 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) ENSURE SIDEWALK RUN SLOPES ARE NO GREATER THAN 5%, AND CROSS SLOPES MUST BE NO GREATER THAN 2%. 2) NO STORM WATER CONCERNS AT THIS TIME. 3) RAIN > .5" LAST NIGHT, SEDIMENT CONTROLS IN PLACE, NI SIGNIFICANT CONCERNS. 4) NEED TO INSTALL CONCRETE VALLEY GUTTER AT NORTH SIDE OF LOT. |
| 08/01/2012 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME. STORM WATER CONTROLS HAVE BEEN INSTALLED FOR THIS PHASE OF THE PROJECT CONTRACTOR WILL COMPLETE THE FIRST PHASE OF THE PROJECT PRIOR TO MOVING ON TO THE REMAINING SITE. |