Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel11508007F
JurisdictionTucson, Pima County
City of Tucson ZoningOCR-1
Tucson WardWard 3
Tucson Downtown Incentive ZoneDowntown Infill Incentive District
Tucson Registered NeighborhoodFeldman's
Major Street & Route

Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 1360 N STONE AV
Date - 08/22/2026 1:41 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
1/4 Mile Each Direction (N, E, S, W) 202

Permits

Address: 1360 N STONE AV
Date - 08/22/2026 1:41 a.m.
Total Number Of Permits - (5)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-0226-00224 Issued 02/06/2026 05/05/2026 Right-of-Way (ROW) - Utility Zayo Contractor (ADB Companies) to install conduit/fiber for an estimated 5,261 LF within City of Tucson ROW. Zayo Handholes to be installed every 2,000 LF to future maintenance/access. Renew permit for 90 days as of 05/05/2026, new expiration date is 08/03/2026.
T08AN00178 ISSUED 02/15/2008 N/A ADDRNEW
T16EX01834 FINAL 05/11/2016 03/28/2017 EXCAV REMOVE EXISTING ASPHALT ROADWAY, CURB, SIDEWALK, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND THE TRAFFIC SIGNALS AT STONE/DRACHMAN AND STONE/SPEEDWAY. A NEW ASPHALT ROADWAY WILL BE CONSTRUCTED WITH NEW CURB, SIDEWALKS, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND TRAFFIC SIGNALS AT THE INTERSECTIONS. NEW BUS BULLOUTS ON THE SW CORNER OF STONE/DRACHMAN, AS WELL AS THE SW AND NE CORNERS OF STONE/SPEEDWAY. ADDITIONALLY, NEW MEDIAN ISLANDS, LANDSCAPING, IRRIGATION, WATER MAINS, AND A DRAINAGE STRUCTURE AT STONE/MABEL. 10/12/2016- RENEWED R1
T16TC01158 EXPIRED 05/11/2016 N/A BARRICAD REMOVE EXISTING ASHALT ROADWAY, CURB, SIDEWALK, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND THE TRAFFIC SIGNALS AT STONE/DRACHMAN AND STONE/SPEEDWAY. A NEW ASPHALT ROADWAY WILL BE CONSTRUCTED WITH NEW CURB, SIDEWALKS, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND TRAFFIC SIGNALS AT THE INTERSECTIONS. NEW BUS BULLOUTS ON THE SW CORNER OF STONE/DRACHMAN, AS WELL AS THE SW AND NE CORNERS OF STONE/SPEEDWAY. ADDITIONALLY, NEW MEDIAN ISLANDS, LANDSCAPING, IRRIGATION, WATER MAINS, AND A DRAINAGE STRUCTURE AT STONE/MABEL.
T17RW02782 WITHDRWN 06/26/2017 N/A ROW ENROLL-A-THON 2017 ON DRACHMAN BTWN STONE AV AND 7TH AV