Parcel Search: 11508007F
Parcel Search
Parcel Attributes
| Parcel | 11508007F |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | OCR-1 |
| Tucson Ward | Ward 3 |
| Tucson Downtown Incentive Zone | Downtown Infill Incentive District |
| Tucson Registered Neighborhood | Feldman's |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/21/2026 5:08 p.m.
Total Number Of OZC Plans - (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| 1/4 Mile Each Direction (N, E, S, W) | 202 | 08/17/1905 |
Permits
Parcel Number - 11508007F
Date - 08/21/2026 5:08 p.m.
Total Number Of Permits - (3)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0226-00224 | Issued | 02/06/2026 | 05/05/2026 | Right-of-Way (ROW) - Utility | Zayo Contractor (ADB Companies) to install conduit/fiber for an estimated 5,261 LF within City of Tucson ROW. Zayo Handholes to be installed every 2,000 LF to future maintenance/access. Renew permit for 90 days as of 05/05/2026, new expiration date is 08/03/2026. | |
| T16EX01834 | Final | 05/11/2016 | 03/28/2017 | EXCAV | REMOVE EXISTING ASPHALT ROADWAY, CURB, SIDEWALK, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND THE TRAFFIC SIGNALS AT STONE/DRACHMAN AND STONE/SPEEDWAY. A NEW ASPHALT ROADWAY WILL BE CONSTRUCTED WITH NEW CURB, SIDEWALKS, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND TRAFFIC SIGNALS AT THE INTERSECTIONS. NEW BUS BULLOUTS ON THE SW CORNER OF STONE/DRACHMAN, AS WELL AS THE SW AND NE CORNERS OF STONE/SPEEDWAY. ADDITIONALLY, NEW MEDIAN ISLANDS, LANDSCAPING, IRRIGATION, WATER MAINS, AND A DRAINAGE STRUCTURE AT STONE/MABEL. 10/12/2016- RENEWED R1 | |
| T16TC01158 | Expired | 05/11/2016 | N/A | BARRICAD | REMOVE EXISTING ASHALT ROADWAY, CURB, SIDEWALK, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND THE TRAFFIC SIGNALS AT STONE/DRACHMAN AND STONE/SPEEDWAY. A NEW ASPHALT ROADWAY WILL BE CONSTRUCTED WITH NEW CURB, SIDEWALKS, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND TRAFFIC SIGNALS AT THE INTERSECTIONS. NEW BUS BULLOUTS ON THE SW CORNER OF STONE/DRACHMAN, AS WELL AS THE SW AND NE CORNERS OF STONE/SPEEDWAY. ADDITIONALLY, NEW MEDIAN ISLANDS, LANDSCAPING, IRRIGATION, WATER MAINS, AND A DRAINAGE STRUCTURE AT STONE/MABEL. |